0000003570false--12-312025Q2http://fasb.org/us-gaap/2025#Revenueshttp://fasb.org/us-gaap/2025#Revenueshttp://fasb.org/us-gaap/2025#Revenueshttp://fasb.org/us-gaap/2025#Revenueshttp://fasb.org/us-gaap/2025#DerivativeAssetsCurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsCurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesCurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesCurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsCurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsCurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeAssetsNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesCurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesCurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2025#DerivativeLiabilitiesNoncurrentSOFR or base rateSOFR or base rateSOFR or base rateSOFR or base rateSOFR or base rate1xbrli:sharesiso4217:USDiso4217:USDxbrli:shareslng:milliontonnesutr:Ylng:unitlng:itemutr:mixbrli:purelng:tbtulng:units00000035702025-01-012025-06-3000000035702025-08-010000003570lng:LiquefiedNaturalGasMember2025-04-012025-06-300000003570lng:LiquefiedNaturalGasMember2024-04-012024-06-300000003570lng:LiquefiedNaturalGasMember2025-01-012025-06-300000003570lng:LiquefiedNaturalGasMember2024-01-012024-06-300000003570lng:RegasificationServiceMember2025-04-012025-06-300000003570lng:RegasificationServiceMember2024-04-012024-06-300000003570lng:RegasificationServiceMember2025-01-012025-06-300000003570lng:RegasificationServiceMember2024-01-012024-06-300000003570us-gaap:ProductAndServiceOtherMember2025-04-012025-06-300000003570us-gaap:ProductAndServiceOtherMember2024-04-012024-06-300000003570us-gaap:ProductAndServiceOtherMember2025-01-012025-06-300000003570us-gaap:ProductAndServiceOtherMember2024-01-012024-06-3000000035702025-04-012025-06-3000000035702024-04-012024-06-3000000035702024-01-012024-06-3000000035702025-06-3000000035702024-12-310000003570us-gaap:VariableInterestEntityPrimaryBeneficiaryMember2025-06-300000003570us-gaap:CommonStockMember2024-12-310000003570us-gaap:TreasuryStockCommonMember2024-12-310000003570us-gaap:AdditionalPaidInCapitalMember2024-12-310000003570us-gaap:RetainedEarningsMember2024-12-310000003570us-gaap:NoncontrollingInterestMember2024-12-310000003570lng:RedeemableNoncontrollingInterestMember2024-12-310000003570us-gaap:CommonStockMember2025-01-012025-03-310000003570us-gaap:TreasuryStockCommonMember2025-01-012025-03-310000003570us-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-310000003570us-gaap:RetainedEarningsMember2025-01-012025-03-310000003570us-gaap:NoncontrollingInterestMember2025-01-012025-03-3100000035702025-01-012025-03-310000003570lng:RedeemableNoncontrollingInterestMember2025-01-012025-03-310000003570lng:O2025Q1DividendsMember2025-01-012025-03-310000003570us-gaap:CommonStockMember2025-03-310000003570us-gaap:TreasuryStockCommonMember2025-03-310000003570us-gaap:AdditionalPaidInCapitalMember2025-03-310000003570us-gaap:RetainedEarningsMember2025-03-310000003570us-gaap:NoncontrollingInterestMember2025-03-3100000035702025-03-310000003570lng:RedeemableNoncontrollingInterestMember2025-03-310000003570us-gaap:CommonStockMember2025-04-012025-06-300000003570us-gaap:TreasuryStockCommonMember2025-04-012025-06-300000003570us-gaap:AdditionalPaidInCapitalMember2025-04-012025-06-300000003570us-gaap:RetainedEarningsMember2025-04-012025-06-300000003570us-gaap:NoncontrollingInterestMember2025-04-012025-06-300000003570lng:RedeemableNoncontrollingInterestMember2025-04-012025-06-300000003570lng:O2025Q21DividendsMember2025-04-012025-06-300000003570lng:O2025Q22DividendsMember2025-04-012025-06-300000003570us-gaap:CommonStockMember2025-06-300000003570us-gaap:TreasuryStockCommonMember2025-06-300000003570us-gaap:AdditionalPaidInCapitalMember2025-06-300000003570us-gaap:RetainedEarningsMember2025-06-300000003570us-gaap:NoncontrollingInterestMember2025-06-300000003570lng:RedeemableNoncontrollingInterestMember2025-06-300000003570us-gaap:CommonStockMember2023-12-310000003570us-gaap:TreasuryStockCommonMember2023-12-310000003570us-gaap:AdditionalPaidInCapitalMember2023-12-310000003570us-gaap:RetainedEarningsMember2023-12-310000003570us-gaap:NoncontrollingInterestMember2023-12-3100000035702023-12-310000003570lng:RedeemableNoncontrollingInterestMember2023-12-310000003570us-gaap:CommonStockMember2024-01-012024-03-310000003570us-gaap:TreasuryStockCommonMember2024-01-012024-03-310000003570us-gaap:AdditionalPaidInCapitalMember2024-01-012024-03-310000003570us-gaap:RetainedEarningsMember2024-01-012024-03-310000003570us-gaap:NoncontrollingInterestMember2024-01-012024-03-3100000035702024-01-012024-03-310000003570lng:O2024Q1DividendsMember2024-01-012024-03-310000003570lng:RedeemableNoncontrollingInterestMember2024-01-012024-03-310000003570us-gaap:CommonStockMember2024-03-310000003570us-gaap:TreasuryStockCommonMember2024-03-310000003570us-gaap:AdditionalPaidInCapitalMember2024-03-310000003570us-gaap:RetainedEarningsMember2024-03-310000003570us-gaap:NoncontrollingInterestMember2024-03-3100000035702024-03-310000003570lng:RedeemableNoncontrollingInterestMember2024-03-310000003570us-gaap:CommonStockMember2024-04-012024-06-300000003570us-gaap:TreasuryStockCommonMember2024-04-012024-06-300000003570us-gaap:AdditionalPaidInCapitalMember2024-04-012024-06-300000003570us-gaap:RetainedEarningsMember2024-04-012024-06-300000003570us-gaap:NoncontrollingInterestMember2024-04-012024-06-300000003570lng:O2024Q21DividendsMember2024-04-012024-06-300000003570lng:O2024Q22DividendsMember2024-04-012024-06-300000003570lng:RedeemableNoncontrollingInterestMember2024-04-012024-06-300000003570us-gaap:CommonStockMember2024-06-300000003570us-gaap:TreasuryStockCommonMember2024-06-300000003570us-gaap:AdditionalPaidInCapitalMember2024-06-300000003570us-gaap:RetainedEarningsMember2024-06-300000003570us-gaap:NoncontrollingInterestMember2024-06-3000000035702024-06-300000003570lng:RedeemableNoncontrollingInterestMember2024-06-300000003570lng:OperationalAndUnderConstructionMember2025-01-012025-06-300000003570lng:UnderConstructionMember2025-01-012025-06-300000003570lng:OperationalStatusMemberlng:SabinePassLNGTerminalMember2025-01-012025-06-300000003570lng:SabinePassLNGTerminalMember2025-01-012025-06-300000003570lng:CreoleTrailPipelineMember2025-01-012025-06-300000003570lng:CheniereEnergyPartnersLPMemberus-gaap:GeneralPartnerMember2025-01-012025-06-300000003570lng:CheniereEnergyPartnersLPMember2025-01-012025-06-300000003570lng:OperationalAndUnderConstructionMemberlng:CorpusChristiLNGTerminalMember2025-01-012025-06-300000003570lng:UnderConstructionMemberlng:CorpusChristiLNGTerminalMember2025-01-012025-06-300000003570lng:CorpusChristiLNGTerminalMember2025-01-012025-06-300000003570lng:CorpusChristiPipelineMember2025-01-012025-06-300000003570lng:OperationalAndUnderConstructionMemberlng:CorpusChristiStage3ProjectMember2025-01-012025-06-300000003570lng:CorpusChristiStage3ProjectMember2025-01-012025-06-300000003570lng:MidscaleTrains89ProjectMember2025-01-012025-06-300000003570lng:UnderConstructionMemberlng:MidscaleTrains89ProjectMember2025-01-012025-06-300000003570lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember2025-06-300000003570lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember2024-12-310000003570lng:CheniereMarketingLLCMember2025-06-300000003570lng:CheniereMarketingLLCMember2024-12-310000003570lng:OtherSubsidiariesMember2025-06-300000003570lng:OtherSubsidiariesMember2024-12-310000003570lng:MaterialsInventoryMember2025-06-300000003570lng:MaterialsInventoryMember2024-12-310000003570lng:LiquefiedNaturalGasInventoryMember2025-06-300000003570lng:LiquefiedNaturalGasInventoryMember2024-12-310000003570lng:LiquefiedNaturalGasInTransitInventoryMember2025-06-300000003570lng:LiquefiedNaturalGasInTransitInventoryMember2024-12-310000003570lng:NaturalGasInventoryMember2025-06-300000003570lng:NaturalGasInventoryMember2024-12-310000003570lng:OtherInventoryMember2025-06-300000003570lng:OtherInventoryMember2024-12-310000003570lng:TerminalAndInterconnectingPipelineFacilitiesMember2025-06-300000003570lng:TerminalAndInterconnectingPipelineFacilitiesMember2024-12-310000003570us-gaap:LandAndLandImprovementsMember2025-06-300000003570us-gaap:LandAndLandImprovementsMember2024-12-310000003570us-gaap:ConstructionInProgressMember2025-06-300000003570us-gaap:ConstructionInProgressMember2024-12-310000003570lng:TerminalAndRelatedAssetsMember2025-06-300000003570lng:TerminalAndRelatedAssetsMember2024-12-310000003570us-gaap:OfficeEquipmentMember2025-06-300000003570us-gaap:OfficeEquipmentMember2024-12-310000003570us-gaap:FurnitureAndFixturesMember2025-06-300000003570us-gaap:FurnitureAndFixturesMember2024-12-310000003570us-gaap:SoftwareAndSoftwareDevelopmentCostsMember2025-06-300000003570us-gaap:SoftwareAndSoftwareDevelopmentCostsMember2024-12-310000003570us-gaap:LeaseholdImprovementsMember2025-06-300000003570us-gaap:LeaseholdImprovementsMember2024-12-310000003570us-gaap:OtherCapitalizedPropertyPlantAndEquipmentMember2025-06-300000003570us-gaap:OtherCapitalizedPropertyPlantAndEquipmentMember2024-12-310000003570lng:FixedAssetsMember2025-06-300000003570lng:FixedAssetsMember2024-12-310000003570us-gaap:AssetsHeldUnderCapitalLeasesMember2025-06-300000003570us-gaap:AssetsHeldUnderCapitalLeasesMember2024-12-310000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel1Member2025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel2Member2025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Member2025-06-300000003570us-gaap:PriceRiskDerivativeMember2025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel1Member2024-12-310000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel2Member2024-12-310000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Member2024-12-310000003570us-gaap:PriceRiskDerivativeMember2024-12-310000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel1Member2025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel2Member2025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel3Member2025-06-300000003570lng:LNGTradingDerivativeMember2025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel1Member2024-12-310000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel2Member2024-12-310000003570lng:LNGTradingDerivativeMemberus-gaap:FairValueInputsLevel3Member2024-12-310000003570lng:LNGTradingDerivativeMember2024-12-310000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel1Member2025-06-300000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel2Member2025-06-300000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel3Member2025-06-300000003570us-gaap:ForeignExchangeContractMember2025-06-300000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel1Member2024-12-310000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel2Member2024-12-310000003570us-gaap:ForeignExchangeContractMemberus-gaap:FairValueInputsLevel3Member2024-12-310000003570us-gaap:ForeignExchangeContractMember2024-12-310000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MarketApproachValuationTechniqueMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MarketApproachValuationTechniqueMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MarketApproachValuationTechniqueMembersrt:WeightedAverageMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:ValuationTechniqueOptionPricingModelMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:ValuationTechniqueOptionPricingModelMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:ValuationTechniqueOptionPricingModelMembersrt:WeightedAverageMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMember2025-03-310000003570us-gaap:PriceRiskDerivativeMember2024-03-310000003570us-gaap:PriceRiskDerivativeMember2023-12-310000003570us-gaap:PriceRiskDerivativeMember2025-04-012025-06-300000003570us-gaap:PriceRiskDerivativeMember2024-04-012024-06-300000003570us-gaap:PriceRiskDerivativeMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMember2024-01-012024-06-300000003570us-gaap:PriceRiskDerivativeMember2024-06-300000003570us-gaap:PriceRiskDerivativeMembersrt:MaximumMember2025-01-012025-06-300000003570lng:LNGTradingDerivativeMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:CommodityContractMember2025-01-012025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:SalesMember2025-04-012025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:SalesMember2024-04-012024-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:SalesMember2025-01-012025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:SalesMember2024-01-012024-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:CostOfSalesMember2025-04-012025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:CostOfSalesMember2024-04-012024-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:CostOfSalesMember2025-01-012025-06-300000003570lng:LNGTradingDerivativeMemberus-gaap:CostOfSalesMember2024-01-012024-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:SalesMember2025-04-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:SalesMember2024-04-012024-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:SalesMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:SalesMember2024-01-012024-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:CostOfSalesMember2025-04-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:CostOfSalesMember2024-04-012024-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:CostOfSalesMember2025-01-012025-06-300000003570us-gaap:PriceRiskDerivativeMemberus-gaap:CostOfSalesMember2024-01-012024-06-300000003570us-gaap:ForeignExchangeContractMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:ForeignExchangeContractMember2025-01-012025-06-300000003570us-gaap:ForeignExchangeContractMember2024-01-012024-06-300000003570us-gaap:ForeignExchangeContractMember2024-04-012024-06-300000003570us-gaap:ForeignExchangeContractMember2025-04-012025-06-300000003570lng:PriceRiskDerivativeAssetMember2025-06-300000003570lng:LNGTradingDerivativeAssetMember2025-06-300000003570lng:ForeignExchangeContractAssetMember2025-06-300000003570lng:PriceRiskDerivativeLiabilityMember2025-06-300000003570lng:LNGTradingDerivativesLiabilityMember2025-06-300000003570lng:ForeignExchangeContractLiabilityMember2025-06-300000003570lng:PriceRiskDerivativeAssetMember2024-12-310000003570lng:LNGTradingDerivativeAssetMember2024-12-310000003570lng:ForeignExchangeContractAssetMember2024-12-310000003570lng:PriceRiskDerivativeLiabilityMember2024-12-310000003570lng:LNGTradingDerivativesLiabilityMember2024-12-310000003570lng:ForeignExchangeContractLiabilityMember2024-12-310000003570lng:BlackstoneInc.AndBrookfieldAssetManagementInc.AndThePublicMember2025-01-012025-06-300000003570us-gaap:VariableInterestEntityPrimaryBeneficiaryMember2025-01-012025-06-300000003570us-gaap:VariableInterestEntityPrimaryBeneficiaryMember2024-12-310000003570lng:A2025SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:A2025SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:A2026SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:A2026SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:A2027SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:A2027SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:A2028SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:A2028SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:A2030SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:A2030SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:A2037SabinePassLiquefactionNotesMembersrt:WeightedAverageMember2025-06-300000003570lng:A2037SabinePassLiquefactionNotesMember2025-06-300000003570lng:A2037SabinePassLiquefactionNotesMember2024-12-310000003570lng:SabinePassLiquefactionSeniorNotesMember2025-06-300000003570lng:SabinePassLiquefactionSeniorNotesMember2024-12-310000003570lng:SPLRevolvingCreditFacilityMember2025-06-300000003570lng:SPLRevolvingCreditFacilityMember2024-12-310000003570lng:SabinePassLiquefactionMember2025-06-300000003570lng:SabinePassLiquefactionMember2024-12-310000003570lng:A2029CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:A2029CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:A2031CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:A2031CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:A2032CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:A2032CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:A2033CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:A2033CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:A2034CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:A2034CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:CheniereEnergyPartnersSeniorNotesMember2025-06-300000003570lng:CheniereEnergyPartnersSeniorNotesMember2024-12-310000003570lng:CQPRevolvingCreditFacilityMember2025-06-300000003570lng:CQPRevolvingCreditFacilityMember2024-12-310000003570lng:CheniereEnergyPartnersLPMember2025-06-300000003570lng:CheniereEnergyPartnersLPMember2024-12-310000003570lng:A2027CorpusChristiHoldingsSeniorNotesMember2025-06-300000003570lng:A2027CorpusChristiHoldingsSeniorNotesMember2024-12-310000003570lng:A2029CorpusChristiHoldingsSeniorNotesMember2025-06-300000003570lng:A2029CorpusChristiHoldingsSeniorNotesMember2024-12-310000003570lng:A2039CorpusChristiHoldingsSeniorNotesMembersrt:WeightedAverageMember2025-06-300000003570lng:A2039CorpusChristiHoldingsSeniorNotesMember2025-06-300000003570lng:A2039CorpusChristiHoldingsSeniorNotesMember2024-12-310000003570lng:CorpusChristiHoldingsSeniorNotesMember2025-06-300000003570lng:CorpusChristiHoldingsSeniorNotesMember2024-12-310000003570lng:A2015CCHTermLoanFacilityMember2025-06-300000003570lng:A2015CCHTermLoanFacilityMember2024-12-310000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMember2025-06-300000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMember2024-12-310000003570lng:CheniereCorpusChristiHoldingsLLCMember2025-06-300000003570lng:CheniereCorpusChristiHoldingsLLCMember2024-12-310000003570lng:A2028CheniereSeniorSecuredNotesMember2025-06-300000003570lng:A2028CheniereSeniorSecuredNotesMember2024-12-310000003570lng:A2034CheniereSeniorNotesMember2025-06-300000003570lng:A2034CheniereSeniorNotesMember2024-12-310000003570lng:CheniereSeniorNotesMember2025-06-300000003570lng:CheniereSeniorNotesMember2024-12-310000003570lng:CheniereRevolvingCreditFacilityMember2025-06-300000003570lng:CheniereRevolvingCreditFacilityMember2024-12-310000003570srt:ParentCompanyMember2025-06-300000003570srt:ParentCompanyMember2024-12-310000003570lng:A2035CheniereEnergyPartnersSeniorNotesMemberus-gaap:SubsequentEventMember2031-07-310000003570lng:A2035CheniereEnergyPartnersSeniorNotesMemberus-gaap:SubsequentEventMember2025-07-100000003570lng:A2026SabinePassLiquefactionSeniorNotesMemberus-gaap:SubsequentEventMember2025-07-012025-07-310000003570lng:SPLRevolvingCreditFacilityMemberus-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:SPLRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:SPLRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:SPLRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:SPLRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:CQPRevolvingCreditFacilityMemberus-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CQPRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CQPRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CQPRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CQPRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:A2015CCHTermLoanFacilityMemberus-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMember2025-01-012025-06-300000003570lng:A2015CCHTermLoanFacilityMemberus-gaap:BaseRateMember2025-01-012025-06-300000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMemberus-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:CheniereRevolvingCreditFacilityMemberus-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CheniereRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:CheniereRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CheniereRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570us-gaap:BaseRateMemberlng:CheniereRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:SPLRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570lng:SPLRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:CQPRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570lng:CQPRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:A2015CCHTermLoanFacilityMember2025-01-012025-06-300000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:CheniereRevolvingCreditFacilityMembersrt:MinimumMember2025-01-012025-06-300000003570lng:CheniereRevolvingCreditFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570us-gaap:LetterOfCreditMemberlng:SPLRevolvingCreditFacilityMembersrt:MinimumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:SPLRevolvingCreditFacilityMembersrt:MaximumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CQPRevolvingCreditFacilityMembersrt:MinimumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CQPRevolvingCreditFacilityMembersrt:MaximumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MinimumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CorpusChristiHoldingsWorkingCapitalFacilityMembersrt:MaximumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CheniereRevolvingCreditFacilityMembersrt:MinimumMember2025-06-300000003570us-gaap:LetterOfCreditMemberlng:CheniereRevolvingCreditFacilityMembersrt:MaximumMember2025-06-300000003570lng:SPLRevolvingCreditFacilityMember2025-01-012025-06-300000003570lng:CQPRevolvingCreditFacilityMember2025-01-012025-06-300000003570lng:CorpusChristiHoldingsWorkingCapitalFacilityMember2025-01-012025-06-300000003570lng:CheniereRevolvingCreditFacilityMember2025-01-012025-06-300000003570lng:A2015CCHTermLoanFacilityMembersrt:MaximumMember2025-01-012025-06-300000003570lng:ARRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2025-08-010000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:ARRevolvingCreditFacilityMembersrt:MinimumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:ARRevolvingCreditFacilityMembersrt:MaximumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570us-gaap:BaseRateMemberlng:ARRevolvingCreditFacilityMembersrt:MinimumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570us-gaap:BaseRateMemberlng:ARRevolvingCreditFacilityMembersrt:MaximumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570us-gaap:SecuredOvernightFinancingRateSofrOvernightIndexSwapRateMemberlng:ARRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570us-gaap:BaseRateMemberlng:ARRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570lng:ARRevolvingCreditFacilityMembersrt:MinimumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570lng:ARRevolvingCreditFacilityMembersrt:MaximumMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570lng:ARRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2025-08-012025-08-010000003570lng:ARRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2025-08-070000003570lng:SabinePassLiquefactionAndCheniereCorpusChristiHoldingsMember2025-01-012025-06-300000003570us-gaap:CarryingReportedAmountFairValueDisclosureMemberlng:FairValueInputsLevel2AndLevel3Memberus-gaap:SeniorNotesMember2025-06-300000003570us-gaap:EstimateOfFairValueFairValueDisclosureMemberlng:FairValueInputsLevel2AndLevel3Memberus-gaap:SeniorNotesMember2025-06-300000003570us-gaap:CarryingReportedAmountFairValueDisclosureMemberlng:FairValueInputsLevel2AndLevel3Memberus-gaap:SeniorNotesMember2024-12-310000003570us-gaap:EstimateOfFairValueFairValueDisclosureMemberlng:FairValueInputsLevel2AndLevel3Memberus-gaap:SeniorNotesMember2024-12-310000003570us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel3Memberus-gaap:SeniorNotesMember2025-06-300000003570us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel3Memberus-gaap:SeniorNotesMember2024-12-310000003570srt:MaximumMember2025-06-300000003570lng:LiquefiedNaturalGasMember2025-07-012025-06-300000003570lng:LiquefiedNaturalGasMember2025-01-012024-12-310000003570lng:RegasificationServiceMember2025-07-012025-06-300000003570lng:RegasificationServiceMember2025-01-012024-12-3100000035702025-07-012025-06-3000000035702025-01-012024-12-310000003570us-gaap:ProductAndServiceOtherMemberus-gaap:EquityMethodInvesteeMemberlng:OperationAgreementAndConstructionManagementAgreementMember2025-04-012025-06-300000003570us-gaap:ProductAndServiceOtherMemberus-gaap:EquityMethodInvesteeMemberlng:OperationAgreementAndConstructionManagementAgreementMember2024-04-012024-06-300000003570us-gaap:ProductAndServiceOtherMemberus-gaap:EquityMethodInvesteeMemberlng:OperationAgreementAndConstructionManagementAgreementMember2025-01-012025-06-300000003570us-gaap:ProductAndServiceOtherMemberus-gaap:EquityMethodInvesteeMemberlng:OperationAgreementAndConstructionManagementAgreementMember2024-01-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:EquityMethodInvesteeMember2025-04-012025-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:EquityMethodInvesteeMember2024-04-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:EquityMethodInvesteeMember2025-01-012025-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:EquityMethodInvesteeMember2024-01-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:RelatedPartyMember2025-04-012025-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:RelatedPartyMember2024-04-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:RelatedPartyMember2025-01-012025-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberus-gaap:RelatedPartyMember2024-01-012024-06-300000003570us-gaap:ProductAndServiceOtherMemberlng:EquityMethodInvesteeSoldMemberlng:OperationAgreementAndConstructionManagementAgreementMember2025-01-012025-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberlng:EquityMethodInvesteeSoldMember2025-01-012025-06-300000003570us-gaap:ProductAndServiceOtherMemberlng:EquityMethodInvesteeSoldMemberlng:OperationAgreementAndConstructionManagementAgreementMember2024-04-012024-06-300000003570us-gaap:ProductAndServiceOtherMemberlng:EquityMethodInvesteeSoldMemberlng:OperationAgreementAndConstructionManagementAgreementMember2024-01-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberlng:EquityMethodInvesteeSoldMember2024-04-012024-06-300000003570lng:NaturalGasTransportationAndStorageAgreementsMemberlng:EquityMethodInvesteeSoldMember2024-01-012024-06-300000003570us-gaap:RelatedPartyMember2025-06-300000003570us-gaap:RelatedPartyMember2024-12-310000003570us-gaap:SubsequentEventMember2025-07-042025-07-040000003570lng:BeforeEnactmentOfNewActMemberus-gaap:SubsequentEventMember2025-07-042025-07-040000003570lng:AfterEnactmentOfNewActMemberus-gaap:SubsequentEventMember2025-07-042025-07-040000003570lng:CustomerAMemberus-gaap:CustomerConcentrationRiskMemberlng:AccountsReceivableAndContractAssetsMember2025-01-012025-06-300000003570lng:CustomerAMemberus-gaap:CustomerConcentrationRiskMemberlng:AccountsReceivableAndContractAssetsMember2024-01-012024-12-310000003570lng:CustomerBMemberus-gaap:CustomerConcentrationRiskMemberus-gaap:SalesRevenueNetMember2024-04-012024-06-300000003570lng:CustomerBMemberus-gaap:CustomerConcentrationRiskMemberus-gaap:SalesRevenueNetMember2024-01-012024-06-30
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended June 30, 2025
or
☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period fromto
Commission file number 001-16383
CHENIERE ENERGY, INC.
(Exact name of registrant as specified in its charter)
Delaware
95-4352386
(State or other jurisdiction of incorporation or organization)
(I.R.S. Employer Identification No.)
845 Texas Avenue, Suite 1250
Houston, Texas77002
(Address of principal executive offices) (Zip Code)
(713) 375-5000
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol
Name of each exchange on which registered
Common Stock, $ 0.003 par value
LNG
New York Stock Exchange
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer
☒
Accelerated filer
☐
Non-accelerated filer
☐
Smaller reporting company
☐
Emerging growth company
☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒
As of August 1, 2025, the issuer had 219,768,104 shares of Common Stock outstanding.
As used in this quarterly report, the terms listed below have the following meanings:
Common Industry and Other Terms
ASU
Accounting Standards Update
Bcf/d
billion cubic feet per day
Bcfe
billion cubic feet equivalent
DOE
U.S. Department of Energy
EPC
engineering, procurement and construction
FASB
Financial Accounting Standards Board
FERC
Federal Energy Regulatory Commission
FID
final investment decision
FTA countries
countries with which the United States has a free trade agreement providing for national treatment for trade in natural gas
GAAP
generally accepted accounting principles in the United States
Henry Hub
the final settlement price (in U.S. dollars per MMBtu) for the New York Mercantile Exchange’s Henry Hub natural gas futures contract for the month in which a relevant cargo’s delivery window is scheduled to begin
IPM agreements
integrated production marketing agreements in which the gas producer sells to us gas on a global LNG or natural gas index price, less a fixed liquefaction fee, shipping and other costs
LNG
liquefied natural gas, a product of natural gas that, through a refrigeration process, has been cooled to a liquid state, which occupies a volume that is approximately 1/600th of its gaseous state
MMBtu
million British thermal units; one British thermal unit measures the amount of energy required to raise the temperature of one pound of water by one degree Fahrenheit
mtpa
million tonnes per annum
NGA
Natural Gas Act of 1938, as amended
non-FTA countries
countries with which the United States does not have a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted
SEC
U.S. Securities and Exchange Commission
SOFR
Secured Overnight Financing Rate
SPA
LNG sale and purchase agreement
TBtu
trillion British thermal units; one British thermal unit measures the amount of energy required to raise the temperature of one pound of water by one degree Fahrenheit
Train
an industrial facility comprised of a series of refrigerant compressor loops used to cool natural gas into LNG
The following diagram depicts our abbreviated legal entity structure as of June 30, 2025, including our ownership of certain subsidiaries, and the references to these entities used in this quarterly report:
Unless the context requires otherwise, references to the “Company,” “we,” “us” and “our” refer to Cheniere Energy, Inc. and its consolidated subsidiaries, including our publicly traded subsidiary, CQP.
Cost of sales (excluding operating and maintenance expense and depreciation, amortization and accretion expense shown separately below)
1,117
784
4,688
3,020
Operating and maintenance expense
559
463
1,032
914
Selling, general and administrative expense
99
99
215
200
Depreciation, amortization and accretion expense
329
304
641
606
Other operating costs and expenses
7
13
18
22
Total operating costs and expenses
2,111
1,663
6,594
4,762
Income from operations
2,530
1,588
3,491
2,742
Other income (expense)
Interest expense, net of capitalized interest
(237)
(257)
(466)
(523)
Loss on modification or extinguishment of debt
—
(9)
—
(9)
Interest and dividend income
31
47
68
108
Other income (expense), net
(1)
3
19
2
Total other expense
(207)
(216)
(379)
(422)
Income before income taxes and non-controlling interests
2,323
1,372
3,112
2,320
Less: income tax provision
426
210
547
319
Net income
1,897
1,162
2,565
2,001
Less: net income attributable to non-controlling interests
271
282
586
619
Net income attributable to Cheniere
$
1,626
$
880
$
1,979
$
1,382
Net income per share attributable to common stockholders—basic (1)
$
7.32
$
3.85
$
8.87
$
5.97
Net income per share attributable to common stockholders—diluted (1)
$
7.30
$
3.84
$
8.85
$
5.96
Weighted average number of common shares outstanding—basic
221.8
228.4
222.6
231.3
Weighted average number of common shares outstanding—diluted
222.3
228.9
223.2
231.9
___________________
(1)In computing basic and diluted net income per share attributable to common stockholders, net income attributable to Cheniere is adjusted for the remeasurement of the redeemable non-controlling interest, net of tax, to its redemption value, as required under the two-class method. See Note 13—Net Income per Share Attributable to Common Stockholders for the full computation.
The accompanying notes are an integral part of these consolidated financial statements.
Trade and other receivables, net of current expected credit losses
761
727
Inventory
482
501
Current derivative assets
147
155
Margin deposits
150
128
Other current assets, net
147
100
Total current assets
3,704
4,801
Property, plant and equipment, net of accumulated depreciation
34,829
33,552
Operating lease assets
2,776
2,684
Derivative assets
2,236
1,903
Deferred tax assets
18
19
Other non-current assets, net
1,015
899
Total assets
$
44,578
$
43,858
LIABILITIES, REDEEMABLE NON-CONTROLLING INTEREST AND STOCKHOLDERS’ EQUITY
Current liabilities
Accounts payable
$
161
$
171
Accrued liabilities
1,492
2,179
Current debt, net of unamortized discount and debt issuance costs
609
351
Deferred revenue
145
163
Current operating lease liabilities
562
592
Current derivative liabilities
706
902
Other current liabilities
100
83
Total current liabilities
3,775
4,441
Long-term debt, net of unamortized discount and debt issuance costs
22,012
22,554
Operating lease liabilities
2,216
2,090
Derivative liabilities
1,621
1,865
Deferred tax liabilities
2,307
1,856
Other non-current liabilities
1,338
992
Total liabilities
33,269
33,798
Redeemable non-controlling interest
58
7
Stockholders’ equity
Preferred stock: $0.0001 par value, 5.0 million shares authorized, none issued
—
—
Common stock: $0.003 par value, 480.0 million shares authorized;279.2 millionshares and 278.7 million shares issued at June 30, 2025 and December 31, 2024, respectively
1
1
Treasury stock: 57.7 million shares and 54.7 million shares at June 30, 2025 and December 31, 2024, respectively, at cost
(6,798)
(6,136)
Additional paid-in-capital
4,483
4,452
Retained earnings
9,021
7,382
Total Cheniere stockholders’ equity
6,707
5,699
Non-controlling interests
4,544
4,354
Total stockholders’ equity
11,251
10,053
Total liabilities, redeemable non-controlling interest and stockholders’ equity
$
44,578
$
43,858
(1)Amounts presented include balances held by our consolidated variable interest entities (“VIEs”), substantially all of which are related to CQP, as further discussed in Note 6—Non-Controlling Interests and Variable Interest Entities. As of June 30, 2025, total assets and liabilities of our VIEs were $16.7 billion and $17.2 billion, respectively, including $108 million of cash and cash equivalents and $40 million of restricted cash and cash equivalents.
The accompanying notes are an integral part of these consolidated financial statements.
CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY AND REDEEMABLE NON-CONTROLLING INTEREST
(in millions)
(unaudited)
Three and Six Months Ended June 30, 2025
Total Stockholders’ Equity
Common Stock
Treasury Stock
Additional Paid-in Capital
Retained Earnings
Non-controlling Interests
Total Equity
Redeemable Non-Controlling Interest (1)
Shares
Par Value Amount
Shares
Amount
Balance at December 31, 2024
224.0
$
1
54.7
$
(6,136)
$
4,452
$
7,382
$
4,354
$
10,053
$
7
Net income (loss)
—
—
—
—
—
353
317
670
(2)
Dividends declared ($0.500 per common share) and dividend equivalents accrued
—
—
—
—
—
(113)
—
(113)
—
Shares repurchased, at cost and inclusive of excise taxes
(1.6)
—
1.6
(352)
—
—
—
(352)
—
Accretion of redeemable non-controlling interest (2)
—
—
—
—
—
(2)
—
(2)
2
Distributions to non-controlling interests
—
—
—
—
—
—
(200)
(200)
—
Contributions from redeemable non-controlling interest
—
—
—
—
—
—
—
—
38
Vesting of share-based compensation awards
0.4
—
—
—
—
—
—
—
—
Share-based compensation
—
—
—
—
40
—
—
40
—
Issued shares withheld from employees related to share-based compensation, at cost
—
—
—
—
(44)
—
—
(44)
—
Balance at March 31, 2025
222.8
1
56.3
(6,488)
4,448
7,620
4,471
10,052
45
Net income (loss)
—
—
—
—
—
1,626
273
1,899
(2)
Dividends declared ($0.500 per common share declared each on April 29, 2025 and on June 17, 2025) and dividend equivalents accrued
—
—
—
—
—
(222)
—
(222)
—
Shares repurchased, at cost and inclusive of excise taxes
(1.4)
—
1.4
(310)
—
—
—
(310)
—
Accretion of redeemable non-controlling interest (2)
—
—
—
—
—
(3)
—
(3)
4
Distributions to non-controlling interests
—
—
—
—
—
—
(200)
(200)
—
Contributions from redeemable non-controlling interest
—
—
—
—
—
—
—
—
11
Vesting of share-based compensation awards
0.1
—
—
—
—
—
—
—
—
Share-based compensation
—
—
—
—
37
—
—
37
—
Issued shares withheld from employees related to share-based compensation, at cost
—
—
—
—
(2)
—
—
(2)
—
Balance at June 30, 2025
221.5
$
1
57.7
$
(6,798)
$
4,483
$
9,021
$
4,544
$
11,251
$
58
(1)Redeemable non-controlling interest represents the economic interest held by a third party in one of our consolidated VIEs that is redeemable for cash under certain circumstances, including those that are outside of our control. As such, the economic interest is not a component of permanent equity on our Consolidated Balance Sheets.
(2)Amount in retained earnings presented net of tax.
The accompanying notes are an integral part of these consolidated financial statements.
Dividends declared ($0.435 per common share) and dividend equivalents accrued
—
—
—
—
—
(103)
—
(103)
—
Shares repurchased, at cost and inclusive of excise taxes
(7.5)
—
7.5
(1,203)
—
—
—
(1,203)
—
Distributions to non-controlling interests
—
—
—
—
—
—
(253)
(253)
—
Contributions from redeemable non-controlling interest
—
—
—
—
—
—
—
—
4
Vesting of share-based compensation awards
0.6
—
—
—
—
—
—
—
—
Share-based compensation
—
—
—
—
34
—
—
34
—
Issued shares withheld from employees related to share-based compensation, at cost
—
—
—
—
(40)
—
—
(40)
—
Balance at March 31, 2024
230.1
1
48.4
(5,067)
4,371
4,945
4,044
8,294
4
Net income
—
—
—
—
—
880
282
1,162
—
Dividends declared ($0.435 per common share declared each on April 26, 2024 and on June 17, 2024) and dividend equivalents accrued
—
—
—
—
—
(200)
—
(200)
—
Shares repurchased, at cost and inclusive of excise taxes
(3.1)
—
3.1
(501)
—
—
—
(501)
—
Distributions to non-controlling interests
—
—
—
—
—
—
(198)
(198)
—
Contributions from redeemable non-controlling interest
—
—
—
—
—
—
—
—
2
Share-based compensation
—
—
—
—
36
—
—
36
—
Issued shares withheld from employees related to share-based compensation, at cost
—
—
—
—
(1)
—
—
(1)
—
Balance at June 30, 2024
227.0
$
1
51.5
$
(5,568)
$
4,406
$
5,625
$
4,128
$
8,592
$
6
(1)Redeemable non-controlling interest represents the economic interest held by a third party in one of our consolidated VIEs that is redeemable for cash under certain circumstances, including those that are outside of our control. As such, the economic interest is not a component of permanent equity on our Consolidated Balance Sheets.
The accompanying notes are an integral part of these consolidated financial statements.
NOTE 1—NATURE OF OPERATIONS AND BASIS OF PRESENTATION
We operate natural gas liquefaction and export facilities located in Cameron Parish, Louisiana at Sabine Pass and near Corpus Christi, Texas (respectively, the “Sabine Pass LNG Terminal” and “Corpus Christi LNG Terminal”), with total expected production capacity of over 60 mtpa of LNG, including approximately 14 mtpa under construction as of June 30, 2025, inclusive of estimated debottlenecking opportunities.
CQP owns the Sabine Pass LNG Terminal, which has natural gas liquefaction facilities with a total production capacity of over 30 mtpa of LNG (the “SPL Project”) as of June 30, 2025. The Sabine Pass LNG Terminal also has five LNG storage tanks, vaporizers and three marine berths. CQP also owns and operates a 94-mile natural gas supply pipeline that interconnects the Sabine Pass LNG Terminal with several large interstate and intrastate pipelines (the “Creole Trail Pipeline”). As of June 30, 2025, we owned 100% of the general partner interest, a 48.6% limited partner interest and 100% of the incentive distribution rights of CQP.
The Corpus Christi LNG Terminal has natural gas liquefaction facilities with total expected production capacity of over 30 mtpa of LNG, including approximately 14 mtpa under construction as of June 30, 2025, inclusive of estimated debottlenecking opportunities. The Corpus Christi LNG Terminal also has three LNG storage tanks and two marine berths. We also own an approximately 21-mile natural gas supply pipeline that interconnects the Corpus Christi LNG Terminal with several large interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline”).
As noted above, we are constructing an expansion of the Corpus Christi LNG Terminal that is expected to add over 10 mtpa of operational liquefaction capacity across seven midscale Trains once fully completed (the “Corpus Christi Stage 3 Project”), inclusive of the first midscale Train that reached substantial completion in March 2025. Subsequently, in August 2025, the second midscale Train of the Corpus Christi Stage 3 Project reached substantial completion. In addition to the Corpus Christi Stage 3 Project, on June 17, 2025, our board of directors (the “Board”) made a positive FID with respect to two additional midscale Trains with an expected total production capacity of approximately 5 mtpa of LNG, inclusive of estimated debottlenecking opportunities (the “Midscale Trains 8 & 9 Project” and together with the existing assets at the Corpus Christi LNG Terminal, the Corpus Christi Stage 3 Project and the Corpus Christi Pipeline, the “CCL Project”), and issued a full notice to proceed with construction to Bechtel Energy Inc. effective June 18, 2025.
In addition to the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project, we are developing expansion projects to provide additional liquefaction capacity at both the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”), and have started commercializing to support the additional liquefaction capacity associated with these potential expansion projects. The development of these projects or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make a positive FID.
Basis of Presentation
The accompanying unaudited Consolidated Financial Statements of Cheniere have been prepared in accordance with GAAP for interim financial information and in accordance with Rule 10-01 of Regulation S-X and reflect all normal recurring adjustments which are, in the opinion of management, necessary for a fair statement of the financial results for the interim periods presented. Accordingly, these Consolidated Financial Statements do not include all of the information and footnotes required by GAAP for complete financial statements and should be read in conjunction with the Consolidated Financial Statements and accompanying notes included in our annual report on Form 10-K for the fiscal year ended December 31, 2024.
Results of operations for the three and six months ended June 30, 2025 are not necessarily indicative of the results of operations that will be realized for the year ending December 31, 2025.
Recent Accounting Standards
ASU 2023-09
In December 2023, the FASB issued ASU No. 2023-09, Income Taxes (Topic 740). This guidance further enhances income tax disclosures, primarily through standardization and disaggregation of rate reconciliation categories and income taxes
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
paid by jurisdiction. The adoption of this guidance will not have an impact on our results of operations and financial condition but will have an impact on the annual disclosures required in the relevant notes to the consolidated financial statements. This guidance applies prospectively, with retrospective application permitted. We are progressing on the implementation and evaluating the method of adoption. We will adopt this guidance and conform with the disclosure requirements when it becomes mandatorily effective for our annual report for the year ending December 31, 2025.
ASU 2024-03
In November 2024, the FASB issued ASU No. 2024-03, Income Statement – Reporting Comprehensive Income – Expense Disaggregation Disclosures (Subtopic 220-40): Disaggregation of Income Statement Expenses, as clarified by ASU No. 2025-01 in January 2025. This guidance requires disaggregated disclosures about certain income statement expense line items on an annual and interim basis. We continue to evaluate the impact of the provisions of this guidance on our disclosures, but plan to adopt this guidance prospectively and conform with the disclosure requirements when it becomes mandatorily effective for our annual report for the year ending December 31, 2027.
NOTE 2—TRADE AND OTHER RECEIVABLES, NET OF CURRENT EXPECTED CREDIT LOSSES
Trade and other receivables, net of current expected credit losses, consisted of the following (in millions):
June 30,
December 31,
2025
2024
Trade receivables
SPL and CCL
$
418
$
548
Cheniere Marketing
280
109
Other subsidiaries
8
4
Other receivables
55
66
Total trade and other receivables, net of current expected credit losses
$
761
$
727
NOTE 3—INVENTORY
Inventory consisted of the following (in millions):
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 4—PROPERTY, PLANT AND EQUIPMENT, NET OF ACCUMULATED DEPRECIATION
Property, plant and equipment, net of accumulated depreciation consisted of the following (in millions):
June 30,
December 31,
2025
2024
Terminal and related assets
Terminal and interconnecting pipeline facilities
$
35,566
$
34,282
Land
572
465
Construction-in-process
5,523
5,486
Accumulated depreciation
(7,815)
(7,231)
Total terminal and related assets, net of accumulated depreciation
33,846
33,002
Fixed assets and other
Computer and office equipment
38
36
Furniture and fixtures
33
31
Computer software
123
122
Leasehold improvements
47
47
Other
24
24
Accumulated depreciation
(195)
(188)
Total fixed assets and other, net of accumulated depreciation
70
72
Assets under finance leases
Marine assets
1,060
587
Accumulated depreciation
(147)
(109)
Total assets under finance leases, net of accumulated depreciation
913
478
Property, plant and equipment, net of accumulated depreciation
$
34,829
$
33,552
The following table shows depreciation expense and offsets to LNG terminal costs (in millions):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Depreciation expense
$
327
$
303
$
636
$
603
Offsets to LNG terminal costs (1)
7
—
55
—
(1)We recognize offsets to LNG terminal costs related to the sale of commissioning volumes because these amounts were earned or loaded prior to the start of commercial operations of the respective Trains of the Liquefaction Projects during the testing phase for its construction.
NOTE 5—DERIVATIVE INSTRUMENTS
We have the following derivative instruments:
•commodity derivatives consisting of the following (collectively, “Commodity Derivatives”):
◦natural gas and power supply contracts, including our IPM agreements, for the development, commissioning and operation of the Liquefaction Projects and expansion projects, as well as the associated economic hedges (collectively, the “Liquefaction Supply Derivatives”); and,
◦LNG derivatives in which we have contractual net settlement and economic hedges on the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (collectively, “LNG Trading Derivatives”); and
•Foreign currency exchange (“FX”) contracts to hedge exposure to currency risk associated with cash flows denominated in currencies other than U.S. dollar (“FX Derivatives”), associated with both LNG Trading Derivatives and operations in countries outside of the United States.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table shows the fair value of our derivative instruments that are required to be measured at fair value on a recurring basis, distinguished by the fair value hierarchy levels prescribed by GAAP (in millions):
Fair Value Measurements as of
June 30, 2025
December 31, 2024
Quoted Prices in Active Markets (Level 1)
Significant Other Observable Inputs (Level 2)
Significant Unobservable Inputs (Level 3)
Total
Quoted Prices in Active Markets (Level 1)
Significant Other Observable Inputs (Level 2)
Significant Unobservable Inputs (Level 3)
Total
Liquefaction Supply Derivatives asset (liability)
$
—
$
8
$
(10)
$
(2)
$
—
$
59
$
(801)
$
(742)
LNG Trading Derivatives asset
—
91
—
91
—
17
—
17
FX Derivatives asset (liability)
—
(33)
—
(33)
—
16
—
16
We value the Liquefaction Supply Derivatives and LNG Trading Derivatives using a market or option-based approach incorporating present value techniques, as needed, which incorporates observable commodity price curves, when available, and other relevant data. We value our FX Derivatives with a market approach using observable FX rates and other relevant data.
We include a significant portion of the Liquefaction Supply Derivatives as Level 3 within the valuation hierarchy as the fair value is developed through the use of internal models which incorporate significant unobservable inputs. In instances where observable data is unavailable, consideration is given to the assumptions that market participants may use in valuing the asset or liability. To the extent valued using an option pricing model, we consider the future prices of energy units for unobservable periods to be a significant unobservable input to estimated net fair value. In estimating the future prices of energy units, we make judgments about market risk related to liquidity of commodity indices and volatility utilizing available market data. Changes in facts and circumstances or additional information may result in revised estimates and judgments, and actual results may differ from these estimates and judgments. We derive our volatility assumptions based on observed historical settled global LNG market pricing or accepted proxies for global LNG market pricing as well as settled domestic natural gas pricing. Such volatility assumptions also contemplate, as of the balance sheet date, observable forward curve data of such indices, as well as evolving available industry data and independent studies.
In developing our volatility assumptions, we acknowledge that the global LNG industry is inherently influenced by events such as unplanned supply constraints, geopolitical incidents, unusual climate events including drought and uncommonly mild, by historical standards, winters and summers, and real or threatened disruptive operational impacts to global energy infrastructure. Our current estimate of volatility includes the impact of otherwise rare events unless we believe market participants would exclude such events on account of their assertion that those events were specific to our company and deemed within our control. As applicable to our natural gas supply contracts, our fair value estimates incorporate market participant-based assumptions pertaining to certain contractual uncertainties, including those related to the availability of market information for delivery points, as well as the timing of satisfaction of certain events or development of infrastructure to support natural gas gathering and transport. We may recognize changes in fair value through earnings that could significantly impact our results of operations if and when such uncertainties are resolved.
The Level 3 fair value measurements of our natural gas positions within the Liquefaction Supply Derivatives could be materially impacted by a significant change in certain natural gas and international LNG prices. The following table includes quantitative information for the unobservable inputs for the Level 3 Liquefaction Supply Derivatives as of June 30, 2025:
Net Fair Value Liability
(in millions)
Valuation Approach
Significant Unobservable Input
Range of Significant Unobservable Inputs / Weighted Average (1)
Liquefaction Supply Derivatives
$(10)
Market approach incorporating present value techniques
Henry Hub basis spread
$(2.330) - $0.228 / $(0.073)
Option pricing model
International LNG pricing spread, relative to Henry Hub (2)
68% - 361% / 170%
(1)Unobservable inputs were weighted by the relative fair value of the instruments.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
(2)Spread contemplates U.S. dollar-denominated pricing.
Increases or decreases in basis or pricing spreads, in isolation, would decrease or increase, respectively, the fair value of the Liquefaction Supply Derivatives.
The following table shows the changes in the fair value of the Level 3 Liquefaction Supply Derivatives (in millions):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Balance, beginning of period
$
(1,415)
$
(2,457)
$
(801)
$
(2,178)
Realized and change in fair value gains included in net income (1):
Included in cost of sales, existing deals (2)
1,204
617
389
164
Included in cost of sales, new deals (3)
7
7
4
5
Purchases and settlements:
Purchases (4)
—
—
—
—
Settlements (5)
194
104
400
280
Transfers out of level 3 (6)
—
—
(2)
—
Balance, end of period
$
(10)
$
(1,729)
$
(10)
$
(1,729)
Favorable changes in fair value relating to instruments still held at the end of the period
$
1,211
$
624
$
393
$
169
(1)Does not include the realized value associated with derivative instruments that settle through physical delivery, as settlement is equal to the contractually fixed price from trade date multiplied by contractual volume. See settlements line item in this table.
(2)Impact to earnings on deals that existed at the beginning of the period and continue to exist at the end of the period.
(3)Impact to earnings on deals that were entered into during the reporting period and continue to exist at the end of the period.
(4)Includes any day one gain (loss) recognized during the reporting period on deals that were entered into during the reporting period which continue to exist at the end of the period.
(5)Roll-off in the current period of amounts recognized in our Consolidated Balance Sheets at the end of the previous period due to settlement of the underlying instruments in the current period.
(6)Transferred out of Level 3 as a result of observable market for the underlying natural gas purchase agreements.
Commodity Derivatives
We hold Liquefaction Supply Derivatives, which are indexed to Henry Hub, global LNG or other natural gas price indices. As of June 30, 2025, the remaining fixed terms of the Liquefaction Supply Derivatives ranged up to approximately 15 years, some of which commence or accelerate upon the satisfaction of certain events or development of infrastructure to support natural gas gathering and transport.
Cheniere Marketing has historically entered into, and may from time to time enter into, LNG transactions that provide for contractual net settlement. Such transactions are accounted for as LNG Trading Derivatives along with financial commodity contracts in the form of swaps or futures. The terms of LNG Trading Derivatives range up to approximately one year.
The following table shows the notional amounts of our Commodity Derivatives:
June 30, 2025
December 31, 2024
Liquefaction Supply Derivatives (1)
LNG Trading Derivatives
Liquefaction Supply Derivatives (1)
LNG Trading Derivatives
Notional amount, net (in TBtu)
12,922
—
12,503
(8)
(1)Inclusive of amounts under contracts with unsatisfied contractual conditions and exclusive of extension options that were uncertain to be taken as of both June 30, 2025 and December 31, 2024.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table shows the effect and location of our Commodity Derivatives recorded on our Consolidated Statements of Operations (in millions):
Gain (Loss) Recognized in Consolidated Statements of Operations
Consolidated Statements of Operations Location (1)
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
LNG Trading Derivatives
LNG revenues
$
150
$
1
$
277
$
17
LNG Trading Derivatives
Cost of sales
(42)
(1)
3
(20)
Liquefaction Supply Derivatives (2)
LNG revenues
1
2
2
2
Liquefaction Supply Derivatives (2)
Cost of sales
1,438
647
737
379
(1)Fair value fluctuations associated with activities of our Commodity Derivatives are classified and presented consistently with the item economically hedged and the nature and intent of the derivative instrument.
(2)Does not include the realized value associated with the Liquefaction Supply Derivatives that settle through physical delivery.
FX Derivatives
Cheniere Marketing holds FX Derivatives to protect against the volatility in future cash flows attributable to changes in international currency exchange rates. The FX Derivatives are executed primarily to economically hedge the foreign currency exposure arising from cash flows expended for both physical and financial LNG transactions that are denominated in a currency other than the U.S. dollar. The terms of FX Derivatives range up to approximately one year.
The total notional amount of our FX Derivatives was $966 million and $642 million as of June 30, 2025 and December 31, 2024, respectively.
The following table shows the effect and location of our FX Derivatives recorded on our Consolidated Statements of Operations (in millions):
Gain (Loss) Recognized in Consolidated Statements of Operations
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Consolidated Balance Sheets Presentation
The following table reconciles the fair value of our derivative assets and liabilities on a gross basis, by contract, to net amounts as presented on our Consolidated Balance Sheets after offsetting for any balances with the same counterparty under master netting arrangements or other relevant netting criteria under GAAP (in millions):
Liquefaction Supply Derivatives
LNG Trading Derivatives
FX Derivatives
As of June 30, 2025
Gross assets
$
3,553
$
115
$
—
Offsetting amounts
(1,280)
(5)
—
Net assets (1)
$
2,273
$
110
$
—
Gross liabilities
$
(2,334)
$
(36)
$
(41)
Offsetting amounts
59
17
8
Net liabilities (2)
$
(2,275)
$
(19)
$
(33)
As of December 31, 2024
Gross assets
$
3,064
$
42
$
25
Offsetting amounts
(1,056)
(10)
(7)
Net assets (1)
$
2,008
$
32
$
18
Gross liabilities
$
(2,790)
$
(16)
$
(3)
Offsetting amounts
40
1
1
Net liabilities (2)
$
(2,750)
$
(15)
$
(2)
(1)Includes current and non-current derivative assets of $147 million and $2,236 million, respectively, as of June 30, 2025 and $155 million and $1,903 million, respectively, as of December 31, 2024.
(2)Includes current and non-current derivative liabilities of $706 million and $1,621 million, respectively, as of June 30, 2025 and $902 million and $1,865 million, respectively, as of December 31, 2024.
The table below shows the collateral balances that are recorded within margin deposits and other current liabilities that are not netted on our Consolidated Balance Sheets (in millions):
Consolidated Balance Sheets Location
June 30,
December 31,
2025
2024
Liquefaction Supply Derivatives
Margin deposits
$
35
$
18
LNG Trading Derivatives
Margin deposits
115
110
LNG Trading Derivatives
Other current liabilities
12
—
NOTE 6—NON-CONTROLLING INTERESTS AND VARIABLE INTEREST ENTITIES
Substantially all of our consolidated VIEs’ assets and liabilities relate to CQP. We own a 48.6% limited partner interest in CQP, and we also own all of the 2% general partner interest and 100% of the incentive distribution rights in CQP. The remaining 49.4% non-controlling limited partner interest in CQP is held by affiliates of Blackstone Inc. and Brookfield Asset Management, Inc. (“Brookfield”) as well as the public.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following table presents the summarized consolidated assets and liabilities (in millions) of our consolidated VIEs, which are included in our Consolidated Balance Sheets. The assets in the table below may only be used to settle obligations of the respective VIEs. In addition, there is no recourse to us for the consolidated VIEs’ liabilities. The assets and liabilities in the table below exclude intercompany balances between the respective VIEs and Cheniere that eliminate in our Consolidated Financial Statements.
June 30,
December 31,
2025
2024
ASSETS
Current assets
Cash and cash equivalents
$
108
$
270
Restricted cash and cash equivalents
40
125
Trade and other receivables, net of current expected credit losses
262
381
Inventory
158
154
Current derivative assets
28
84
Margin deposits
19
13
Other current assets, net
74
54
Total current assets
689
1,081
Property, plant and equipment, net of accumulated depreciation
15,665
15,880
Operating lease assets
80
80
Derivative assets
103
98
Other non-current assets, net
208
206
Total assets
$
16,745
$
17,345
LIABILITIES
Current liabilities
Accounts payable
$
74
$
70
Accrued liabilities
676
881
Current debt, net of unamortized discount and debt issuance costs
609
351
Deferred revenue
110
120
Current operating lease liabilities
5
4
Current derivative liabilities
143
250
Other current liabilities
7
16
Total current liabilities
1,624
1,692
Long-term debt, net of unamortized discount and debt issuance costs
14,213
14,761
Operating lease liabilities
75
76
Derivative liabilities
1,136
1,213
Other non-current liabilities
167
176
Total liabilities
$
17,215
$
17,918
NOTE 7—ACCRUED LIABILITIES
Accrued liabilities consisted of the following (in millions):
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 8—DEBT
Debt consisted of the following (in millions):
June 30,
December 31,
2025
2024
SPL:
Senior Secured Notes:
5.625% due 2025
$
—
$
300
5.875% due 2026 (the “2026 SPL Senior Notes”) (1)
1,500
1,500
5.00% due 2027
1,500
1,500
4.200% due 2028
1,350
1,350
4.500% due 2030
2,000
2,000
4.746% weighted average rate due 2037 (2)
1,782
1,782
Total SPL Senior Secured Notes
8,132
8,432
Revolving credit and guaranty agreement (the “SPL Revolving Credit Facility”)
—
—
Total debt - SPL
8,132
8,432
CQP:
Senior Notes:
4.500% due 2029
1,500
1,500
4.000% due 2031
1,500
1,500
3.25% due 2032
1,200
1,200
5.950% due 2033
1,400
1,400
5.750% due 2034
1,200
1,200
Total CQP Senior Notes
6,800
6,800
Revolving credit and guaranty agreement (the “CQP Revolving Credit Facility”)
—
—
Total debt - CQP
6,800
6,800
CCH:
Senior Secured Notes:
5.125% due 2027
1,201
1,201
3.700% due 2029
1,125
1,125
3.788% weighted average rate due 2039 (2)
2,539
2,539
Total CCH Senior Secured Notes
4,865
4,865
Term loan facility agreement (the “CCH Credit Facility”)
—
—
Working capital facility agreement (the “CCH Working Capital Facility”)
—
—
Total debt - CCH
4,865
4,865
Cheniere:
4.625% Senior Notes due 2028
1,500
1,500
5.650% Senior Notes due 2034
1,500
1,500
Total Cheniere Senior Notes
3,000
3,000
Revolving credit agreement (the “Cheniere Revolving Credit Facility”) (3)
—
—
Total debt - Cheniere
3,000
3,000
Total debt
22,797
23,097
Current debt, net of unamortized discount and debt issuance costs (1) (2)
(609)
(351)
Unamortized discount and debt issuance costs
(176)
(192)
Total long-term debt, net of unamortized discount and debt issuance costs
$
22,012
$
22,554
(1)In July 2025, CQP issued and sold $1.0 billion aggregate principal amount of 5.550% Senior Notes due 2035, and the net proceeds, together with cash on hand, were used to redeem $1.0 billion of the aggregate principal amount of the2026 SPL Senior Notes. As a portion of the 2026 SPL Senior Notes that were contractually due within one year was refinanced with a long-term debt instrument before the issuance of these Consolidated Financial Statements, the amount redeemed was classified as long-term debt as of June 30, 2025.
(2)Includes notes that amortize based on a fixed amortization schedule as set forth in their respective indentures.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
(3)In August 2025, we entered into an amendment and restatement of the Cheniere Revolving Credit Facility. See below for additional details.
Credit Facilities
Below is a summary of our committed credit facilities outstanding as of June 30, 2025 (in millions):
SPL Revolving Credit Facility
CQP Revolving Credit Facility
CCH Credit Facility
CCH Working Capital Facility
Cheniere Revolving Credit Facility (1)
Total facility size
$
1,000
$
1,000
$
3,260
$
1,500
$
1,250
Less:
Outstanding balance
—
—
—
—
—
Letters of credit issued
215
—
—
110
—
Available commitment
$
785
$
1,000
$
3,260
$
1,390
$
1,250
Priority ranking
Senior secured
Senior unsecured
Senior secured
Senior secured
Senior unsecured
Interest rate on available balance (2)
SOFR plus credit spread adjustment of 0.1%, plus margin of 1.0% - 1.75% or base rate plus 0.0% - 0.75%
SOFR plus credit spread adjustment of 0.1%, plus margin of 1.125% - 2.0% or base rate plus 0.125% - 1.0%
SOFR plus credit spread adjustment of 0.1%, plus margin of 1.5% or base rate plus 0.5%
SOFR plus credit spread adjustment of 0.1%, plus margin of 1.0% - 1.5% or base rate plus 0.0% - 0.5%
SOFR plus credit spread adjustment of 0.1%, plus margin of 1.075% - 2.20% or base rate plus 0.075% - 1.2%
Commitment fees on undrawn balance (2)
0.075% - 0.30%
0.10% - 0.30%
0.525%
0.10% - 0.20%
0.115% - 0.365%
Letter of credit fees (2)
1.0% - 1.75%
1.125% - 2.0%
N/A
1.0% - 1.5%
1.075% - 2.20%
Maturity date
June 23, 2028
June 23, 2028
(3)
June 15, 2027
October 28, 2026
(1)In August 2025, we entered into an amendment and restatement of the Cheniere Revolving Credit Facility. See below for additional details.
(2)The margin on the interest rate, the commitment fees and the letter of credit fees is subject to change based on the applicable entity’s credit rating.
(3)The CCH Credit Facility matures the earlier of June 15, 2029 or two years after the substantial completion of the last Train of the Corpus Christi Stage 3 Project.
Cheniere A&R Revolving Credit Facility
On August 1, 2025, we entered into a $1.25 billion Third Amended and Restated Revolving Credit Agreement among us, as borrower, various lenders (the “Lenders”) and issuing banks, MUFG Bank, Ltd., as the coordinating lead arranger, the joint lead arrangers party thereto, Sumitomo Mitsui Banking Corporation, as sustainability advisor, and Société Générale, as administrative agent for the Lenders (the “Cheniere A&R Revolving Credit Facility”). The Cheniere A&R Revolving Credit Facility amends and restates the existing Cheniere Revolving Credit Facility dated as of October 28, 2021 and amended on June 15, 2023, to, among other things, (i) extend the maturity date thereunder to August 1, 2030, (ii) reduce the rate of interest and commitment fees applicable thereunder, and (iii) make certain other changes to the terms and conditions of the existing Cheniere Revolving Credit Facility. Commitments under the Cheniere A&R Revolving Credit Facility are available for loans or the issuances of letters of credit (subject to issuing bank capacity), in each case, for general corporate purposes.
Loans under the Cheniere A&R Revolving Credit Facility will bear interest at a variable rate per annum equal to Term SOFR or the base rate specified therein, plus an applicable margin. The applicable margin for Term SOFR loans ranges from 1.125% to 2.00% per annum, and the applicable margin for base rate loans ranges from 0.125% to 1.00% per annum, in each case, based on the credit ratings then in effect assigned to loans under the Cheniere A&R Revolving Credit Facility. Based on our current credit ratings, the applicable margins for Term SOFR loans and base rate loans are 1.25% and 0.25%, respectively. Interest on Term SOFR loans is due and payable at the end of each Term SOFR period, and interest on base rate loans is due and payable at the end of each calendar quarter. We will pay a commitment fee on the average daily amount of undrawn commitments at an annual rate that ranges from 0.10% to 0.30% based on the credit ratings then in effect assigned to loans under the Cheniere A&R Revolving Credit Facility. Based on our current credit ratings, the commitment fee on undrawn commitments is 0.15%. The interest rate and the commitment fees may be reduced by five basis points on the interest rate and by one basis point on the commitment fee based on the achievement of certain methane emissions management standards.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The Cheniere A&R Revolving Credit Facility contains customary representations and warranties, events of default and affirmative and negative covenants, including restrictions on our ability to incur liens and to undergo certain fundamental changes. As of the date of this Quarterly Report on Form 10-Q, no amounts were drawn under the Cheniere A&R Revolving Credit Facility.
Restrictive Debt Covenants
The agreements governing our and our subsidiaries’ indebtedness contain customary terms and events of default and certain covenants that, among other things, may limit our and our subsidiaries’ ability to make certain investments or pay dividends or distributions. For example, SPL and CCH are restricted from making distributions under agreements governing their respective indebtedness generally until, among other requirements, appropriate reserves have been established for debt service using cash or letters of credit and a historical and projected debt service coverage ratio of at least 1.25:1.00 is satisfied.
As of June 30, 2025, we were, and each of our subsidiaries was, in compliance with all covenants related to our respective debt agreements.
Interest Expense
Total interest expense, net of capitalized interest, consisted of the following (in millions):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Total interest cost
$
298
$
309
$
593
$
620
Capitalized interest
(61)
(52)
(127)
(97)
Total interest expense, net of capitalized interest
$
237
$
257
$
466
$
523
Fair Value Disclosures
The following table shows the carrying amount and estimated fair value of our senior notes (in millions):
June 30, 2025
December 31, 2024
Carrying Amount
Estimated Fair Value (1)
Carrying Amount
Estimated Fair Value (1)
Senior notes
$
22,797
$
22,355
$
23,097
$
22,220
(1)As ofJune 30, 2025 and December 31, 2024, $3.1 billion and $3.0 billion, respectively, of the fair value of our senior notes were classified as Level 3 since these senior notes were valued by applying an unobservable illiquidity adjustment to the price derived from trades or indicative bids of instruments with similar terms, maturities and credit standing. The remainder of the fair value of our senior notes was classified as Level 2, based on prices derived from trades or indicative bids of the instruments.
The estimated fair value of our credit facilities approximates the principal amount outstanding because the interest rates are indexed to market rates and the debt may be repaid, in full or in part, at any time without penalty.
NOTE 9—LEASES
We are the lessee of LNG vessels leased under time charters (“vessel charters”) as well as tug vessels, office space and facilities, land sites and equipment.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
Future annual minimum lease payments for operating and finance leases as of June 30, 2025 are as follows (in millions):
Years Ending December 31,
Operating Leases
Finance Leases
2025
$
372
$
72
2026
638
141
2027
544
143
2028
375
146
2029
287
146
Thereafter
1,168
646
Total lease payments (1)
3,384
1,294
Less: Interest
(606)
(322)
Present value of lease liabilities
$
2,778
$
972
(1)Does not include approximately $2.1 billion of legally binding minimum payments for leases executed as of June 30, 2025 that will commence in future periods, consisting primarily of vessel charters, with fixed minimum lease terms of up to 15 years.
The following table shows the weighted-average remaining lease term and the weighted-average discount rate for our operating leases and finance leases:
June 30, 2025
December 31, 2024
Operating Leases
Finance Leases
Operating Leases
Finance Leases
Weighted-average remaining lease term (in years)
7.3
9.0
7.0
8.8
Weighted-average discount rate (1)
5.1%
6.6%
5.0%
7.4%
(1)The weighted average discount rate is impacted by certain finance leases that commenced prior to the adoption of the current leasing standard under GAAP. In accordance with previous accounting guidance, the implied rate is based on the fair value of the underlying assets.
The following table includes other quantitative information for our operating and finance leases (in millions):
Six Months Ended June 30,
2025
2024
Right-of-use assets obtained in exchange for operating lease liabilities (1)
$
402
$
568
Right-of-use assets obtained in exchange for finance lease liabilities (2)
472
74
(1)Net of $33 million reclassified from operating leases to finance leases during the six months ended June 30, 2024, as a result of modifications of the underlying tug vessel leases.
(2)Net of $15 million reclassified from finance leases to operating leases during the six months ended June 30, 2024, as a result of modifications of the underlying tug vessel leases.
LNG Vessel Subleases
We sublease certain LNG vessels under charter to third parties while retaining our existing obligation to the original lessor. All of our sublease arrangements have been assessed as operating leases. The following table shows the sublease income recognized in other revenues on our Consolidated Statements of Operations (in millions):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Fixed income
$
18
$
67
$
41
$
165
Variable income
10
12
22
18
Total sublease income
$
28
$
79
$
63
$
183
As of June 30, 2025, the aggregate future annual minimum sublease payment to be received from LNG vessel subleases was $10 million and is expected to be received during the current fiscal year.
(1)Includes revenues from LNG vessel subcharters that do not qualify as leases for accounting purposes.
For the three and six months ended June 30, 2025 and 2024, we did not have any material revenue arrangements that were presented within our Consolidated Statements of Operations on a net basis.
Contract Assets and Liabilities
The following table shows our contract assets, net of current expected credit losses, which are included in other current assets, net and other non-current assets, net on our Consolidated Balance Sheets (in millions):
June 30,
December 31,
2025
2024
Contract assets, net of current expected credit losses
$
372
$
331
The following table reflects the changes in our contract liabilities, which are included in deferred revenue and other non-current liabilities on our Consolidated Balance Sheets (in millions):
Six Months Ended June 30, 2025
Deferred revenue, beginning of period
$
318
Cash received but not yet recognized in revenue
118
Revenue recognized from prior period deferral
(158)
Deferred revenue, end of period
$
278
Transaction Price Allocated to Future Performance Obligations
Because many of our sales contracts have long-term durations, we are contractually entitled to significant future consideration which we have not yet recognized as revenue. The following table discloses the aggregate amount of the transaction price that is allocated to performance obligations that have not yet been satisfied:
June 30, 2025
December 31, 2024
Unsatisfied Transaction Price (in billions)
Weighted Average Recognition Timing (years) (1)
Unsatisfied Transaction Price (in billions)
Weighted Average Recognition Timing (years) (1)
LNG revenues
$
105.8
8
$
104.7
8
Regasification revenues
0.5
2
0.5
3
Total revenues
$
106.3
$
105.2
(1)The weighted average recognition timing represents an estimate of the number of years during which we shall have recognized half of the unsatisfied transaction price.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
The following potential future sources of revenue are omitted from the table above under exemptions we have elected: (1) all performance obligations that are part of a contract that has an original expected duration of one year or less and (2) substantially all variable consideration under our SPAs and TUAs that is allocated entirely to a wholly unsatisfied performance obligation or to a wholly unsatisfied promise to transfer a distinct good or service that forms part of a single performance obligation when that performance obligation qualifies as a series. The amount of revenue from variable fees that is not included in the transaction price, and allocable to wholly unsatisfied future performance obligations or otherwise constrained, will vary based on (1) the future prices of the underlying variable index, primarily Henry Hub, throughout the contract terms, to the extent customers elect to take delivery of their LNG, (2) adjustments to the consumer price index and (3) the outcome of certain contingent events, including the achievement of milestones upon which delivery of LNG under certain contracts is conditioned.
The following table summarizes the percentage of variable consideration earned under contracts with customers included in the table above:
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
LNG revenues
66
%
50
%
69
%
56
%
Regasification revenues
8
%
8
%
8
%
8
%
NOTE 11—RELATED PARTY TRANSACTIONS
Below is a summary of our related party transactions, all in the ordinary course of business, as reported on our Consolidated Statements of Operations (in millions):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Other revenues
Operating agreement and construction management agreement with equity method investee (1)
$
—
$
2
$
1
$
4
Operating and maintenance expense
Natural gas transportation and storage agreements with equity method investees (1)
8
3
16
5
Natural gas transportation and storage agreements with other related party (2)
13
16
28
29
(1)On February 13, 2025, we sold all of our equity interests in one of our equity method investments to a third party. Additionally, we assigned certain operating and construction management agreements to the purchaser of such interests. Included in the table above are $1 million of other revenues and $1 million of operating and maintenance expense from the investee during the six months ended June 30, 2025 and $2 million and $4 million of other revenues and $3 million and $5 million of operating and maintenance expense from the investee during the three and six months ended June 30, 2024, respectively.
(2)These arrangements were with a party that was related to the entity that indirectly owns a portion of CQP’s limited partner interests. Due to the sale of such interests by that entity effective May 13, 2025, this party is no longer considered a related party as of that date.
Below is a summary of our related party balances, all in the ordinary course of business, as reported on our Consolidated Balance Sheets (in millions):
June 30,
December 31,
2025
2024
Trade and other receivables, net of current expected credit losses
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
NOTE 12—INCOME TAXES
We recorded an income tax provision of $426 million and $547 millionduring thethree and six months ended June 30, 2025, respectively, and an income tax provision of $210 million and $319 million for the same periods of 2024, respectively, which was calculated using the annual effective tax rate method.
Our effective tax rate was 18.3% and 17.6% during the three and six months ended June 30, 2025, respectively, as compared to 15.3% and 13.8% for the same periods of 2024, respectively. Our effective tax rate increased between the comparable periods primarily due to: (1) decreased ratio of pre-tax income attributable to CQP, which is partially not taxable to us, (2) increased tax expense due to a valuation allowance on a capital loss carryover generated on the sale of all of our equity interests in an equity method investment during the three months ended March 31, 2025 and (3) a reduced Foreign Derived Intangible Income (“FDII”) deduction. The effective tax rate for the comparable three and six month periods was lower than the statutory rate of 21.0% primarily due to CQP’s income that is partially not taxable to us.
On July 4, 2025, the One Big Beautiful Bill Act (“OBBBA”) was signed into law with significant changes to the Internal Revenue Code that are expected to impact us, including, among other provisions, 100% bonus depreciation on qualifying assets acquired after January 19, 2025 and changes to the FDII deduction rules, renamed to the Foreign Derived Deduction Eligible Income (“FDDEI”) under the OBBBA. The 100% bonus depreciation under the OBBBA is expected to reduce our income tax payable retroactively from the effective date, which will be adjusted in our Consolidated Financial Statements in the third quarter of 2025, the period of enactment. Under law in effect prior to the OBBBA, the effective rate on FDII was scheduled to increase as a result of a decrease in the FDII deduction to 21.875% for tax years beginning after December 31, 2025. Effective for tax years beginning after December 31, 2025, the OBBBA sets the FDDEI deduction at 33.34%, and also eliminates for purposes of FDDEI, the qualified business asset investment provisions and the requirement to apportion certain expenses to foreign derived income. We are continuing to evaluate the provisions of the OBBBA and the potential effects on our financial position, results of operations and cash flows.
NOTE 13—NET INCOME PER SHARE ATTRIBUTABLE TO COMMON STOCKHOLDERS
We utilize the two-class method for computing earnings per share, which requires an allocation of earnings as if all earnings were distributed during the period to the common stockholders and participating securities. The redeemable non-controlling interest held by a third party in one of our consolidated VIEs is considered participating because, under certain circumstances, it is redeemable for cash at a return. Therefore, the accretion of the redeemable non-controlling interest to its redemption value, net of tax, which is recognized as a deemed dividend within retained earnings, is deducted from net income in computing net income per share attributable to common stockholders.
The following table provides a reconciliation of net income attributable to common stockholders and basic and diluted weighted average common shares outstanding (in millions, except per share data):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Net income attributable to Cheniere
$
1,626
$
880
$
1,979
$
1,382
Less: accretion of redeemable non-controlling interest, net of tax
3
—
5
—
Net income attributable to common stockholders
$
1,623
$
880
$
1,974
$
1,382
Weighted average common shares outstanding:
Basic
221.8
228.4
222.6
231.3
Dilutive unvested stock
0.5
0.5
0.6
0.6
Diluted
222.3
228.9
223.2
231.9
Net income per share attributable to common stockholders—basic (1)
$
7.32
$
3.85
$
8.87
$
5.97
Net income per share attributable to common stockholders—diluted (1)
$
7.30
$
3.84
$
8.85
$
5.96
(1)Earnings per share in the table may not recalculate exactly due to rounding because it is calculated based on whole numbers, not the rounded numbers presented.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)
On June 17, 2025, we declared a quarterly dividend of $0.500 per share of common stock that is payable on August 18, 2025 to stockholders of record as of the close of business on August 8, 2025.
NOTE 14—SHARE REPURCHASE PROGRAMS
The following table presents information with respect to common stock repurchased under our share repurchase program (in millions, except per share data):
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
Total shares repurchased
1.41
3.14
3.01
10.66
Weighted average price paid per share
$
217.38
$
158.00
$
218.22
$
158.31
Total cost of repurchases (1)
$
306
$
496
$
656
$
1,688
(1)Amount excludes associated commission fees and excise taxes incurred, which are excluded costs under the repurchase program.
As of June 30, 2025, we had approximately $3.2 billion remaining under our share repurchase program. Our share repurchase program authorization is effective through December 31, 2027.
NOTE 15—SEGMENT INFORMATION AND CUSTOMER CONCENTRATION
We have determined that we operate as a single operating and reportable segment. The measure of profit and loss regularly provided to the chief operating decision maker (“CODM”) that is most consistent with GAAP is net income attributable to Cheniere, as presented in our Consolidated Statements of Operations. This measure contributes to the CODM’s assessment of performance and resource allocation, which includes monitoring of budget versus actual results, establishing compensation and deciding on capital allocation priorities. Significant expenses regularly provided to the CODM, and included in the measure of profit and loss, are cost of sales, operating and maintenance expense and selling, general and administrative expense, as reported in our Consolidated Statements of Operations. Included in the measure of profit and loss are significant noncash items of changes in the fair value of our derivative instruments, which were $1.5 billion and $917 million in gains for the three and six months ended June 30, 2025, respectively, and $606 million and $321 million in gains for the same periods of 2024, respectively. Interest income, which is included in interest and dividend income on our Consolidated Statements of Operations, was $29 million and $65 million for the three and six months ended June 30, 2025, respectively, and $47 million and $108 million for the same periods of 2024, respectively.
The measure of segment assets is reported on our Consolidated Balance Sheets as total assets. Substantially all of our tangible long-lived assets, which consist of property, plant and equipment, are located in the United States. Total expenditures for additions to long-lived assets is reported on our Consolidated Statements of Cash Flows.
The concentration of our customer credit risk in excess of 10% of total revenues and/or trade and other receivables, net of current expected credit losses and contract assets, net of current expected credit losses was as follows:
Percentage of Total Revenues from External Customers
Percentage of Trade and Other Receivables, Net and Contract Assets, Net from External Customers
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Information Regarding Forward-Looking Statements
This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things:
•statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
•statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
•statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
•statements relating to Cheniere’s capital deployment, including intent, ability, extent and timing of capital expenditures, debt repayment, dividends, share repurchases and execution on the capital allocation plan;
•statements regarding our future sources of liquidity and cash requirements;
•statements relating to the construction of our Trains and pipelines, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
•statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
•statements regarding counterparties to our commercial contracts, construction contracts and other contracts;
•statements regarding our planned development and construction of additional Trains or pipelines, including the financing of such Trains or pipelines;
•statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
•statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
•statements relating to our goals, commitments and strategies in relation to environmental matters;
•statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
•statements regarding our anticipated LNG and natural gas marketing activities; and
•any other statements that relate to non-historical or future information.
All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that
the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this quarterly report and in the other reports and other information that we file with the SEC, including those discussed under “Risk Factors” in our annual report on Form 10-K for the fiscal year ended December 31, 2024 and our quarterly report on Form 10-Q for the quarterly period ended March 31, 2025. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.
Introduction
The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future.
Our discussion and analysis includes the following subjects:
Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers.
LNG is natural gas (methane) in liquid form. The LNG we produce is shipped all over the world, converted back into natural gas (called “regasification”) and then transported via pipeline to homes and businesses and used as an energy source that is essential for heating, cooking, other industrial uses and back up for intermittent energy sources. Natural gas is a cleaner-burning, abundant and affordable source of energy. When LNG is converted back to natural gas, it can be used instead of coal, which reduces the amount of pollution traditionally produced from burning fossil fuels, like sulfur dioxide and particulate matter that enters the air we breathe. Additionally, compared to coal, it produces significantly fewer carbon emissions. By liquefying natural gas, we are able to reduce its volume by 600 times so that we can load it onto special LNG carriers designed to keep the LNG cold and in liquid form for efficient transport overseas.
We are the largest producer of LNG in the United States and we were the second largest LNG operator globally, based on our total production capacity of our liquefaction facilities as of June 30, 2025. Our total production capacity is expected to be over60 mtpa of LNG, including approximately 14 mtpa under construction as of June 30, 2025, inclusive of estimated debottlenecking opportunities.
We own and operate a natural gas liquefaction and export facility located in Cameron Parish, Louisiana at Sabine Pass (the “Sabine Pass LNG Terminal”), one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with CQP, which is a publicly traded limited partnership that we formed in 2007. As of June 30, 2025, we owned 100% of the general partner interest, a 48.6% limited partner interest and 100% of the incentive distribution rights of CQP. The Sabine Pass LNG Terminal has natural gas liquefaction facilities with total production capacity of over 30 mtpa of LNG (the “SPL Project”) as of June 30, 2025. The Sabine Pass LNG Terminal also has five LNG storage tanks with aggregate capacity of approximately 17 Bcfe and vaporizers with regasification capacity of approximately 4 Bcf/d, as well as three marine berths, two of which can accommodate vessels with nominal capacity of up to 266,000 cubic meters and
the third berth which can accommodate vessels with nominal capacity of up to 200,000 cubic meters. We also own and operate through CQP a 94-mile natural gas supply pipeline that interconnects the Sabine Pass LNG Terminal with several large interstate and intrastate pipelines (the “Creole Trail Pipeline”).
Additionally, we own and operate a natural gas liquefaction and export facility located near Corpus Christi, Texas (the “Corpus Christi LNG Terminal”) through CCL, which has natural gas liquefaction facilities with total expected production capacity of over 30 mtpa of LNG, including approximately 14 mtpa under construction as of June 30, 2025, inclusive of estimated debottlenecking opportunities. The Corpus Christi LNG Terminal also has three LNG storage tanks with aggregate capacity of approximately 10 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters. We also own and operate through CCP an approximately 21-mile natural gas supply pipeline that interconnects the Corpus Christi LNG Terminal with several large interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline”).
As noted above, we are constructing an expansion of the Corpus Christi LNG Terminal that is expected to add over 10 mtpa of operational liquefaction capacity across seven midscale Trains once fully completed (the “Corpus Christi Stage 3 Project”), inclusive of the first midscale Train that reached substantial completion in March 2025. Subsequently, in August 2025, the second midscale Train of the Corpus Christi Stage 3 Project reached substantial completion. In addition to the Corpus Christi Stage 3 Project, on June 17, 2025, our board of directors (the “Board”) made a positive FID with respect to two additional midscale Trains with an expected total production capacity of approximately 5 mtpa of LNG, inclusive of estimated debottlenecking opportunities (the “Midscale Trains 8 & 9 Project” and together with the existing assets at the Corpus Christi LNG Terminal, the Corpus Christi Stage 3 Project and the Corpus Christi Pipeline, the “CCL Project”) and issued a full notice to proceed with construction to Bechtel Energy Inc. (“Bechtel”) effective June 18, 2025. Non-FTA export authorization on the Midscale Trains 8 & 9 Project is pending with the DOE.
Our long-term counterparty arrangements form the foundation of our business and provide us with significant, stable, long-term cash flows, and include SPAs, in which our customers are generally required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, and IPM agreements, in which a gas producer sells natural gas to us on a global LNG or natural gas index price, less a fixed liquefaction fee, shipping and other costs. The SPAs also have a variable fee component, which is primarily indexed to Henry Hub and generally structured to cover the cost of natural gas purchases, transportation and liquefaction fuel consumed to produce LNG. Since we procure most of our feedstock for LNG production from the U.S., the structure of these contracts helps limit our exposure to fluctuations in U.S. natural gas prices. Through our SPAs and IPM agreements currently in effect, with approximately 15 years of weighted average remaining life as of June 30, 2025, we have contracted approximately 90%of the total anticipated production from the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) through the mid-2030s, excluding volumes from contracts with terms less than 10 years and volumes that are contractually subject to additional liquefaction capacity beyond what is currently in construction or operation. LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements.
Disciplined Accretive Growth
We remain focused on safety, operational excellence and customer satisfaction. Increasing demand for LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. Our capital allocation plan is designed, in part, to invest in financially disciplined growth accretive to our common stock. Capital investment parameters are the foundation of our disciplined, accretive growth, and include consideration to:
•Achieve value accretive returns through long-term commercial contracts: We aim to contract approximately 90% of our current and planned liquefaction capacity under long-term SPAs and IPM agreements with creditworthy counterparties under the pricing structures described above, with financial parameters that consider, among other things, targeted unlevered returns that exceed our cost of equity and return on stock at prevailing stock prices and project leverage.
•Achieve credit accretive returns: We aim to conservatively fund our projects through financing structures that sustain our long-term, run-rate leverage and credit metrics.
We have increased available liquefaction capacity at our Liquefaction Projects as a result of debottlenecking and other optimization projects. We believe these factors provide a foundation for additional growth in our portfolio of customer contracts in the future. We hold significant land positions at both the Sabine Pass LNG Terminal and the Corpus Christi LNG Terminal, which provide opportunity for further liquefaction capacity expansion. We are developing an expansion adjacent to the SPL Project with an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities, and supporting infrastructure (the “SPL Expansion Project”), and we are commercializing to support the additional liquefaction capacity associated with this project. This project and any future expansions at our sites require, among other things, regulatory approvals and acceptable commercial and financing arrangements before we make a positive FID. Risks associated with cost overruns and delays in the completion of our expansion projects are described in the risk factors of our annual report on Form 10-K for the fiscal year ended December 31, 2024 and our quarterly report on Form 10-Q for the quarterly period ended March 31, 2025.
The following table summarizes pre-FID development efforts and certain key milestones associated with the SPL Expansion Project:
SPL Expansion Project
Expected total production capacity of LNG (1)
Up to ~ 20 mtpa
Milestone
Regulatory (2)
FERC authorizations:
Positive environmental assessment
Pending
Order under Section 3 of NGA
Pending
Certification to commence construction (3)
DOE export authorization:
FTA countries
ü
Non-FTA countries
Pending
Financing
Financing (4)
Commercialization and Other Contracting
Definitive commercial agreements (5)
In process
Definitive full-scope EPC contract
Critical Milestone
Target FID (6)
2026/2027
ü indicates receipt of authorization, subject to ongoing conditionality
(1)Anticipated based on capacity, scale, location and infrastructure. Subject to regulatory review and approval and may change based on design considerations, engagement with contractors and other factors. Subject to adjustment for planned maintenance, production reliability, potential overdesign and debottlenecking opportunities.
(2)Our activities, including our expansion activities, are highly regulated, and require regulatory approvals at various stages, including approvals of the FERC and DOE under Sections 3 and 7 of the NGA, as well as several other material governmental and regulatory approvals and permits. The progression of our expansion projects is dependent on receiving all regulatory approvals required within the respective stages. See our annual report on Form 10-K for the fiscal year ended December 31, 2024and our quarterly report on Form 10-Q for the quarterly period ended March 31, 2025for further discussion of the regulations under federal, state and local statutes, rules, regulations and laws to which we are subject and associated risks factors relating to regulations.
(3)Based on letter from the FERC granting our request to commence with site preparation. The FERC orders require us to comply with certain ongoing conditions and obtain certain additional FERC and other regulatory agency approvals as construction progresses.
(4)We anticipate drawing on current committed facilities and/or incurring additional debt to finance the construction of the SPL Expansion Project, if we reach a positive FID.
(5)Liquefaction capacity partially contracted by Cheniere Marketing and SPL Stage V through SPA or IPM agreements conditioned on additional liquefaction capacity beyond what is currently in construction or operation.
(6)Expected to be subject to phased FID. Any positive FID is subject to achievement of or consideration to relevant milestones and capital investment parameters described herein.
We have excluded from the table above a potential further expansion of the CCL Project with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities, and supporting infrastructure (the “CCL Stage 4 Expansion Project”), for which we commenced the pre-filing process with the FERC in July 2025, as none of the milestones within the table have yet been achieved.
Overview of Significant Events
Our significant events since January 1, 2025 and through the filing date of this Form 10-Q include the following:
Strategic
•In July 2025, we submitted a request to initiate the pre-filing review process with the FERC under the National Environmental Policy Act for the CCL Stage 4 Expansion Project, a potential further expansion of the Corpus Christi LNG Terminal with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities.
•In June 2025, our Board made a positive FID with respect to the investment in the development, construction and operation of the CCL Midscale Trains 8 & 9 Project and issued a full notice to proceed with construction to Bechtel under a fixed price separated turnkey EPC contract.
•In June 2025, certain subsidiaries of CQP updated the SPL Expansion Project’s FERC application, originally filed in February 2024, to reflect a two-phased project, inclusive of three liquefaction trains and supporting infrastructure, maintaining an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities.
•In May 2025, Cheniere Marketing entered into an IPM agreement with Canadian Natural Resources Limited to purchase 140,000 MMBtu per day of natural gas at a price based on the Japan Korea Marker, less fixed LNG shipping costs and a fixed liquefaction fee, for a term of approximately 15 years commencing in approximately 2030. This agreement is subject to us making a positive FID with respect to the SPL Expansion Project or unilaterally waiving such condition.
•In March 2025, we received authorization from the FERC under the NGA to site, construct and operate the CCL Midscale Trains 8 & 9 Project.
Operational
•As of August 1, 2025, approximately 4,220 cumulative LNG cargoes totaling approximately 290 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Projects.
•In March and August 2025, substantial completions of Trains 1 and 2, respectively, of the Corpus Christi Stage 3 Project were achieved.
•In August 2025, we amended and restated our $1.25 billion Cheniere Revolving Credit Facility to, among other things, (1) extend the maturity date thereunder, (2) reduce the interest rate and commitment fees payable thereunder and (3) make certain other changes to the terms and conditions of the existing Cheniere Revolving Credit Facility. See Note 8—Debt of our Notes to Consolidated Financial Statements for additional details.
•In July 2025, CQP issued and sold $1.0 billion aggregate principal amount of 5.550% Senior Notes due 2035 (the “2035 CQP Senior Notes”), and the net proceeds, together with cash on hand, were used to redeem $1.0 billion of the aggregate principal amount of its 5.875% Senior Secured Notes due 2026(the “2026 SPL Senior Notes”).
•In June 2025, we announced updates to our company outlook, which included a plan to increase our annualized dividend by over 10% to $2.22 per common share commencing with the third quarter of 2025, subject to declaration by our Board.
•In February 2025, Fitch Ratings upgraded the issuer credit rating of both Cheniere and CQP to BBB from BBB- with a stable outlook. In June 2025, S&P Global Ratings concurrently assigned a BBB rating to the 2035 CQP Senior Notes and upgraded the remaining unsecured CQP notes to BBB from BBB-.
•During the three and six months ended June 30, 2025, we accomplished the following pursuant to our capital allocation priorities:
◦We repurchased approximately 1.4 million and 3.0 million shares of our common stock, respectively, as part of our share repurchase program for approximately $306 million and $656 million, respectively.
◦In March 2025, SPL repaid the remaining $300 million aggregate principal amount outstanding of its 5.625% Senior Secured Notes due 2025 (the “2025 SPL Senior Notes”) at maturity.
◦We paid dividends of $0.500 and $1.000 per share of common stock, respectively.
◦We continued to invest in accretive organic growth, including our investments in the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project, as further described under Investing Cash Flows in Sources and Uses of Cash within Liquidity and Capital Resources.
Volumes loaded and recognized from the Liquefaction Projects
Three Months Ended June 30, 2025
Six Months Ended June 30, 2025
(in TBtu)
Operational
Commissioning
Total
Operational
Commissioning
Total
Volumes loaded during the current period
550
—
550
1,152
6
1,158
Volumes loaded during the prior period but recognized during the current period
32
1
33
39
—
39
Less: volumes loaded during the current period and in transit at the end of the period
(32)
—
(32)
(32)
—
(32)
Total volumes recognized in the current period
550
1
551
1,159
6
1,165
Components of LNG revenues and corresponding LNG volumes delivered
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
Variance
2025
2024
Variance
LNG revenues (in millions):
LNG from the Liquefaction Projects sold under third party long-term agreements (1)
$
3,575
$
2,755
$
820
$
7,343
$
5,798
$
1,545
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements (2)
687
229
458
1,963
1,022
941
LNG procured from third parties (2)
86
—
86
150
119
31
Net derivative gain
101
5
96
218
35
183
Other revenues
66
53
13
146
105
41
Total LNG revenues
$
4,515
$
3,042
$
1,473
$
9,820
$
7,079
$
2,741
Volumes delivered as LNG revenues (in TBtu):
LNG from the Liquefaction Projects sold under third party long-term agreements (1)
496
524
(28)
1,012
1,062
(50)
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements (2)
54
28
26
147
98
49
LNG procured from third parties (2)
8
—
8
15
11
4
Total volumes delivered as LNG revenues
558
552
6
1,174
1,171
3
(1)Long-term agreements include agreements with an initial tenor of 12 months or more.
(2)Includes volumes sold under short-term agreements and volumes sold from natural gas procured under IPM agreements.
Net income attributable to Cheniere
Net income attributable to Cheniere increased $746 million and $597 million for the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, primarily due to $873 million and $596 million of favorable changes in fair value of agreements accounted for as derivative instruments (before tax and the impact of non-controlling interests). The incremental favorable change in fair value of agreements accounted for as derivative instruments between the comparable three and six month periods was primarily attributable to widening market-based locational price differentials for U.S. natural gas deliveries and the relative estimated convergence of applicable global and U.S. domestic natural gas prices, each of which impacted our natural gas and power supply derivatives. Additionally, moderate decreases in prompt global natural gas price indices in the current year, relative to increasing indexed pricing in the prior year, favorably impacted our derivatives related to the sale and purchase of physical LNG. Also contributing to the favorable variances were $294 million and $508 million between the comparable three and six month periods, respectively, of increases in LNG revenues, net of cost of sales and excluding derivatives, primarily as a result of higher pricing per MMBtu, as described below under the caption Revenues.
Partially offsetting these increases were increased tax provisions of $216 million and $228 million for the three and six month periods, respectively, as further explained in Income tax provision below, increased operating and maintenance expenses of $96 million and $118 million for the three and six month periods, respectively, due to the completion of planned large-scale maintenance activities on two trains at the SPL Project during the quarter, and $51 million and $120 million decreases in sublease income from our LNG vessels due to fewer days the LNG vessels were subleased and at lower rates in the current year as compared to the same period of 2024.
The following is an additional discussion of the significant drivers of the variance in net income attributable to Cheniere by line item:
Revenues
The $1.4 billion and $2.6 billion increases in revenues between the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, were primarily attributable to:
•$1.2 billion and $2.2 billion increases in revenues between the three and six month periods, respectively, due to higher pricing per MMBtu from both increased Henry Hub pricing, to which the majority of our long-term LNG sales contracts are indexed, and from international gas pricing; and
•$126 million and $301 million increases in revenues between the three and six month periods, respectively, due to higher volumes of LNG delivered between the periods.
Operating costs and expenses
The $448 million and $1.8 billion unfavorable variances between the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, were primarily attributable to:
•$1.1 billion and $2.0 billion increases in cost of sales excluding the effect of derivative changes between the comparable three and six month periods, respectively, substantially all related to the increases in cost of natural gas feedstock, largely due to the increase in U.S. natural gas prices as further described under the caption Revenues; and
•$96 million and $118 million increases in operating and maintenance expenses between the comparable three and six month periods, respectively, primarily due to the completion of planned large-scale maintenance activities on two trains at the SPL Project during the second quarter and additional expenses as a result of substantial completion of Train 1 of the Corpus Christi Stage 3 Project in March 2025, partially offset by non-recurrence of increased consumables and chemicals cost in the comparable prior periods.
These unfavorable variances were partially offset by $766 million and $327 million of favorable changes in fair value of agreements accounted for as derivative instruments included in cost of sales between the comparable three and six month periods, respectively, with the primary drivers of the variance described above under the caption Net income attributable to Cheniere.
Other income (expense)
The $9 million and $43 million favorable variances between the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, were primarily attributable to:
•$20 million and $57 million decreases in interest expense, net of capitalized interest, between the comparable three and six month periods, respectively, due to $9 million and $30 million increases, respectively, in interest costs qualifying for capitalization, given the higher carrying value of assets under construction, and additionally due to lower gross interest costs due to debt reduction activities associated with our long-term capital allocation plan; and
•$17 million increase in other income, net, between the comparable six month periods primarily from a $26 million gain recognized on the sale of our equity interests in an equity method investment during the three months ended March 31, 2025.
These favorable variances were partially offset by $16 million and $40 million decreases in interest and dividend income between the comparable three and six month periods, respectively, as a result of decreased interest rates and lower average cash and cash equivalents balances between the periods.
The $216 million and $228 million unfavorable variances between the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, were primarily attributable to increases in our effective tax rate, as described below, as well as a higher tax expense due to $951 million and $792 million increases in pre-tax income, respectively.
Our effective tax rate was 18.3% and 17.6% for the three and six months ended June 30, 2025, respectively, as compared to 15.3% and 13.8% for the same periods of 2024, respectively. Our effective tax rate increased between the comparable periods primarily due to a decreased proportion of our pre-tax income attributable to CQP, which is partially not taxable to us, and a reduced Foreign Derived Intangible Income (“FDII”) deduction. The decrease in the proportion of our pre-tax income attributable to CQP was primarily attributable to favorable changes in fair value of agreements accounted for as derivative instruments as described above under the caption Net income attributable to Cheniere, which were less impactful to CQP’s income as compared to ours. Additionally contributing to the unfavorable variance between the comparable six month periods was an increased tax expense due to a valuation allowance on a capital loss carryover generated on the sale of all of our equity interests in an equity method investment during the three months ended March 31, 2025, as discussed above under the caption Other income (expense). The effective tax rate for the comparable three and six month periods was lower than the statutory rate of 21.0% primarily due to CQP’s income that is partially not taxable to us.
On July 4, 2025, the One Big Beautiful Bill Act (“OBBBA”) was signed into law with significant changes to the Internal Revenue Code that are expected to impact us, including, among other provisions, 100% bonus depreciation on qualifying assets acquired after January 19, 2025 and changes to the FDII deduction rules, renamed to the Foreign Derived Deduction Eligible Income (“FDDEI”) under the OBBBA. The 100% bonus depreciation under the OBBBA is expected to reduce our income tax payable retroactively from the effective date, which will be adjusted in our Consolidated Financial Statements in the third quarter of 2025, the period of enactment. Under law in effect prior to the OBBBA, the effective rate on FDII was scheduled to increase as a result of a decrease in the FDII deduction to 21.875% for tax years beginning after December 31, 2025. Effective for tax years beginning after December 31, 2025, the OBBBA sets the FDDEI deduction at 33.34%, and also eliminates for purposes of FDDEI, the qualified business asset investment provisions and the requirement to apportion certain expenses to foreign derived income. The FDDEI provisions are expected to have a favorable impact on our effective tax rate once effective beginning in 2026. Refer to Liquidity and Capital Resources for the discussion of the effects of the OBBBA on our operating cash flows.
Net income attributable to non-controlling interests
The $11 million and $33 million decreases between the three and six months ended June 30, 2025, respectively, as compared to the same periods of 2024, were primarily attributable to $17 million and $58 million decreases in CQP’s consolidated net income.
Significant factors affecting our results of operations
Below are significant factors that affect our results of operations.
Gains and losses on derivative instruments
Derivative instruments, which we use to manage certain risks, are reported at fair value in our Consolidated Financial Statements. For commodity derivative instruments, including those related to our IPM agreements, the underlying LNG sales being economically hedged are accounted for under the accrual method of accounting, whereby revenues expected to be derived from the future LNG sales are recognized only upon delivery or realization of the underlying transaction. Notwithstanding the operational intent to mitigate risk exposure over time, the recognition of derivative instruments at fair value has the effect of recognizing gains or losses relating to future period exposure, and given the significant volumes, long-term duration and volatility in price basis for certain of our derivative contracts, the use of derivative instruments may result in continued volatility of our results of operations based on changes in market pricing, counterparty credit risk and other relevant factors that may be outside of our control. For example, as described in Note 5—Derivative Instruments of our Notes to Consolidated Financial Statements, the fair value of the Liquefaction Supply Derivatives incorporates, as applicable, market participant-based assumptions pertaining to certain contractual uncertainties, including those related to the availability of market information for delivery points, which may require future development of infrastructure, as well as the timing of satisfaction of certain events or
development of infrastructure to support natural gas gathering and transport. We may recognize changes in fair value through earnings that could significantly impact our results of operations if and when such uncertainties are resolved.
Commissioning volumes
Prior to substantial completion of a Train, amounts received from the sale of commissioning volumes from that Train are offset against LNG terminal construction-in-process, because these amounts are earned or loaded during the testing phase for the construction of that Train and are necessary activities to bring the asset to the condition for its intended use. During the three and six months ended June 30, 2025, we realized offsets to LNG terminal costs of $7 million and $55 million, respectively, corresponding to 1 TBtu and 6 TBtu, respectively, of LNG that were related to the sale of commissioning volumes. We did not record any offsets to LNG terminal costs during the three and six months ended June 30, 2024.
Business Seasonality
Our quarterly results are affected by production levels, timing of our maintenance activities and the resulting availability of volumes. Therefore, operating profit may not be generated evenly throughout the year. Weather variations, including temperature, have an impact on LNG output at our Liquefaction Projects. Our Liquefaction Projects are capable of relatively higher production volumes during the cooler months as compared to the summer months. We typically perform our scheduled major maintenance activities at our sites during shoulder months in the second and third quarters in order to mitigate the impact to our annual operating results.
Additional liquefaction capacities
The Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project are currently under construction and are expected to add over 15 mtpa of operational liquefaction capacity, inclusive of estimated debottlenecking opportunities, once all Trains reach substantial completion, of which approximately 14 mtpa is still under construction or commissioning as of June 30, 2025. Substantial completion was achieved for the first Train of the Corpus Christi Stage 3 Project in March 2025. Additionally, first LNG was produced from the second Train of the Corpus Christi Stage 3 Project in June 2025, and substantial completion was achieved in August 2025. The operation and maintenance of these Trains and increased LNG volumes produced are expected to result in higher revenues and operating costs and expenses. However, prior to the commencement of long-term SPAs associated with these volumes, the additional volumes will be sold by our integrated marketing function at prevailing market prices. Additionally, potential expansion projects that increase the amount of LNG volumes produced, including those discussed above in Disciplined Accretive Growth, would also be expected to result in higher revenues and operating costs and expenses.
Liquidity and Capital Resources
The following information describes our ability to generate and obtain adequate amounts of cash to meet our requirements in the short term and the long term. In the short term, we expect to meet our cash requirements using operating cash flows and available liquidity, consisting of cash and cash equivalents, restricted cash and cash equivalents and available commitments under our credit facilities. Additionally, we expect to meet our long term cash requirements by using operating cash flows and other future potential sources of liquidity, which may include debt and equity offerings by us or our subsidiaries.
The table below provides a summary of our available liquidity (in millions). Future material sources of liquidity are discussed below.
June 30, 2025
Cash and cash equivalents (1)
$
1,648
Restricted cash and cash equivalents (1)
369
Available commitments under our credit facilities (2):
SPL Revolving Credit Facility
785
CQP Revolving Credit Facility
1,000
CCH Credit Facility
3,260
CCH Working Capital Facility
1,390
Cheniere Revolving Credit Facility (3)
1,250
Total available commitments under our credit facilities
7,685
Total available liquidity
$
9,702
(1)Amounts presented include balances held by our consolidated variable interest entities (“VIEs”), as discussed in Note 6—Non-controlling Interests and Variable Interest Entities of our Notes to Consolidated Financial Statements. As of June 30, 2025, assets of our VIEs, which are included in our Consolidated Balance Sheets, included $108 million of cash and cash equivalents and $40 million of restricted cash and cash equivalents.
(2)Available commitments represent total commitments less loans outstanding and letters of credit issued under each of our credit facilities as of June 30, 2025. See Note 8—Debt of our Notes to Consolidated Financial Statements for additional information on our credit facilities and other debt instruments.
(3)In August 2025, we entered into an amendment and restatement of the Cheniere Revolving Credit Facility. See Note 8—Debt of our Notes to Consolidated Financial Statements for additional details.
Our liquidity position subsequent to June 30, 2025 will be driven by future sources of liquidity and future cash requirements. For a discussion of our future sources and uses of liquidity, see the liquidity and capital resources disclosures in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations in our annual report on Form 10-K for the fiscal year ended December 31, 2024.
Although our sources and uses of cash are presented below from a consolidated standpoint, SPL, CQP, CCH and Cheniere operate with independent capital structures. Certain restrictions or requirements under debt and equity instruments executed by our subsidiaries limit the entity’s use of cash, including the following:
•SPL and CCH are required to deposit all cash received into restricted cash and cash equivalents accounts under certain of their debt agreements. The usage or withdrawal of such cash is restricted to the payment of liabilities related to the Liquefaction Projects and other restricted payments. In addition, SPL and CCH’s operating costs are managed by our subsidiaries under affiliate agreements, which may require SPL and CCH to advance cash to the respective affiliates, however the cash remains restricted for operation and construction of the Liquefaction Projects;
•CQP is required under its partnership agreement to distribute to unitholders all available cash on hand at the end of a quarter less the amount of any reserves established by its general partner. Beginning with the distribution paid in the second quarter of 2022, quarterly distributions by CQP are currently comprised of a base amount plus a variable amount equal to the remaining available cash per unit, which takes into consideration, among other things, amounts reserved for annual debt repayment and capital allocation goals, anticipated capital expenditures to be funded with cash, and cash reserves to provide for the proper conduct of CQP’s business;
•Our 48.6% limited partner interest, 100% general partner interest and incentive distribution rights in CQP limit our right to receive cash held by CQP to the amounts specified by the provisions of CQP’s partnership agreement; and
•SPL and CCH are restricted by affirmative and negative covenants included in certain of their debt agreements in their ability to make certain payments, including distributions, unless specific requirements are satisfied.
Despite the restrictions noted above, we believe that sufficient flexibility exists within the Cheniere complex to enable each independent capital structure to meet its currently anticipated cash requirements. The sources of liquidity at SPL, CQP and
CCH primarily fund the cash requirements of the respective entity, and any remaining liquidity not subject to restriction, as supplemented by liquidity provided by Cheniere Marketing, is available to enable Cheniere to meet its cash requirements.
Corpus Christi LNG Terminal Expansion
In March 2025, substantial completion of the first of seven midscale Trains of the Corpus Christi Stage 3 Project was achieved. Additionally, first LNG was produced from the second Train of the Corpus Christi Stage 3 Project in June 2025, and substantial completion was achieved in August 2025. In June 2025, our Board made a positive FID with respect to the CCL Midscale Trains 8 & 9 Project and issued a full notice to proceed with construction to Bechtel under an EPC contract for a contract price of approximately $2.9 billion, subject to adjustment only by change order, and a guaranteed substantial completion date within the second half of 2028. The project completion and construction status for the CCL Midscale Trains 8 & 9 Project as of June 30, 2025 was not yet available. See Sources and Uses of Cash below for further discussion of the expenditures related to these projects.
The following table summarizes the project completion and construction status of the Corpus Christi Stage 3 Project as of June 30, 2025:
Corpus Christi Stage 3 Project
Overall project completion percentage
86.7%
Completion percentage of:
Engineering
98.9%
Procurement
99.8%
Subcontract work
91.6%
Construction
64.9%
Date of expected substantial completion of remaining Trains
2H 2025 - 2H 2026
Sources and Uses of Cash
The following table summarizes the sources and uses of our cash, cash equivalents and restricted cash and cash equivalents (in millions). The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table.
Six Months Ended June 30,
2025
2024
Net cash provided by operating activities
$
2,059
$
2,362
Net cash used in investing activities
(1,575)
(1,185)
Net cash used in financing activities
(1,653)
(2,746)
Effect of exchange rate changes on cash, cash equivalents and restricted cash and cash equivalents
(4)
(2)
Net decrease in cash, cash equivalents and restricted cash and cash equivalents
$
(1,173)
$
(1,571)
Operating Cash Flows
The $303 million decrease between the periods was primarily related to lower cash flows attributed to working capital from differences in timing of payments to suppliers and cash collections from the sale of LNG cargoes, partially offset by higher net cash inflows from LNG sales, as explained above in Results of Operations, and increased cash inflows from settlement of derivative instruments.
As described in Results of Operations, the OBBBA was signed into law on July 4, 2025 and includes, among other provisions, the FDDEI, which is expected to reduce our income taxes payable once effective beginning in 2026, and 100% bonus depreciation on qualifying assets acquired after January 19, 2025, which is expected to reduce our income taxes payable in 2025.
Our investing net cash outflows in both periods were primarily for construction costs for the Corpus Christi Stage 3 Project, which were $741 million and $909 million during the six months ended June 30, 2025 and 2024, respectively, as well as for optimization and other site improvement projects. The $168 million decrease in construction costs for the Corpus Christi Stage 3 Project between the periods was primarily related to the timing of cash payments under the related EPC contract. Further contributing to our investing net cash outflows for the six months ended June 30, 2025 was $547 million of costs paid for the CCL Midscale Trains 8 & 9 Project, primarily related to procurement under the related EPC contract with Bechtel, and work performed by them under a limited notice to proceed. We expect to continue to incur capital expenditures for the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project as construction progresses on these projects.
Financing Cash Flows
The following table summarizes our financing activities (in millions):
Six Months Ended June 30,
2025
2024
Proceeds from issuances of debt and borrowings
$
265
$
2,725
Redemptions and repayments of debt
(565)
(3,021)
Distributions to non-controlling interests
(400)
(451)
Contributions from redeemable non-controlling interest
49
—
Payments related to tax withholdings for share-based compensation
(46)
(41)
Repurchase of common stock, inclusive of excise taxes paid
(690)
(1,699)
Dividends to stockholders
(223)
(202)
Other, net
(43)
(57)
Net cash used in financing activities
$
(1,653)
$
(2,746)
Proceeds from Issuances of Debt and Borrowings
The following table shows the proceeds from issuances of debt and borrowings, including intra-quarter activity (in millions):
Six Months Ended June 30,
2025
2024
Proceeds from issuances of debt and borrowings
Cheniere:
5.650% Senior Notes due 2034
$
—
$
1,497
CQP:
5.750% Senior Notes due 2034
—
1,198
SPL:
SPL Revolving Credit Facility
265
30
Total proceeds from issuances of debt and borrowings
The following table shows the redemptions and repayments of debt, including intra-quarter activity (in millions):
Six Months Ended June 30,
2025
2024
Redemptions and repayments of debt
SPL:
5.750% Senior Secured Notes due 2024
$
—
$
(300)
5.625% Senior Secured Notes due 2025
(300)
(1,200)
SPL Revolving Credit Facility
(265)
(30)
CCH:
5.875% Senior Notes due 2025
—
(1,491)
Total redemptions and repayments of debt
$
(565)
$
(3,021)
Repurchase of Common Stock
During the six months ended June 30, 2025 and 2024, we paid $656 million and $1.7 billion to repurchase approximately 3.0 million and 10.7 million shares of our common stock, respectively, under our share repurchase program. Additionally, during the six months ended June 30, 2025, we paid $33 million of excise taxes related to our repurchase of common stock during the fiscal years 2023 and 2024. As of June 30, 2025, we had approximately $3.2 billion remaining under our share repurchase program.
Cash Dividends to Stockholders
During the six months ended June 30, 2025, we paid aggregate dividends of $1.000 per share of common stock for a total of $223 millionand during the six months ended June 30, 2024, we paid aggregate dividends of $0.870 per share of common stock for a total of $202 million.
On June 17, 2025, we declared a quarterly dividend of $0.500 per share of common stock that is payable on August 18, 2025 to stockholders of record as of the close of business on August 8, 2025.
Summary of Critical Accounting Estimates
The preparation of Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. There have been no significant changes to our critical accounting estimates from those disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2024.
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Marketing and Trading Commodity Price Risk
We have commodity derivatives consisting of natural gas and power supply contracts for the commissioning and operation of the Liquefaction Projects and the SPL Expansion Project, and associated economic hedges (collectively, the “Liquefaction Supply Derivatives”) and physical and financial derivatives to hedge the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (collectively, “LNG Trading Derivatives”). In order to test the sensitivity of the fair value of the Liquefaction Supply Derivatives and the LNG Trading Derivatives to changes in underlying commodity prices, management modeled a 10% change in the commodity price for natural gas for each delivery location and a 10% change in the commodity price for LNG, respectively, as follows (in millions):
June 30, 2025
December 31, 2024
Fair Value
Change in Fair Value
Fair Value
Change in Fair Value
Liquefaction Supply Derivatives
$
(2)
$
2,327
$
(742)
$
2,516
LNG Trading Derivatives
91
59
17
49
See Note 5—Derivative Instruments of our Notes to Consolidated Financial Statements for additional details about our commodity derivative instruments.
ITEM 4. CONTROLS AND PROCEDURES
We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our management, including our Chief Executive Officer and our Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our Chief Executive Officer and our Chief Financial Officer concluded that our disclosure controls and procedures are effective.
During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
We may in the future be involved as a party to various legal proceedings, which are incidental to the ordinary course of business. We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters. There have been no material changes to the legal proceedings disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2024.
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
Purchase of Equity Securities by the Issuer and Affiliated Purchasers
The following table summarizes share repurchases for the three months ended June 30, 2025:
Period
Total Number of Shares Purchased
Average Price Paid Per Share
Total Number of Shares Purchased as a Part of Publicly Announced Plans
Approximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (in millions)
April 1-30, 2025
1,049,473
$212.54
1,049,473
$3,317
May 1-31, 2025
246,149
$231.37
246,149
$3,260
June 1-30, 2025
112,666
$231.92
112,666
$3,234
Total
1,408,288
1,408,288
ITEM 5. OTHER INFORMATION
Rule 10-b5-1 Trading Arrangements
Rule 10b5-1 under the Exchange Act provides an affirmative defense that enables prearranged transactions in securities in a manner that avoids concerns about initiating transactions at a future date while possibly in possession of material nonpublic information. Our Insider Trading Policy permits our directors and executive officers to enter into trading plans designed to comply with Rule 10b5-1. During the three-month period ending June 30, 2025, none of our executive officers or directors adopted or terminated a Rule 10b5-1 trading plan or adopted or terminated a non-Rule 10b5-1 trading arrangement (as defined in Item 408(c) of Regulation S-K).
Cheniere A&R Revolving Credit Facility
On August 1, 2025, we entered into a $1.25 billion Third Amended and Restated Revolving Credit Agreement among us, as borrower, various lenders (the “Lenders”) and issuing banks, MUFG Bank, Ltd., as the coordinating lead arranger, the joint lead arrangers party thereto, Sumitomo Mitsui Banking Corporation, as sustainability advisor, and Société Générale, as administrative agent for the Lenders (the “Cheniere A&R Revolving Credit Facility”). The Cheniere A&R Revolving Credit Facility amends and restates the existing Cheniere Revolving Credit Facility dated as of October 28, 2021 and amended on June 15, 2023, to, among other things, (i) extend the maturity date thereunder to August 1, 2030, (ii) reduce the rate of interest and commitment fees applicable thereunder, and (iii) make certain other changes to the terms and conditions of the existing Cheniere Revolving Credit Facility. Commitments under the Cheniere A&R Revolving Credit Facility are available for loans or the issuances of letters of credit (subject to issuing bank capacity), in each case, for general corporate purposes.
Loans under the Cheniere A&R Revolving Credit Facility will bear interest at a variable rate per annum equal to Term SOFR or the base rate specified therein, plus an applicable margin. The applicable margin for Term SOFR loans ranges from 1.125% to 2.00% per annum, and the applicable margin for base rate loans ranges from 0.125% to 1.00% per annum, in each case, based on the credit ratings then in effect assigned to loans under the Cheniere A&R Revolving Credit Facility. Based on
our current credit ratings, the applicable margins for Term SOFR loans and base rate loans are 1.25% and 0.25%, respectively. Interest on Term SOFR loans is due and payable at the end of each Term SOFR period, and interest on base rate loans is due and payable at the end of each calendar quarter. We will pay a commitment fee on the average daily amount of undrawn commitments at an annual rate that ranges from 0.10% to 0.30% based on the credit ratings then in effect assigned to loans under the Cheniere A&R Revolving Credit Facility. Based on our current credit ratings, the commitment fee on undrawn commitments is 0.15%. The interest rate and the commitment fees may be reduced by five basis points on the interest rate and by one basis point on the commitment fee based on the achievement of certain methane emissions management standards.
The Cheniere A&R Revolving Credit Facility contains customary representations and warranties, events of default and affirmative and negative covenants, including restrictions on our ability to incur liens and to undergo certain fundamental changes. As of the date of this Quarterly Report on Form 10-Q, no amounts were drawn under the Cheniere A&R Revolving Credit Facility.
The foregoing summary of the Cheniere A&R Revolving Credit Facility does not purport to be complete and is subject to, and qualified in its entirety by reference to, the Cheniere A&R Revolving Credit Facility, which is filed as Exhibit 10.3 to this Quarterly Report on Form 10-Q and is incorporated herein by reference.
Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
*
Filed herewith.
**
Furnished herewith.
44
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
CHENIERE ENERGY, INC.
Date:
August 6, 2025
By:
/s/ Zach Davis
Zach Davis
Executive Vice President and Chief Financial Officer
(on behalf of the registrant and as principal financial officer)
Date:
August 6, 2025
By:
/s/ David Slack
David Slack
Senior Vice President and Chief Accounting Officer
(on behalf of the registrant and as principal accounting officer)