UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

Form 6-K

 

 

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

20 October 2026

 

 

BHP GROUP LIMITED

(ABN 49 004 028 077)

(Exact name of Registrant as specified in its charter)

 

 

VICTORIA, AUSTRALIA

(Jurisdiction of incorporation or organisation)

171 COLLINS STREET, MELBOURNE,

VICTORIA 3000 AUSTRALIA

(Address of principal executive offices)

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F: ☐ Form 20-F ☐ Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934: ☐ Yes ☒ No

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a

 

 
 


 

LOGO       20 October 2026

Operational review for the quarter ended 30 September 2026

Safety a key focus; strong price realisation with no change to production guidance.

“The deaths of two colleagues at Escondida and Peak Downs are a profound loss. Our thoughts remain with their families and friends. No loss of life is acceptable. Investigations are underway and we will keep strengthening the controls that keep people safe in our pursuit of being a fatality free business.

Copper production was lower in the first quarter, reflecting planned grade declines and scheduled maintenance, alongside temporary disruptions from severe weather in Chile, stops for safety and the conveyor failure at Carrapateena. Our bulk commodities delivered a strong start to FY27 through a maintenance-intensive quarter. WAIO set records at both the mine and port, while BMA and NSW Energy Coal both delivered higher production than the same period last year. Stronger commodity prices provided a tailwind for earnings, particularly in copper where prices were around 50 per cent higher than a year ago.

We are building the next phase of growth in copper and potash. We continued to strengthen one of the world’s largest copper portfolios, from funding the Escondida New Concentrator in Chile to growing our resource base and long-term production potential at Copper South Australia, while also expanding our copper growth pipeline across the Americas. Jansen is rapidly taking shape, with Stage 1 now 87 per cent complete and on track for first production in mid-2027, adding a new and important commodity to our portfolio.

Global markets remain volatile, with geopolitical tensions, trade uncertainty and elevated energy and freight costs continuing to create headwinds across the industry. At the same time, demand for commodities remains resilient, supported by continued industrialisation and urbanisation in China and India, alongside unprecedented investment in data centres and enabling infrastructure globally, which is reinforcing the long-term outlook for copper. That demand plays to the strength of our portfolio, which touches almost every part of how the world builds, powers and feeds itself.”

 

   Brandon Craig,
   BHP Chief Executive Officer

Summary

 

  
   

Operational excellence 

  

Copper growth

Full year guidance remains unchanged

  

Progressing our organic growth options

Copper production decreased due to lower planned concentrator feed grades and operational disruptions across our assets including planned maintenance and severe weather in Chile.

 

Our bulk commodities delivered a strong start to the year. WAIO increased production 4% during a period of significant planned maintenance, demonstrating the strength and resilience of our integrated supply chain. Production at BMA was also strong reflecting improved operating performance, while NSWEC’s production increased due to higher bypass coal.

  

We are advancing our strategy to grow Copper SA’s copper production to ~500ktpa by 2035 and up to 650ktpa by 2040 and today we announced an increase to Olympic Dam’s mineral resource base. At our November site visit, we will provide further detail regarding our strategy. We also renamed the Oak Dam exploration project ‘Ankata’ in recognition of the cultural significance of the area to the Kokatha people.

 

At Escondida, US$0.8 bn (100% basis) of pre-commitment funding was approved to enable execution readiness for the Escondida New Concentrator and we remain on track to deliver first potash production at our Jansen project in mid-CY27.

 

   

Strategic partnerships 

  

Social value

Supporting growth

   Building long-term, sustainable value

In September, BHP signed an MOU with KGHM Polska Miedź S.A. (55% owner of Sierra Gorda) to explore opportunities for both parties to collaborate and unlock synergy value at Spence and Sierra Gorda. The focus areas of collaboration include technical expertise, exploration and future development projects.

 

We also completed a transaction with Faraday to divest BHP’s San Manuel legacy asset and increase BHP’s interest in the emerging US copper developer to 32% (non-diluted basis).

  

In July 2026, BMA became BHP’s first operated Australian asset to reach 100% renewable electricity, based on current forecast demand. We also partnered with Amazon Web Services (AWS) on an industry-first pilot to sell credits to AWS for lower greenhouse gas-emissions associated with copper from Escondida, helping to develop a market-based mechanism that connects lower-emissions copper production with customer demand.

 

In September, we held our ESG Roundtable covering safety, operational decarbonisation, climate and social value.

 

     
 Production    Quarter performance     Production guidance  
 
      Q1 FY27      v Q4 FY26     v Q1 FY26    

FY27

guidance

         
 

Copper (kt)

     400.7        (19 %)      (19 %)      1,650 – 1,800           
 

Escondida (kt)

     252.6        (19 %)      (23 %)      1,000 – 1,100        Unchanged  
 

Pampa Norte (Spence) (kt)

     47.4        (13 %)      (15 %)      210 – 230        Unchanged  
 

Copper South Australia (kt)

     60.7        (33 %)      (16 %)      290 – 320        Unchanged  
 

Antamina (kt)

     40.0        13 %      18 %      120 – 140        Unchanged  
           

Iron ore (Mt)

     66.5        (2 %)      4 %      260 – 272           
 

WAIO (Mt)

     64.3        (3 %)      4 %      253 – 264        Unchanged  
 

WAIO (100% basis) (Mt)

     71.9        (4 %)      2 %      286 – 298        Unchanged  
 

Samarco (Mt)

     2.2        10 %      4 %      7.5 – 8.0        Unchanged  
           

Steelmaking coal – BMA (Mt)

     4.9        (13 %)      1 %      18.5 – 20.5           
 

BMA (100% basis) (Mt)

     9.8        (13 %)      1 %      37 – 41        Unchanged  
           

Energy coal – NSWEC (Mt)

     4.4        6 %      26 %      14 – 16        Unchanged  


BHP | Operational review for the quarter ended 30 September 2026

 

Segment and asset performance | FY27 YTD v FY26 YTD

 

LOGO   

 

Further information in Appendix 1

 

Detailed production and sales information for all operations in Appendix 2

 

Copper

 

  

Production

 

401 kt ê19%

 

Q1 FY26 494 kt

 

FY27e 1,650 – 1,800 kt

 

Average realised price

 

US$7.01/lb é53%

 

Q1 FY26 US$4.59/lb

  

Total copper production decreased 19% to 401 kt. Copper production guidance for FY27 remains unchanged at between 1,650 and 1,800 kt.

 

Escondida 252.6 kt ê23% (100% basis)

 

A fatal incident involving one of our employees occurred at Escondida on 23 September. An investigation is underway and we are working closely with local authorities.

 

Production decreased due to lower concentrate production, reflecting planned lower feed grade of 0.81% (Q1 FY26: 0.94%) and scheduled maintenance in the quarter. The fatal incident also led to a temporary suspension of all mining activities, and severe weather in July and August constrained operational logistics and truck fleet utilisation. Cathode production increased, supported by higher Full SaL recoveries and improved sulphide leaching performance.

 

A new collective agreement with Union N°2 of Supervisors was signed and became effective for 36 months from 14 October 2026.

 

Production guidance for FY27 remains unchanged at between 1,000 and 1,100 kt. Concentrator feed grade guidance of ~0.70% for the full year also remains unchanged.

  

We continue to make progress on the Escondida Growth Program, with US$0.8 bn (100% basis) of pre-commitment funding approved to enable further engineering, permitting and execution readiness for the Escondida New Concentrator.

 

Pampa Norte (Spence) 47.4 kt ê15%

   Production decreased due to lower concentrate production, reflecting planned lower feed grade of 0.53% (Q1 FY26: 0.65%) and ongoing challenges in managing ore variability.
   Progress continues towards first production from the Concentrator Upgrade Recovery project in FY28 and the Spence Chalcopyrite Leaching project in CY28.
   Production guidance for FY27 remains unchanged at between 210 and 230 kt, with volumes weighted to the second half.
   Copper South Australia 60.7 kt ê16%
   Production decreased primarily due to the underground conveyor belt failure at Carrapateena, disclosed with the FY26 results. A replacement belt was installed and was operational within seven weeks, followed by a progressive ramp-up through September. The conveyor is now operating at full capacity. Olympic Dam started to build anode inventory as planned ahead of the Smelter Campaign Maintenance 27 program (scheduled for H1 FY28).
   At Prominent Hill, concentrate sales were higher than production during the quarter, reflecting the drawdown of inventory built up in H2 FY26.
   Production guidance for FY27 remains unchanged at between 290 and 320 kt.
   Other copper
   At Antamina, copper production increased 18% to 40 kt as a result of planned higher feed grades and strong operational performance. Zinc production decreased 70% to 11 kt as a result of planned lower feed grades.
   FY27 copper production guidance of between 120 and 140 kt and zinc production guidance of between 35 and 55 kt remain unchanged.

 

2


BHP | Operational review for the quarter ended 30 September 2026

 

Iron ore

 

  

Production

 

66 Mt é4%

 

Q1 FY26 64 Mt

 

FY27e 260 – 272 Mt

 

Average realised price

 

US$76.27/wmt ê9%

 

Q1 FY26 US$84.04/wmt

  

Iron ore production increased 4% to 66.5 Mt. Production guidance for FY27 remains unchanged at between 260 and 272 Mt.

 

WAIO 64.3 Mt é4% | 71.9 Mt (100% basis)

 

Production increased as a result of strong operational performance across our mine, rail and port operations, in a quarter of significant planned maintenance, with Q1 records achieved at both the mine and port.

 

We are currently undertaking a major rebuild of Car Dumper 4 at Port Hedland, which had a 1.4 Mt (100% basis) volume impact in Q1. The project is progressing well at ~40% complete and remains on track for completion in H1 FY27.

 

We are also making strong progress on our investments to deliver production of >305 Mt by the end of FY28. The sixth car dumper (CD6) is on track for completion in Q4 FY28. Once operational we expect CD6 will assist in offsetting the production impact from major car dumper renewals beginning in FY29, while also enhancing ore blending and screening capability at the port. The Western Ridge Crusher project remains on track with first ore scheduled for H1 FY27.

 

Production guidance for FY27 remains unchanged at between 253 and 264 Mt (286 and 298 Mt on a 100% basis).

  

 

Samarco 2.2 Mt é4% | 4.3 Mt (100% basis)

 

    

Production increased due to strong concentrator performance. Production guidance for FY27 remains unchanged at between 7.5 and 8 Mt.

 

Coal

 

Steelmaking coal

 

  

Production

 

4.9 Mt é1%

 

Q1 FY26 4.9 Mt

 

FY27e 18.5 – 20.5 Mt

 

Average realised price

 

US$242.82/t é34%

 

Q1 FY26 US$180.67/t

  

BMA 4.9 Mt é1% | 9.8 Mt (100% basis)

 

Production increased reflecting strong operational performance and mine sequencing. BMA’s focus remains on stabilising raw coal inventory levels and normalising strip ratio over the medium term. Operations at all mines were suspended following the fatality of a team member, with mining suspended for one week at Peak Downs and 24 hours across other operations. Investigations are ongoing.

 

A longwall move at Broadmeadow is scheduled to commence late in Q2 FY27.

 

Production guidance for FY27 remains unchanged at between 18.5 and 20.5 Mt (37 and 41 Mt on a 100% basis), with volumes weighted to the second half.

Energy coal

 

  

Production

 

4.4 Mt é26%

 

Q1 FY26 3.5 Mt

 

FY27e 14 – 16 Mt

 

Average realised price

 

US$116.60/t é23%

 

Q1 FY26 US$95.18/t

  

NSWEC 4.4 Mt é26%

 

Production increased driven by higher bypass coal as mining progressed into lower strip ratio areas and improved wash plant throughput.

 

Production guidance for FY27 remains unchanged at between 14 and 16 Mt, with volumes weighted to the first half.

 

3


BHP | Operational review for the quarter ended 30 September 2026

 

Quarterly performance | Q1 FY27 v Q4 FY26

 

 

Copper 

 

     

 

Iron ore

 

   

401 kt ê19%

 

Q4 FY26 492 kt

 

Lower production at Escondida and Spence due to planned lower grades, scheduled maintenance, the safety incident at Escondida and severe weather impacts. Production was also lower at Copper SA due to planned maintenance and the Carrapateena belt rip. This was partially offset by higher production at Antamina due to higher concentrator throughput.

 

 

66 Mt ê2%

 

Q4 FY26 68 Mt

  Lower production at WAIO as a result of planned maintenance including the rebuild of Car Dumper 4.

 

Steelmaking coal 

 

 

 

Energy coal

 

4.9 Mt ê13%

 

Q4 FY26 5.7 Mt

 

Production decreased due to planned higher strip ratio and scheduled maintenance.

 

Operations were also impacted following the safety incident at Peak Downs.

 

 

4.4 Mt é6%

Q4 FY26 4.2 Mt

  Higher production due to increased bypass coal. This was supported by the completion ahead of schedule of the annual wash plant maintenance.

 

4


BHP | Operational review for the quarter ended 30 September 2026

 

Appendix 1

Average realised pricesi

 

                Quarter           
       Q1 FY27        v Q4 FY26        v Q1 FY26  

 Copper (US$/lb)

     7.01        7%        53%  

 Iron ore (US$/wmt, FOB)

     76.27        (9% )       (9% ) 

 Steelmaking coal (US$/t)

     242.82        4%        34%  

 Energy coal (US$/t)ii

     116.60        (1% )       23%  

 

i

Based on provisional, unaudited estimates. Prices exclude sales from equity accounted investments, third party product and internal sales, and represent the weighted average of various sales terms (for example: FOB, CIF and CFR), unless otherwise noted. Includes the impact of provisional pricing and finalisation adjustments.

 

ii

Export sales only. Includes thermal coal sales from steelmaking coal mines.

Current year unit cost guidance

 

 Unit cost

     FY27 guidance i         

 Escondida (US$/lb)

     1.20 – 1.50          Unchanged  

 Spence (US$/lb)

     2.40 – 2.70       Unchanged  

 Copper South Australia (US$/lb)ii

     0.30 – 0.80       Unchanged  

 WAIO (US$/t)

     20.25 – 21.75       Unchanged  

 BMA (US$/t)

     126 –137       Unchanged  

 

i

FY27 unit cost guidance ranges are based on exchange rates of AUD/USD 0.70 and USD/CLP 890. WAIO and BMA’s FY27 unit cost guidance ranges are subject to movements in the diesel benchmark.

 

ii

Copper SA unit cost guidance is calculated using the following assumptions for by-products: gold US$4,300/oz and uranium US$80/lb.

Medium term guidancei

 

      

Production

guidance

 

 

    

Unit cost

guidance

 

 

 Escondida

     900 –1,000 ktpa        US$1.30 – 1.60/lb  

 Spence

     ~235 ktpa        US$2.10 – 2.40/lb  

 WAIO (100% basis)

     >305 Mtpa        <US$19.00/t  

 BMA (100% basis)

     43 – 45 Mtpa        <US$120/t  

 

i

Medium-term unit cost guidance ranges are based on exchange rates of AUD/USD 0.70 and USD/CLP 890. Medium-term guidance target refers to an average between FY28 and FY31 for Escondida and Spence. At WAIO this is expected to be achieved in FY29 and at BMA by the end of the five-year medium-term horizon.

Major projects

 

Commodity

  Project and ownership   Capacity  

Estimated project expenditurei

US$M

 

First production

target date

  Progress

Potash

 

Jansen Stage 1 (Canada)

100%

  Design, engineering and construction of an underground potash mine and surface infrastructure, with capacity to produce 4.15 Mtpa   8,400   Mid-CY27   Project is 87% complete

Potash

 

Jansen Stage 2 (Canada)

100%

  Development of additional mining districts, completion of the second shaft hoist infrastructure, expansion of processing facilities and addition of rail cars to facilitate production of an incremental 4.36 Mtpa   6,900   Late-FY31   Project is 18% complete

 

i

Includes project capital expenditure, project operating expenditure, cost to construct right-of-use assets (i.e. Westshore port terminal and third-party rail line) and related contingencies.

Exploration

Minerals exploration and evaluation expenditure was US$87 m for Q1 FY27 (Q1 FY26: US$90 m), of which US$67 m was expensed (Q1 FY26: US$76 m).

 

 

5


BHP | Operational review for the quarter ended 30 September 2026

 

Appendix 2

 

            Production                 Sales  
            Quarter ended           Year to date                 Quarter ended           Year to date  
            Sep     Dec     Mar     Jun     Sep           Sep     Sep     Var                 Sep     Dec     Mar     Jun     Sep           Sep     Sep     Var  
            2025     2025     2026     2026     2026           2026     2025     %                 2025     2025     2026     2026     2026           2026     2025     %  

Group production and sales summary

 

                     

By commodity

 

                     

Metals production is payable metal unless otherwise noted.

 

                                     

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

                                                                                                                   

Copper

  Payable metal in concentrate   kt     374.0       366.5       347.7       337.6       277.0         277.0       374.0       (26 %)          343.0       373.8       350.0       321.2       302.2         302.2       343.0       (12 %) 
  Escondida   kt     282.4       270.5       248.3       245.6       197.9         197.9       282.4       (30 %)          258.3       277.7       252.1       233.6       210.7         210.7       258.3       (18 %) 
  Pampa Norte (Spence)   kt     35.4       33.3       25.7       26.9       27.2         27.2       35.4       (23 %)          33.2       27.9       34.9       24.4       32.2         32.2       33.2       (3 %) 
  Copper South Australia   kt     19.9       22.2       27.5       29.8       11.9         11.9       19.9       (40 %)          15.9       24.8       18.0       27.3       22.9         22.9       15.9       44 % 
  Antamina   kt     33.9       38.2       44.1       35.3       40.0         40.0       33.9       18 %          33.1       40.4       43.3       35.9       36.4         36.4       33.1       10 % 
  Carajás1   kt     2.4       2.3       2.1       -       -         -       2.4       -           2.5       3.0       1.7       -       -         -       2.5       -  
  Cathode   kt     119.6       124.0       129.1       154.3       123.7         123.7       119.6       3 %          105.9       130.7       118.7       162.1       115.1         115.1       105.9       9 % 
  Escondida   kt     46.5       46.7       54.9       66.3       54.7         54.7       46.5       18 %          38.1       50.0       50.1       71.8       48.4         48.4       38.1       27 % 
  Pampa Norte (Spence)   kt     20.4       24.4       18.9       27.6       20.2         20.2       20.4       (1 %)          17.9       25.4       17.4       29.3       20.0         20.0       17.9       12 % 
  Copper South Australia   kt     52.7       52.9       55.3       60.4       48.8         48.8       52.7       (7 %)          49.9       55.3       51.2       61.0       46.7         46.7       49.9       (6 %) 
    Total   kt     493.6       490.5       476.8       491.9       400.7         400.7       493.6       (19 %)          448.9       504.5       468.7       483.3       417.3         417.3       448.9       (7 %) 

Lead

  Payable metal in concentrate   t     754       91       209       225       73         73       754       (90 %)          1,469       551       14       207       236         236       1,469       (84 %) 
    Antamina   t     754       91       209       225       73         73       754       (90 %)          1,469       551       14       207       236         236       1,469       (84 %) 

Zinc

  Payable metal in concentrate   t     35,991       27,003       17,723       15,410       10,952         10,952       35,991       (70 %)          41,499       26,046       18,573       14,703       11,413         11,413       41,499       (72 %) 
    Antamina   t     35,991       27,003       17,723       15,410       10,952         10,952       35,991       (70 %)          41,499       26,046       18,573       14,703       11,413         11,413       41,499       (72 %) 

Gold

  Payable metal in concentrate   troy oz     76,242       73,585       105,321       84,889       70,710         70,710       76,242       (7 %)          66,377       82,099       87,012       87,621       81,378         81,378       66,377       23 % 
  Escondida   troy oz     35,348       31,927       52,473       39,706       40,946         40,946       35,348       16 %          35,348       31,927       52,473       39,706       40,946         40,946       35,348       16 % 
  Pampa Norte (Spence)   troy oz     2,589       2,724       3,800       3,595       5,379         5,379       2,589       108 %          2,589       2,724       3,800       3,595       5,379         5,379       2,589       108 % 
  Copper South Australia   troy oz     36,489       36,993       47,264       41,588       24,385         24,385       36,489       (33 %)          26,476       45,024       29,234       44,320       35,053         35,053       26,476       32 % 
  Carajás1   troy oz     1,816       1,941       1,784       -       -         -       1,816       -           1,964       2,424       1,505       -       -         -       1,964       -  
  Refined gold   troy oz     50,716       61,910       54,511       63,888       49,656         49,656       50,716       (2 %)          51,147       59,054       57,336       55,962       48,038         48,038       51,147       (6 %) 
  Copper South Australia   troy oz     50,716       61,910       54,511       63,888       49,656         49,656       50,716       (2 %)          51,147       59,054       57,336       55,962       48,038         48,038       51,147       (6 %) 
    Total   troy oz     126,958       135,495       159,832       148,777       120,366         120,366       126,958       (5 %)          117,524       141,153       144,348       143,583       129,416         129,416       117,524       10 % 

Silver

  Payable metal in concentrate   troy koz     4,114       4,109       4,839       3,709       3,493         3,493       4,114       (15 %)          4,136       4,252       4,518       3,573       3,319         3,319       4,136       (20 %) 
  Escondida   troy koz     1,942       2,176       2,780       2,193       1,790         1,790       1,942       (8 %)          1,942       2,176       2,780       2,193       1,790         1,790       1,942       (8 %) 
  Pampa Norte (Spence)   troy koz     358       316       375       241       356         356       358       (1 %)          358       316       375       241       356         356       358       (1 %) 
  Copper South Australia   troy koz     182       179       222       219       114         114       182       (37 %)          131       207       162       192       180         180       131       37 % 
  Antamina   troy koz     1,632       1,438       1,462       1,056       1,233         1,233       1,632       (24 %)          1,705       1,553       1,201       947       993         993       1,705       (42 %) 
  Refined silver   troy koz     227       284       308       281       224         224       227       (1 %)          255       250       340       249       234         234       255       (8 %) 
  Copper South Australia   troy koz     227       284       308       281       224         224       227       (1 %)          255       250       340       249       234         234       255       (8 %) 
    Total   troy koz     4,341       4,393       5,147       3,990       3,717         3,717       4,341       (14 %)          4,391       4,502       4,858       3,822       3,553         3,553       4,391       (19 %) 

Uranium

  Payable metal in concentrate   t     819       903       778       1,147       817         817       819       0 %          649       815       650       1,552       494         494       649       (24 %) 
    Copper South Australia   t     819       903       778       1,147       817         817       819       0 %          649       815       650       1,552       494         494       649       (24 %) 

Molybdenum

  Payable metal in concentrate   t     341       281       341       288       599         599       341       76 %          347       322       263       225       500         500       347       44 % 
  Pampa Norte (Spence)   t     257       269       194       163       303         303       257       18 %          208       256       205       132       339         339       208       63 % 
    Antamina   t     84       12       147       125       296         296       84       252 %          139       66       58       93       161         161       139       16 % 

Iron ore

  Western Australia Iron Ore (WAIO)   kt     62,015       67,766       60,922       66,174       64,299         64,299       62,015       4 %          62,430       66,909       58,608       66,430       66,306         66,306       62,430       6 % 
  Samarco   kt     2,066       1,938       1,882       1,954       2,151         2,151       2,066       4 %          2,042       2,512       1,590       1,950       1,941         1,941       2,042       (5 %) 
    Total   kt     64,081       69,704       62,804       68,128       66,450         66,450       64,081       4 %          64,472       69,421       60,198       68,380       68,247         68,247       64,472       6 % 

Steelmaking coal

  BHP Mitsubishi Alliance (BMA)   kt     4,865       4,291       3,816       5,654       4,913         4,913       4,865       1 %          4,472       4,413       3,852       5,905       4,821         4,821       4,472       8 % 

Energy coal

  NSW Energy Coal (NSWEC)   kt     3,518       4,610       4,037       4,196       4,449         4,449       3,518       26 %          3,707       4,372       4,048       4,538       3,931         3,931       3,707       6 % 

1 The divestment of Carajás was completed on 2 April 2026.

 

6


BHP | Operational review for the quarter ended 30 September 2026

 

           

 

Production

 

           

 

Sales

 

 
            Quarter ended         Year to date             Quarter ended         Year to date  
            Sep
2025
    Dec
2025
    Mar
2026
    Jun
2026
    Sep
2026
        Sep
2026
    Sep
2025
    Var
%
            Sep
2025
    Dec
2025
    Mar
2026
    Jun
2026
    Sep
2026
        Sep
2026
    Sep
2025
    Var
%
 

Production and sales

                                         

By asset

                                         

Copper

                                         
 

Metals production is payable metal unless otherwise noted.

                                         

Escondida, Chile¹

  BHP interest 57.5%

 

                                     
  Material mined   kt     114,527       112,808       114,506       130,749       107,802         107,802       114,527       (6%)                      
  Concentrator throughput   kt     36,721       35,628       34,225       35,862       31,429         31,429       36,721       (14%)                      
  Average copper grade - concentrator   %     0.94%       0.91%       0.88%       0.85%       0.81%         0.81%       0.94%       (14%)                      
  Production ex mill   kt     294.2       279.7       255.1       253.5       210.0         210.0       294.2       (29%)                                                                
  Payable copper   kt     282.4       270.5       248.3       245.6       197.9         197.9       282.4       (30%)           258.3       277.7       252.1       233.6       210.7         210.7       258.3       (18%)  
  Copper cathode (EW)   kt     46.5       46.7       54.9       66.3       54.7         54.7       46.5       18%           38.1       50.0       50.1       71.8       48.4         48.4       38.1       27%  
  Oxide leach   kt     16.8       11.1       19.9       29.3       22.3         22.3       16.8       33%                        
  Sulphide leach   kt     29.7       35.6       35.0       37.0       32.4         32.4       29.7       9%                        
  Total copper   kt     328.9       317.2       303.2       311.9       252.6         252.6       328.9       (23%)           296.4       327.7       302.2       305.4       259.1         259.1       296.4       (13%)  
  Payable gold concentrate   troy oz     35,348       31,927       52,473       39,706       40,946         40,946       35,348       16%           35,348       31,927       52,473       39,706       40,946         40,946       35,348       16%  
    Payable silver concentrate   troy koz     1,942       2,176       2,780       2,193       1,790         1,790       1,942       (8%)           1,942       2,176       2,780       2,193       1,790         1,790       1,942       (8%)  

1 Presented on a 100% basis. BHP interest in saleable production is 57.5%.

 

                                   

Pampa Norte (Spence), Chile¹

  BHP interest 100%

 

                                     
  Material mined   kt     24,695       22,895       21,690       22,066       21,201         21,201       24,695       (14%)                      
  Ore stacked   kt     5,652       5,354       4,435       5,146       5,386         5,386       5,652       (5%)                      
  Average copper grade - stacked   %     0.61%       0.58%       0.66%       0.64%       0.56%         0.56%       0.61%       (8%)                      
  Concentrator throughput   kt     7,778       8,002       7,329       8,107       7,459         7,459       7,778       (4%)                      
  Average copper grade - concentrator   %     0.65%       0.60%       0.53%       0.50%       0.53%         0.53%       0.65%       (18%)                                                                
  Payable copper   kt     35.4       33.3       25.7       26.9       27.2         27.2       35.4       (23%)           33.2       27.9       34.9       24.4       32.2         32.2       33.2       (3%)  
  Copper cathode (EW)   kt     20.4       24.4       18.9       27.6       20.2         20.2       20.4       (1%)           17.9       25.4       17.4       29.3       20.0         20.0       17.9       12%  
  Total copper   kt     55.8       57.7       44.6       54.5       47.4         47.4       55.8       (15%)           51.1       53.3       52.3       53.7       52.2         52.2       51.1       2%  
  Payable gold concentrate   troy oz     2,589       2,724       3,800       3,595       5,379         5,379       2,589       108%           2,589       2,724       3,800       3,595       5,379         5,379       2,589       108%  
  Payable silver concentrate   troy koz     358       316       375       241       356         356       358       (1%)           358       316       375       241       356         356       358       (1%)  
    Payable molybdenum   t     257       269       194       163       303         303       257       18%           208       256       205       132       339         339       208       63%  

1 Pampa Norte consists of Spence and Cerro Colorado. Cerro Colorado entered temporary care and maintenance in December 2023.

 

7


BHP | Operational review for the quarter ended 30 September 2026

 

           

 

Production

 

           

 

Sales

 

 
 
            Quarter ended         Year to date             Quarter ended         Year to date  
 
            Sep
2025
    Dec
2025
    Mar
2026
    Jun
2026
    Sep
2026
        Sep
2026
    Sep
2025
    Var
%
            Sep
2025
    Dec
2025
    Mar
2026
    Jun
2026
    Sep
2026
        Sep
2026
    Sep
2025
    Var
%
 
 

 Copper (continued)

                                         
 

 Copper South Australia, Australia

  BHP interest 100%                                        
 

 Copper

  Payable metal in concentrate   kt     25.5       24.8       28.3       30.7       17.7         17.7       25.5       (31%)           15.9       24.8       18.0       27.3       22.9         22.9       15.9       44%  
  Cathode   kt     52.7       52.9       55.3       60.4       48.8         48.8       52.7       (7%)           49.9       55.3       51.2       61.0       46.7         46.7       49.9       (6%)  
  Total copper   kt     78.2       77.7       83.6       91.1       66.5         66.5       78.2       (15%)           65.8       80.1       69.2       88.3       69.6         69.6       65.8       6%  
  Payable metal in concentrate transfer to Olympic Dam   kt     (5.6)       (2.6)       (0.8)       (0.9)       (5.8)         (5.8)       (5.6)       4%                        
  Net copper   kt     72.6       75.1       82.8       90.2       60.7         60.7       72.6       (16%)                                                                        
 

 Gold

  Payable metal in concentrate   troy oz     47,893       41,351       48,532       43,408       33,159         33,159       47,893       (31%)           26,476       45,024       29,234       44,320       35,053         35,053       26,476       32%  
  Refined gold   troy oz     50,716       61,910       54,511       63,888       49,656         49,656       50,716       (2%)           51,147       59,054       57,336       55,962       48,038         48,038       51,147       (6%)  
  Total gold   troy oz     98,609       103,261       103,043       107,296       82,815         82,815       98,609       (16%)           77,623       104,078       86,570       100,282       83,091         83,091       77,623       7%  
 
 

Payable metal in concentrate transfer to Olympic Dam

  troy oz     (11,404)       (4,358)       (1,268)       (1,820)       (8,774)         (8,774)       (11,404)       (23%)                        
 
    Net gold   troy oz     87,205       98,903       101,775       105,476       74,041         74,041       87,205       (15%)                                                                        
 

 Silver

  Payable metal in concentrate   troy koz     213       193       226       224       139         139       213       (35%)           131       207       162       192       180         180       131       37%  
  Refined silver   troy koz     227       284       308       281       224         224       227       (1%)           255       250       340       249       234         234       255       (8%)  
  Total silver   troy koz     440       477       534       505       363         363       440       (18%)           386       457       502       441       414         414       386       7%  
 
 

Payable metal in concentrate transfer to Olympic Dam

  troy koz     (31)       (14)       (4)       (5)       (25)         (25)       (31)       (19%)                        
 
    Net silver   troy koz     409       463       530       500       338         338       409       (17%)                                                                        
 

 Uranium

      t     819       903       778       1,147       817         817       819       0%           649       815       650       1,552       494         494       649       (24%)  
 
                                           
 

 Olympic Dam

                                           
 
  Material mined   kt     2,818       2,763       2,732       2,927       2,851         2,851       2,818       1%                        
  Ore milled   kt     2,640       2,926       2,565       2,769       2,764         2,764       2,640       5%                        
  Average copper grade   %     1.97%       1.97%       1.92%       2.14%       1.98%         1.98%       1.97%       1%                        
  Average uranium grade   kg/t     0.55       0.56       0.57       0.65       0.58         0.58       0.55       5%                        
  Copper cathode (ER and EW)   kt     52.7       52.9       55.3       60.4       48.8         48.8       52.7       (7%)           49.9       55.3       51.2       61.0       46.7         46.7       49.9       (6%)  
  Refined gold   troy oz     50,716       61,910       54,511       63,888       49,656         49,656       50,716       (2%)           51,147       59,054       57,336       55,962       48,038         48,038       51,147       (6%)  
  Refined silver   troy koz     227       284       308       281       224         224       227       (1%)           255       250       340       249       234         234       255       (8%)  
  Payable uranium   t     819       903       778       1,147       817         817       819       0%           649       815       650       1,552       494         494       649       (24%)  
 
                                           
 

 Prominent Hill

                                           
 
  Material mined   kt     1,049       1,014       1,026       1,271       975         975       1,049       (7%)                        
  Ore milled   kt     1,621       1,376       1,494       1,651       1,211         1,211       1,621       (25%)                        
  Average copper grade   %     0.71%       0.83%       0.90%       0.94%       0.84%         0.84%       0.71%       18%                        
  Concentrate produced   kt     19.0       19.1       25.7       30.7       20.5         20.5       19.0       8%                                                                        
  Payable copper   kt     9.9       9.7       11.8       13.1       8.8         8.8       9.9       (11%)           4.4       7.5       3.1       12.2       9.4         9.4       4.4       114%  
  Payable gold concentrate   troy oz     24,105       17,406       23,664       18,941       19,072         19,072       24,105       (21%)           9,033       17,671       5,894       23,401       15,199         15,199       9,033       68%  
  Payable silver concentrate   troy koz     61       49       60       63       40         40       61       (34%)           29       45       20       61       48         48       29       66%  
 
                                           
 

 Carrapateena

                                           
 
    Material mined   kt     1,488       1,479       1,632       1,751       753         753       1,488       (49%)                        
  Ore milled   kt     1,511       1,415       1,516       1,713       962         962       1,511       (36%)                        
  Average copper grade   %     1.18%       1.20%       1.22%       1.17%       1.07%         1.07%       1.18%       (9%)                        
  Concentrate produced   kt     52.4       53.4       61.4       65.2       32.6         32.6       52.4       (38%)                                                                        
  Payable copper   kt     15.6       15.1       16.5       17.6       8.9         8.9       15.6       (43%)           11.5       17.3       14.9       15.1       13.5         13.5       11.5       17%  
  Payable gold concentrate   troy oz     23,788       23,945       24,868       24,467       14,087         14,087       23,788       (41%)           17,443       27,353       23,340       20,919       19,854         19,854       17,443       14%  
  Payable silver concentrate   troy koz     152       144       166       161       99         99       152       (35%)           102       162       142       131       132         132       102       29%  

 

8


BHP | Operational review for the quarter ended 30 September 2026

 

             Production              Sales  
             Quarter ended          Year to date              Quarter ended          Year to date  
             Sep
2025
     Dec
2025
     Mar
2026
     Jun
2026
     Sep
2026
         Sep
2026
     Sep
2025
     Var
%
             Sep
2025
     Dec
2025
     Mar
2026
     Jun
2026
     Sep
2026
         Sep
2026
     Sep
2025
     Var
%
 

Copper (continued)

                                                         
 

Antamina, Peru

 

BHP interest 33.75%

 

      
  Material mined   kt      58,970        57,442        54,819        60,871        61,562          61,562        58,970        4%                                
  Concentrator throughput   kt      13,307        13,725        13,783        10,984        12,617          12,617        13,307        (5%)                                
  Average head grade - copper   %      0.86%        0.98%        1.12%        1.08%        1.02%          1.02%        0.86%        19%                                
  Average head grade - zinc   %      1.26%        1.01%        0.79%        0.74%        0.56%          0.56%        1.26%        (56%)                                                                                
  Payable copper   kt      33.9        38.2        44.1        35.3        40.0          40.0        33.9        18%            33.1        40.4        43.3        35.9        36.4          36.4        33.1        10%  
  Payable zinc   t      35,991        27,003        17,723        15,410        10,952          10,952        35,991        (70%)            41,499        26,046        18,573        14,703        11,413          11,413        41,499        (72%)  
  Payable silver   troy koz      1,632        1,438        1,462        1,056        1,233          1,233        1,632        (24%)            1,705        1,553        1,201        947        993          993        1,705        (42%)  
  Payable lead   t      754        91        209        225        73          73        754        (90%)            1,469        551        14        207        236          236        1,469        (84%)  
    Payable molybdenum   t      84        12        147        125        296          296        84        252%            139        66        58        93        161          161        139        16%  
                                                           
 

Carajás, Brazil1

 

BHP interest 100%

 

      
  Material mined   kt      134        147        148        -        -          -        134        -                                
  Ore milled   kt      160        172        156        -        -          -        160        -                                
  Average copper grade   %      1.63%        1.51%        1.48%        -        -          -        1.63%        -                                
  Production ex mill   kt      10.3        9.8        8.8        -        -          -        10.3        -                                
  Average gold grade   g/t      0.46        0.47        0.47        -        -          -        0.46        -                                                                                
  Payable copper   kt      2.4        2.3        2.1        -        -          -        2.4        -            2.5        3.0        1.7        -        -          -        2.5        -  
    Payable gold concentrate   troy oz      1,816        1,941        1,784        -        -          -        1,816        -            1,964        2,424        1,505        -        -          -        1,964        -  

1 The divestment of Carajás was completed on 2 April 2026.

 

                             
                             
                             

Iron ore

                                                         

Iron ore production is reported on the basis of saleable product, which is wet metric tonnes (wmt) for WAIO and dry metric tonnes (dmt) for Samarco.

 

                             
 

WAIO, Australia

 

BHP interest 85%

 

      
  Newman Joint Venture   kt      13,724        13,340        13,517        12,100        11,300          11,300        13,724        (18%)                                
  Area C Joint Venture   kt      29,415        32,265        33,584        33,762        29,149          29,149        29,415        (1%)                                
  Yandi Joint Venture   kt      3,498        2,899        2,941        3,252        2,671          2,671        3,498        (24%)                                
  Jimblebar¹   kt      15,378        19,262        10,880        17,060        21,179          21,179        15,378        38%                                
  Total   kt      62,015        67,766        60,922        66,174        64,299          64,299        62,015        4%                                
  Total (100%)   kt      70,246        76,326        69,752        74,840        71,909          71,909        70,246        2%                                                                                
  Lump   kt                                    20,250        20,595        19,878        22,014        18,505          18,505        20,250        (9%)  
  Fines   kt                                    42,180        46,314        38,730        44,416        47,801          47,801        42,180        13%  
  Total   kt                                    62,430        66,909        58,608        66,430        66,306          66,306        62,430        6%  
    Total (100%)   kt                                                                                    70,592        75,397        67,001        75,105        73,953          73,953        70,592        5%  

1 Presented on a 100% basis. BHP interest in saleable production is 85%.

 

                             
                                        
 

Samarco, Brazil

 

BHP interest 50%

 

      
    Total   kt      2,066        1,938        1,882        1,954        2,151          2,151        2,066        4%            2,042        2,512        1,590        1,950        1,941          1,941        2,042        (5%)  

 

 

9


BHP | Operational review for the quarter ended 30 September 2026

 

             Production              Sales  
             Quarter ended          Year to date              Quarter ended          Year to date  
             Sep
2025
     Dec
2025
     Mar
2026
     Jun
2026
     Sep
2026
         Sep
2026
     Sep
2025
     Var
%
             Sep
2025
     Dec
2025
     Mar
2026
     Jun
2026
     Sep
2026
         Sep
2026
     Sep
2025
     Var
%
 

Coal

                                                           
 

Coal production is reported on the basis of saleable product.

 

 

                             

BMA, Australia

  BHP interest 50%

 

            
 
  Goonyella   kt      1,880        1,254        1,124        1,995        1,909          1,909        1,880        2%                                
 
  Peak Downs   kt      1,111        967        1,176        1,584        1,191          1,191        1,111        7%                                
 
  Saraji   kt      884        1,146        849        1,073        846          846        884        (4%)                                
 
  Caval Ridge   kt      990        924        667        1,002        967          967        990        (2%)                                
 
  Total1   kt      4,865        4,291        3,816        5,654        4,913          4,913        4,865        1%                                
 
  Total (100%)1   kt      9,730        8,582        7,632        11,308        9,826          9,826        9,730        1%                                                                                
 
  Hard coking coal   kt                                    4,428        4,302        3,842        5,522        4,733          4,733        4,428        7%  
 
  Energy coal   kt                                    44        111        10        383        88          88        44        100%  
 
  Total   kt                                    4,472        4,413        3,852        5,905        4,821          4,821        4,472        8%  
 
    Total (100%)   kt                                                                                      8,944        8,826        7,704        11,810        9,642          9,642        8,944        8%  
 

1 Production figures include some energy coal.

 

 

                             
 

NSWEC, Australia

  BHP interest 100%

 

            
 
  Energy coal - Export   kt                                    3,549        4,190        3,935        4,224        3,879          3,879        3,549        9%  
 
  Energy coal - Domestic   kt                                    158        182        113        314        52          52        158        (67%)  
 
    Total   kt      3,518        4,610        4,037        4,196        4,449            4,449        3,518        26%            3,707        4,372        4,048        4,538        3,931          3,931        3,707        6%  

 

 

10


BHP | Operational review for the quarter ended 30 September 2026

 

Appendix 3

Executive Summary

Olympic Dam - Updated Mineral Resources

Table 1: Updated Olympic Dam Mineral Resources (inclusive of Ore Reserves) as at 1st September 20261

 

         
  Material type   

 

Measured Resources

  

 

Indicated Resources

  

 

Inferred Resources

  

 

Total Resources

   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t
   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t
   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t
   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t
                                         

UG Sulphide (Block Cave)

2,3,4,5,6

   4,000    0.61    0.19    0.21    1    4,130    0.57    0.18    0.21    1    2,600    0.60    0.19    0.23    1    10,730    0.59    0.19    0.21    1
                                         
UG Sulphide (SLOS)7    840    1.59    0.47    0.62    3    540    1.56    0.45    0.57    3    210    1.44    0.42    0.63    3    1,590    1.56    0.46    0.60    3
                                         
OC Sulphide8    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -    -

Footnotes for Table 1

 

1.

The information in this report that relates to Mineral Resources is based on and fairly represent the information and supporting documentation compiled by MP O’Hare, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM). The Competent Person is a full-time employee of BHP and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Competent Person confirms they have no conflict of interest, perceived or otherwise, and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

 

 

Tonnes and grades have been rounded so small differences may present in the totals.

 

2.

Block cave Mineral Resource assumes prior mining of declared underground (UG) sub-level open stoping (SLOS) Mineral Resource.

 

3.

A break-even economic cut-off of ≥0.35% Cu was applied to each selective mining unit (SMU) (after depletion for existing mining and entire SLOS Mineral Resource).

 

4.

Minimum SMU comprised of three connected regularised blocks with dimensions of 100 m by 100 m in XY and minimum of 200 m in Z, and a maximum depth of ~1,500 m from surface.

 

5.

SMU which contained ≥50% backfill (actual or future) was classified as Inferred.

 

6.

Geological confidence is informed by drilling samples, with drill spacing of <80 m for Measured, 80 m to 180 m for Indicated, and 180 m to 300 m for Inferred Resources.

 

7.

The UG Sulphide (SLOS) Mineral Resource is unchanged from that reported in BHP’s FY26 Annual Report (www.bhp.com), where it is referred to as ‘UG sulphide’.

 

8.

The UG Sulphide (SLOS) and UG Sulphide Block Cave (BC) Mineral Resources together account for the majority of the shallower mineralisation. The remaining mineralisation is insufficient to warrant ongoing reporting of an Open Cut (OC) Mineral Resource, and has been removed.

Table 2: Olympic Dam Ore Reserves as at 30th June 20261

 

       
  Material type   

 

Proved Ore Reserve

  

 

Probable Ore Reserve

  

 

Total Ore Reserve

   Mt    Cu %   

 

U3O8

kg/t

   Au
g/t
   Ag
g/t
   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t
   Mt    Cu %   

U3O8

kg/t

   Au
g/t
   Ag
g/t

UG Sulphide2,3,5,6

   355    1.89    0.59    0.72    4    254    1.68    0.53    0.62    3    609    1.80    0.56    0.68    4

Low grade4

   -    -    -    -    -    44    0.83    0.28    0.34    2    44    0.83    0.28    0.34    2

Footnotes for Table 2

 

1.

The information in this report that relates to Ore Reserves is based on and fairly represent the information and supporting documentation compiled by Naveen S Kinthada, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM). The Competent Person is a full-time employee of BHP and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Competent Person confirms they have no conflict of interest, perceived or otherwise, and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

 

 

Tonnes and grades have been rounded so small differences may present in the totals.

 

2.

Ore Reserves are declared using a SLOS mining method and are unchanged from that reported in BHP’s FY26 Annual Report (www.bhp.com).

 

3.

Variable cut-off between 1.0% and 1.7% Cu

 

4.

Low-grade is ≥0.6 Cu%

 

5.

Approximate drill-hole spacing used to classify the reserves were: 20 m to 35 m for Proved Reserves and 35 m to 70m for Probable Reserves.

 

6.

The metallurgical recoveries: Cu 94%, U3O8 65%, Au 71%, Ag 63%.

 

11


BHP | Operational review for the quarter ended 30 September 2026

 

1 Introduction

This report is issued in support of the first-time reporting of an underground block cave (BC) Mineral Resource at Olympic Dam, alongside the existing underground sub-level open stoping (SLOS) Mineral Resource. Ore Reserves remain unchanged from that reported in the FY26 Annual Report and is included for transparency and completeness. The newly reported Block Cave Mineral Resource has not been converted to Ore Reserve. The UG Sulphide (SLOS) and UG Sulphide Block Cave (BC) Mineral Resources together account for the majority of the shallower mineralisation. The remaining mineralisation is insufficient to warrant ongoing separate reporting of an Open Cut (OC) Mineral Resource and has been removed. These changes reflect the application of updated mining scenarios for the Olympic Dam Deposit: selective sub-level open stoping for higher-grade material and bulk underground mining, such as block caving, for large continuous volumes. Together, these scenarios support assessment of future mining options as studies progress.

Olympic Dam is an integrated copper (Cu), uranium (U3O8), gold (Au) and silver (Ag) mine located on traditional Kokatha Country in South Australia, 16 kilometres north of Roxby Downs and approximately 570 kilometres north-northwest of Adelaide, the capital of South Australia (Figure 1). The operation consists of an underground mine, mineral processing plant, copper smelter and refinery, as well as associated infrastructure. These are contained within the Olympic Dam’s special mining lease (SML) (Figure 2).

The updated Mineral Resource is based on the underlying resource model reported in BHP’s FY2026 Annual report as at 30 June 2026 (www.bhp.com). Material outside the existing SLOS Mineral Resource, including the relevant portion of mineralisation previously reported as OC, was reassessed for reasonable prospects of eventual economic extraction under a block-caving scenario. Total drilling for the updated Olympic Dam Mineral Resource is approximately 4,070 km, with a nominal drill hole spacing ranging from 20 m to >300 m, and approximately perpendicular to the interpreted orebody orientation. Resource definition drilling activities continue at Olympic Dam.

The Olympic Dam BC Mineral Resource is 10,730 Mt at 0.59 % Cu, 0.19 kg/t U3O8, 0.21 g/t Au, and 1 g/t Ag (Table 1). This considers a non-selective underground block caving scenario, reporting all material within a continuous shape designed to capture material generally above 0.35% Cu, where all material was deemed to have reasonable prospects of eventual economic extraction. As such, zero-grade waste material was included as internal dilution to account for the non-selective nature of block caving. As mining studies progress, the constraint (and therefore the reported Olympic Dam Mineral Resource) may change; block-cave mining remains at an early stage of assessment, and its potential development timeframe is not yet known.

The inclusion of an underground bulk mining method provides an updated total classified underground Mineral Resource for Olympic Dam, estimated to contain 88.1 Mt of Cu, 2.8 Mt of U3O8, 103 Moz of Au and 498 Moz of Ag, where Moz is million troy ounces. Contained metal estimates are calculated from the rounded total Resource tonnages and grades reported in Table 1, and are not an estimate of recoverable metal. Totals may differ due to rounding.

Mineralisation remains open at depth.1

2 Mineral tenement and land tenure

The Roxby Downs (Indenture Ratification) Act 1982 (SA) provides statutory authority for an agreement (Indenture) between BHP and the State of South Australia. The Indenture establishes the legal framework for existing and future operations at Olympic Dam and defines the roles and responsibilities of the South Australian Government and BHP. Part of the Indenture provided the grant of Olympic Dam’s special mining lease (SML).

The Indenture confers continuous mining rights (via the SML) to BHP until the deposit is economically depleted. The current 50-year term of the SML ends in 2036. Under key amendments to the Indenture agreed between the South Australian Government and BHP in 2026, a Final Investment Decision (FID) by BHP for the first phase of the Smelter Refinery Expansion Project would trigger rights for the expansion of the SML boundaries and extension of the SML term by 10 years to 2046. A subsequent FID by BHP for the Mine Concentrator Growth project would trigger a right to extend the SML term for a further 40 years to 2086. In addition to these specific extension rights, the Indenture still provides rights for further SML term extensions linked to the expected life of the mine (regardless of any FIDs by BHP). All agreements are in place as part of the normal operating practices.

 

 
1 

BHP Quarterly Activities Report, 18th Jan 2024 “Operational review for the half year ended 31 December 2023”. Appendix 3, Project status update – Olympic Dam “Deeps” (OD Deeps). www.bhp.com

 

12


BHP | Operational review for the quarter ended 30 September 2026

 

LOGO

Figure 1. Location of the Olympic Dam mine.

 

13


BHP | Operational review for the quarter ended 30 September 2026

 

LOGO

Figure 2. Approximate Olympic Dam resource outline within Special Mining Lease 1 (SML)

 

14


BHP | Operational review for the quarter ended 30 September 2026

 

3 Geology

The Olympic Dam deposit lies entirely within the Olympic Dam Breccia Complex (Figure 3), which is hosted by the 1,593.28 ± 0.26 Ma Roxby Downs Granite. The breccia complex contains the mineralised rock volume and covers approximately 50 km². It is about 6 km long and 3 km wide, typically extends to a depth of 900 m, and locally reaches more than 2,000 m below surface.

Approximately 350 m of unaltered, unmineralised, flat-lying Neoproterozoic to Cambrian sedimentary rocks unconformably overlie the breccia complex. The Roxby Downs Granite is the principal host rock. Other important components are bedded clastic facies; clasts of 1,594.63 ± 0.71 Ma Gawler Range Volcanic felsic feldspar-phyric lavas in hematite-rich breccias and dykes; and mafic-ultramafic lavas and dykes (MDY). The MDY are pre-, syn- and post-mineralisation, and form an integral part of the Olympic Dam ore-forming system. The breccia complex and the surrounding unbrecciated Roxby Downs Granite are intruded by the regionally extensive ca. 825 Ma Gairdner Dyke Swarm (dolerite).

Mineralisation is hosted by Roxby Downs Granite and other lithologies, including bedded clastic facies, felsic lavas, mafic-ultramafic lavas, sills and dykes, and subvolcanic quartz-phyric rhyolite. Tectonic, magmatic and hydrothermal processes have weakly to intensely brecciated these rocks. Iron oxide alteration has variably replaced them, producing a compositional continuum from recognisable lithologies to iron oxide breccias in which primary lithological textures have been obliterated. Faulting and brecciation commonly obscure lithological contacts.

More than 100 minerals occur in the deposit, although 15 account for more than 98% of the rock mass. The principal gangue minerals are hematite, quartz, muscovite, K-feldspar, chlorite, fluorite, siderite and barite. The dominant sulphide minerals are chalcocite/digenite/djurleite (collectively referred to here as chalcocite), bornite, chalcopyrite and pyrite. Sphalerite, galena, molybdenite and tennantite-tetrahedrite are less abundant, while native copper occurs only in trace amounts. Sulphides generally occur as disseminated grains within the breccia matrix and clasts, ranging in size from <20 µm to several millimetres, with an average grain size of approximately 100 µm. They only rarely occur as veins in granite-dominated breccias.

At the deposit scale, Cu ± Fe sulphides show a distinct upward and inward zonation: pyrite g chalcopyrite-pyrite g chalcopyrite exsolution lamellae in brown bornite g purple bornite-chalcocite symplectites g digenite lamellae in chalcocite.

 

15


BHP | Operational review for the quarter ended 30 September 2026

 

 

LOGO

Figure 3. Simplified geological plan of the Olympic Dam deposit, approximately 350 m below surface.

 

16


BHP | Operational review for the quarter ended 30 September 2026

 

LOGO

Figure 4. Plan view of the Olympic Dam deposit, showing the spatial relationship between a 0.35% Cu envelope, the outlines of mineral resource block cave and sublevel stoping. Mined stope, development and drilling provided for context.

 

 

17


BHP | Operational review for the quarter ended 30 September 2026

 

LOGO

Figure 5. Long section through the Olympic Dam deposit along A – A’ (Figure 4) looking NE. The ~500 m thick projection shows the spatial relationship between a 0.35% Cu envelope, the outlines of mineral resource block cave and sublevel stoping. Mined stope, development and drilling provided for context

 

 

18


BHP | Operational review for the quarter ended 30 September 2026

 

4 Data acquisition

4.1 Drilling and sampling

Drilling comprises oriented and unoriented diamond drilling from surface and underground locations. The drilling includes parent holes and, where additional trajectories are required, wedge holes. A parent hole is the primary drill hole; a wedge hole is a subsidiary or “child” hole initiated from a parent hole at depth, allowing several trajectories to be drilled from a single parent-hole collar. Drill spacing varies across the deposit from approximately 20 m to >300 m, and drilling is generally oriented perpendicular to the interpreted orebody geometry.

Surface drilling comprised parent holes and, where required, wedge holes drilled from parent holes. Surface parent holes were collared in PQ3 diameter (83 mm) through the overburden and continued in HQ3 (61.1 mm) or HQ (63.5 mm) core. Wedge holes were generally drilled in NQ2 diameter (50.6 mm). Navigational drilling was used in selected surface and underground programs to support trajectory control, including parent-hole and wedge-hole drilling. Downhole survey methods and quality control are described in Section 4.3 Surveys.

Longer underground parent holes were collared in HQ diameter (63.5 mm) to approximately 500 m, continued in NQ2 diameter (50.6 mm) to approximately 1,700 m, and completed in BQ diameter (36.5 mm) where required. Underground infill and grade-control holes were drilled in BQ diameter (36.5 mm) and were generally not oriented. Longer holes were oriented using the REFLEX ACT III tool; at the end of each run, the drillers marked the low side of the core, which was then used as the reference for marking the core and recording structural measurements. Grade-control holes were generally not oriented and were therefore not used for oriented structural measurements.

The drilling data and distribution are considered sufficient to support interpretation of geological and grade continuity for the declared Mineral Resource for an underground bulk-mining scenario and the existing Mineral Resource declaration for the selective-mining method. The geology is supported by ongoing underground mapping and mining. Drilling orientations were selected to test the interpreted mineralisation and structures, and the scale and geometry of the mineralised system in relation to the drilling orientation is unlikely to have introduced material sampling bias.

Sample recovery was estimated during logging by reconciling the cumulative reconstructed core length with the drilled length for each core run. Estimated recoveries were high, generally exceeding 99%. Fresh core is relatively competent, and the sulphide minerals are generally not friable. There is no clear relationship between sample recovery and grade in Olympic Dam drill core; consequently, no material bias is expected from preferential loss or gain of fine or coarse material.

Drill holes were logged in qualitative detail below the post-mineralised cover. Logging included lithology, rock composition and texture, alteration minerals, sulphide distribution, mineralisation characteristics and geotechnical information for rock-mass qualification. Structural measurements were recorded from oriented core, and core was photographed dry. Geological, geotechnical, structural, sampling and assay data were managed in a SQL server-hosted database. Logging was completed to a standard appropriate for Mineral Resource estimation, mining studies and metallurgical studies.

Diamond core was split using an automatic core saw. One half was submitted for assay and the other half was retained in labelled trays at the Olympic Dam core storage facility. Retention of the half core provides material for geological review and verification sampling, while the generally competent nature of the fresh core and non-friable sulphide mineralisation supports preservation of representative material in storage.

No dedicated twinned holes have been drilled. Wedge drilling, proximal or cross-cutting drilling, close to existing mineralisation shows some short-scale variations in the tenor of mineralisation. However, this close-spaced drilling provides correlation and general support for the geological and grade modelling.

The majority (>91%) of mineralised diamond core was sampled at the standard interval appropriate to the core diameter: predominantly 2 m and 1 m for NQ2 core, and 2.5 m for BQ/BQTK core. These interval lengths were selected to provide representative sample masses of approximately 4-8 kg and are supported by Olympic Dam site-specific sampling testwork and sample nomograms, which demonstrated that the intervals provide an appropriate balance between sample precision and practical sample-preparation requirements for the respective core sizes. Minor (<9%) historical samples were collected at 1 m or 5 m intervals; these data are retained and used subject to the applicable data validation, compositing and estimation controls.

Samples were submitted to an analytical laboratory for final drying, staged crushing to 2 mm, splitting to an approximately 2-3 kg portion and pulverisation to produce a pulp with 90% passing 75 µm. Duplicate samples were collected at each preparation stage where a reduction in sample mass occurred. Bulk dry density was measured on all assayed samples using the water-immersion method on core samples at the Olympic Dam core-processing facilities.

 

19


BHP | Operational review for the quarter ended 30 September 2026

 

The mineralisation is readily identifiable from alteration, brecciated textures and the presence of sulphides, and is relatively pervasive through the broader mineralised zones. Sample sizes and the sampling intervals are therefore considered appropriate for the style of mineralisation. Sampling, assay and quality-control methodologies have been established over several decades and are applied consistently across the relevant drilling methods.

4.2 Surveys

All surface drill hole collar locations (historic and recent) have been surveyed with Leica GS16 Rover and transferred to Olympic Dam’s acQuire database. Underground drill hole collar locations have been surveyed using Leica TS16 Total Station, or TS15 / TS14 prior to 2006. All drilling survey methods are considered appropriate for the estimation and mining of Olympic Dam.

Downhole surveying of surface diamond drilling was carried out at 18 m intervals using a REFLEX GYRO SPRINT-IQ™ tool using GYRO North Seeking (NS) single-shot mode. At the completion of each hole a continuous survey was taken from the collar to end of hole for comparison and quality control. Downhole surveying of underground diamond drilling was undertaken using REFLEX magnetic camera tools.

BHP applies robust quality assurance and quality control (QA/QC) standards and procedures to collar and downhole-survey data. Collar and downhole surveys are managed in the acQuire database through controlled imports, validation checks and review of survey type, grid and azimuth; downhole surveys are also assessed for compliance with the planned drillhole orientation. Validated, appropriately ranked survey data are exported for use in resource modelling, and sample locations are therefore considered suitable for Mineral Resource estimation.

The topography at Olympic Dam is relatively flat, and along with any mining excavations, has been surveyed by airborne LiDAR. The region has minimal vegetation and cover. Surface topographic model is considered appropriate for use in the resource model and mining of Olympic Dam.

4.3 Sample security

Core trays are transported by BHP contractors from the drill rigs to the core processing facility at Olympic Dam, Roxby Downs. Samples in calico bags are transported from Olympic Dam via road on trucks to the external laboratory Intertek, Adelaide, South Australia. Calico bag numbers are automatically generated. Intertek is informed of the sample number ranges for each pending shipment, and these are recorded in Intertek’s management system. Intertek use these to create barcode labels for geochemical bags used for storing the pulverised samples. On sample receipt, Intertek manually checks the submitted sample list against all samples in the shipment. Once the samples are pulverised, all further steps are tracked using the barcodes. BHP is informed of any discrepancies.

BHP has internal governance and standards related to sample security and data management. BHP undertakes routine verification of these practices.

4.4 Quality of assay data and laboratory tests

Samples were submitted to Intertek Group plc, Adelaide, and analysed using either the routine Olympic Dam multi-element suite or the expanded Olympic Dam multi-element suite, as detailed below. Intertek has ISO/IEC 17025 laboratory accreditation.

The routine suite includes Cu, Ag, Co, Ni, Pb, Zn (3-acid digest, measured via ICP-OES) and Li-borate fusion measured via ICP-OES/MS (Al, As, Ba, Bi, Ca, Ce, Cr, Fe, K, La, Mg, Mn, Mo, Na, P, Sb, Sc, Si, Sr, Ti, U, V, Y, Zr). The expanded suite includes 4-acid digest measured via ICP-OES/MS (Cu, Ni, Pb, Zn, Ag, As, Bi, Cd, Co, Ge, In, Li, Re, Se, Te, Tl) and Li-borate fusion measured via ICP-OES/MS (Al, As, Ba, Be, Bi, Ca, Ce, Cr, Cs, Dy, Er, Eu, Fe, Ga, Gd, Hf, Ho, K, La, Lu, Mg, Mn, Mo, Na, Nb, Nd, P, Pr, Rb, Sb, Sc, Si, Sm, Sn, Sr, Ta, Tb, Th, Ti, Tm, U, V, W, Y, Yb, Zr) and loss-on-ignition. All samples were assayed for Au via 25-g fire assay with ICP-OES finish, and C and S via induction furnace combustion, measured by infrared analyser.

Comparative analysis between the 4- and 3-acid digest methods demonstrates equal accuracy and precision within the Olympic Dam mineral system. The 4-acid digest was used to expand the geochemical suite of elements when initially characterising new parts of the deposit.

BHP maintains robust QA/QC standards and procedures for sampling and assay quality. All routine assay QA/QC samples were analysed by Intertek Adelaide, the external primary laboratory, including half-core field duplicates, coarse and pulp duplicates; Intertek also inserted matrix-matched certified reference materials and blanks at defined rates.

Quality-control samples comprised pulp duplicates at 3%, half-core field duplicates at 1% and Boyd crusher/coarse duplicates at 1%, equivalent to duplicates at a minimum rate of 1:20. Analytical blanks, including BHP supplied blanks and additional laboratory blanks, were inserted at a minimum rate of 1:50. Intertek manages and inserts both blank types, and BHP reviews performance internally and with Intertek on at least a monthly basis. Certified reference materials were inserted at a minimum rate of 1:25, with actual rates varying by analytical method.

 

20


BHP | Operational review for the quarter ended 30 September 2026

 

Quality control results were reviewed when received and all results were within acceptable accuracy and precision limits.

BHP has robust standards and procedures relating to data transfers (from laboratory to Olympic Dam’s acQuire database, and from database to user), with strictly monitored permission controls relating to reviewers, approvers and users of exported data. Data was electronically uploaded to Olympic Dam’s acQuire database as received from the external laboratory. All drill hole data was managed internally via a SQL server-hosted database with strict validation rules. Adjustments to the received assay data included; copper values converted from parts per million (ppm) to percent (%), and values that returned below the detection limit were assigned a value equal to half of the applicable detection limit: 0.001% and 0.0025% for Cu (3- and 4-acid digests, respectively), 0.5 ppm and 0.025 ppm for Ag (3- and 4-acid digests, respectively), 0.0025 ppm for Au, and 0.25 ppm for U3O8.

A full pulp library, as well as all unsampled reference half core, is retained at the Olympic Dam mine site. These samples are available for verification sampling, if required, due to stable storage in a low humidity desert environment. This is supplemented by core photography of all drilling.

Dr Francis Pitard reviewed Olympic Dam processing facilities, sampling stations and Intertek Laboratory in 2023 with no material observations. BHP routinely reviews standards, procedures and results from external laboratories. No issues have been noted from any BHP review.

4.5 Database management and security

Geological and geotechnical logging are collected via company digital logging tablets and loaded to Olympic Dam’s acQuire geological database. Geologists request sampling intervals through customised acQuire user interfaces. Entry of assay data was through the direct loading of laboratory assay files into the acQuire geological database.

Data validation steps included, but were not limited to the following:

 

•  

QAQC vetting of data by Intertek laboratory prior to transmission to BHP, followed by further QAQC vetting by BHP prior to acceptance into Olympic Dam’s acQuire database.

 

•  

Additional validation through constraints and libraries set in the database by the Database Manager (e.g. overlapping/missing intervals, intervals exceeding maximum depth, valid geology codes, missing assays, prioritised assay protocol).

 

•  

Post data-entry validation included secondary system checks and visualisation in 3D software to check for collar, survey or assay import errors.

4.6 Geophysical data

2D and pseudo 3D seismic data acquisition was undertaken in July 2022. In June-August 2023 BHP acquired 3D seismic data. 3D seismic data is used to inform known deposit scale structural continuity beyond drilling data.

4.7 Site visits

The Competent Person last visited the Olympic Dam mine in April 2026. The site visit included a review of drilling practices, drilling results and geology, and sampling and logging practices. While at the core processing site, checks included validation of sampling, density data collection, and sample and pulp storage.

5 Mineral Resource estimation

The first-time reporting of the underground block cave Mineral Resource at Olympic Dam is presented in Table 1.

The Olympic Dam Mineral Resource is based on:

 

•  

17,557 diamond drill holes (surface and underground drilling) comprising a total of 4,660,620 m of drilling. Of this, 4,067,581 m of the drilling has been sampled. A total of 2,613,301 m of the sampled drilling occurs within copper-sulphide domains.

 

•  

Sampling was predominantly 1 m or 2.5 m, together accounting for more than 85% of all samples.

 

•  

Nominal drill hole spacing ranges from 20 m to >300 m.

The Olympic Dam mineralised deposit is approximately six kilometres long and three kilometres wide and typically extends to depths of 900 m, and locally beyond 2,000 m beneath the surface. The mineralisation at Olympic Dam is open at depth in local areas.

 

21


BHP | Operational review for the quarter ended 30 September 2026

 

Deterministic geological models (wireframes) of the sulphide species are built in Leapfrog modelling software, using a combination of implicit geological modelling combined with local updates driven by geological sectional interpretation. Extensive peer reviews of the geological models are undertaken prior to use in resource estimation.

The confidence of the geological interpretation of the Olympic Dam mineral deposit is supported by a long history of diamond drilling, geological logging, assay results, underground mapping, and reconciliation of mined material and metal production. Confidence in the mineralised model is sufficient in areas declared as Mineral Resource, where mineralisation orientations are adequately constrained by data spacing and supported by lithological, alteration and structural modelling. Areas outside the declared Mineral Resource generally have lower confidence due to wider drill spacing, reduced geological confidence, or insufficient demonstrated mineralisation continuity at a scale relevant to potential underground mining methods, including both bulk and selective mining scenarios. Future drilling and studies may refine these interpretations.

The Mineral Resource estimation process included:

 

•  

Raw assay data composited to 5 m lengths, due to consideration of sampling, mineralisation style and mining method choices, with the relevant domains flagged after compositing.

 

•  

Statistical analysis of the composites within key mineralisation domains.

 

•  

Variography modelling on mineralisation, sulphide and orientation domains.

 

•  

Identification of outliers and application of high yield thresholds to the composites, determined by geostatistical domain analysis and calculated using a metal-at-risk approach.

 

•  

For the mineralised domains being reported, estimation of grade and density via either a combination of multiple-indicator kriging with ordinary kriging (MIK-OK) or ordinary kriging (OK) methods within estimation domains constrained by mineralisation through sulphide domains and orientation domains.

Estimation was undertaken using Vulcan mining software (version 2023.4). Drill hole information is exported from the acQuire database as ASCII format text files and imported into a Vulcan format drill hole dataset. No top-cutting is applied; extreme or outlier values are instead managed using the high yield thresholds described above, which are customised to each stope area domain.

The block model uses estimation supports approximate to drilling density and resource confidence. Measured blocks are estimated at 5 m X by 10 m Y by 5 m Z support, while Indicated and Inferred blocks are estimated at 30 m X by 30 m Y by 15 m Z support. The model is sub celled to a minimum of 2.5 m in each dimension to represent geological domain boundaries accurately.

The classified elements reported in the Mineral Resource are Cu, U3O8, Au and Ag. All four are estimated using the same MIK-OK methodology and the same variography approach described below, with the exception that Au and Ag are subject to an additional Indicator Kriging (IK) domaining step to account for the portion of Au and Ag mineralisation not contained within the sulphide domains. Dry bulk density is also estimated using this approach (see Section 5.5 Moisture and density). As Cu is the main economic element at Olympic Dam and MIK-OK is the predominant estimation method applied, the following discussion of variography modelling is framed in terms of Cu.

The MIK-OK methodology uses two estimation techniques: MIK and OK. The intent of the MIK technique is to divide the grade distribution into 20 domains (classes) using 19 strategic cut-offs. The spatial variability of grade within these 20 domains is modelled using three indicator variograms. The indicator cut-offs are calculated based on a mixture of metal abundance in each class, the number of sample composites within each class, and the overall shape of the grade distribution. Typically, the three cut-offs occur at 50%, 30% and 20%, respectively, of the available sample composites in the distribution, resulting in apportionment of the distribution into low, medium and high-grade variography components.

The OK component of the MIK-OK method uses the samples flagged against the MIK estimate to derive the final block grade. The spatial variability of the flagged samples is modelled using two variograms, which are based on a 50/50 split of the 20 MIK classes described above.

The resource estimation process has well established procedures, including peer reviews, that govern geological interpretation, resource estimation and reporting of Mineral Resources. Documentation is stored electronically in a secure centralised location. These documents contain information on deposit geology, geometry, detailed geological and geostatistical modelling, data preparation including compositing, and classification parameters.

The classified elements reported in deeper domains (known as Olympic Dam Deeps), which run along the base of the deposit, are estimated using OK.

A large number of other unclassified elements are estimated in various ways for use in assessment of economic elements, gangue elements, and gangue minerals that may impact processing.

 

22


BHP | Operational review for the quarter ended 30 September 2026

 

Validation of the Mineral Resource estimate has been conducted in several ways, including but not limited to, visual drill hole section and plan data comparison with the block model and various statistical and swath plot comparisons by domain and element.

Olympic Dam has a long history of mining and processing and reconciliation with production data provides confidence in Resource determination.

5.1 Cut-off parameters

A cut-off grade was chosen to reflect reasonable prospects for economic extraction assuming a bulk underground mining method such as block caving. For the block cave Mineral Resource, this was a cut-off greater than or equal to 0.35% Cu for any selective mining unit (see Mining Factors), which was based on internal benchmarking studies combined with potential economic modelling. This cut-off was used to filter potentially economic blocks from potentially sub-economic blocks, where any material within the retained selective mining unit (SMU) was deemed to have reasonable prospects of eventual economic extraction. As such, zero grade material (in-situ waste material or current or assumed future sub-level open stopes backfill) was included as internal dilution to account for the non-selective nature of block caving.

For the UG Sulphide (SLOS), the cutoff grade used was variable between 0.6% Cu and 1% Cu. There has been no change to the SLOS Mineral Resource from that reported in the BHP FY26 Annual Report (www.bhp.com).

5.2 Mining factors

The total Olympic Dam Mineral Resource assumes both selective SLOS method and a bulk underground mining method such as block caving. The UG Sulphide (SLOS) and UG Sulphide Block Cave (BC) Mineral Resources together account for the majority of the shallower mineralisation. The remaining mineralisation is insufficient to warrant ongoing separate reporting of an Open Cut (OC) Mineral Resource and has been removed.

It is assumed that the SLOS Mineral Resource would be extracted prior to block caving (with zero grade backfill material replacing mineralisation). Future mining studies are required and may determine that some areas of the deposit are more economically amenable to block caving without extraction of the selective SLOS Mineral Resource component, in which case, some of the SLOS Mineral Resource may convert to block cave Mineral Resource in future.

A maximum depth threshold of -1,500 m from surface level (~-1400 mRL) for block caving was applied to the BC Mineral Resource. This threshold was applied based on benchmarking of deposits of similar style and tenor to account for modifying factors, such as economic and geotechnical factors relating to the reasonable prospects for economic extraction of deep block cave mining. Beyond this depth there are uncertainties on management of geotechnical conditions, heat and ventilation. Future mining studies may refine these assumptions and considerations. No depth constraint exists for reporting of the SLOS Mineral Resource.

For the block caving Smallest Mining Unit (SMU) and potential feasibility, minimum mining widths and heights were considered. This included an assessment of grade continuity, relative to potential SMU sizes, to quantitatively demonstrate the degree of spatial consistency in mineral grade distribution. The assessment utilised a model regularised to 100 m X by 100 m Y by 200 m Z, where SMU selection required a minimum of three connected blocks in the XY plane, all of which needed to be above the nominal economic cutoff. This criterion was informed by technical studies, internal analysis, and consultation with mining engineers and caving specialists.

The presence of current or future backfill (such as rockfill, concrete aggregate fill or paste fill) in any future cave design could present a risk of mud rush (wet or dry), poor cave propagation, breakages or particle comminution. This material may act like other in-situ fine geological units (e.g. overburden) or may have variable properties dependent on backfill formulation. Backfill material could also act differently under varied seismic or stress conditions. The Competent Person assumes that prior to any future mining, sufficient mining controls relating to managing mud rush risks, geotechnical risks, grade variability (of economic and any potential deleterious elements) would be established to manage and maintain safe working and extraction practices.

There is no assumption related to potential concurrent caving, cave induced seismicity or seismic interaction, or distance buffers required for concurrent SLOS mining. The Competent Person assumes that any future caving would have optimisation on spatial or temporal mining sequences, with controls established prior to, during, or post-extraction of caved areas.

The Competent Person assumes that block caving, or other bulk underground mining methods, could occur in the presence of backfill material. No assumption has been made regarding the impact of non-homogeneous cave flow on the distribution or forecasting of economic or deleterious elements or materials. Prior to any consideration of conversion to Ore Reserves, future studies are required to understand practical constraints, or absolute limits, of either geotechnical, metallurgical, or other modifying factors. Due to the uncertainty of caving where there might be a significant portion of backfill, a nominal limit of ≥50% backfill, from current or future SLOS mining, is used to constrain resource classification to Inferred.

 

23


BHP | Operational review for the quarter ended 30 September 2026

 

It is expected that future studies and additional information will continue to refine the Mineral Resource as it relates to modifying factors.

There is no assumption that all or any part of the block cave Mineral Resource would convert to Ore Reserves with further mining studies required.

5.3 Metallurgical factors

The declared Mineral Resource reports on a 100% basis and does not account for metallurgical recovery. No assumptions have been made regarding recovery of by-products other than those reported, and no deleterious elements have been factored into the reported Mineral Resource.

The declaration of Mineral Resource assumes that any future caving material that include backfill material (such as rockfill, concrete aggregate fill, paste fill) would be supported by suitable processing studies and blending strategies.

The block cave mineral resource assumes metallurgical recoveries similar to current SLOS recoveries. Future studies are required prior to any conversion to Ore Reserve.

5.4 Environmental factors

The Olympic Dam mine is currently in operation. It is assumed that there would be sufficient data and studies on any impacts of block caving in terms of surface disturbance, and appropriate waste, water, material disposal and management options, prior to commencement of a new mining method. It also assumes there are reasonable prospects of obtaining all necessary permits and approvals prior to commencement of a new mining method.

5.5 Moisture and density

Tonnages are estimated on a dry basis using dry bulk density data collected for every sampled interval of drill holes and domained in accordance with the copper mineralisation.

Bulk density measurements were collected on all assayed samples using the water immersion method from core samples at the Olympic Dam core processing facilities. The majority of fresh Olympic Dam core has very low porosity and negligible moisture content; therefore, no moisture correction is applied. The estimation of density is performed using an approach similar to that used for Cu (MIK-OK or OK).

6 Mineral Resource statement

6.1 Classification

A range of criteria was considered in determining the block cave Mineral Resource classification, including:

 

•  

Drill hole and data density (i.e. informing samples).

 

•  

Sample and assay confidence.

 

•  

Geological interpretation confidence and, similarly, geological continuity.

 

•  

Grade continuity within mineralisation.

 

•  

Estimation performance through validation.

 

•  

Reasonable prospects for eventual economic extraction.

 

•  

Mining method with appropriate modifying factors.

Comparison to the SLOS Mineral Resource is provided for context where appropriate. There has been no change to the SLOS Mineral Resource from that reported in the BHP FY26 Annual Report (www.bhp.com).

Determination of the classification category relating to geological confidence was undertaken using geological confidence shells (wireframes). These shells were created as follows:

 

•  

Regular grids, at spacings corresponding to desired confidence, were created using RMSP software (Python mining software). Grid spacings were increased according to confidence levels.

 

•  

At each grid point, a search was conducted using radii which correspond to twice the grid spacing to count the number of drill holes within that volume. Doubling the grid spacing ensures that the search volume around each grid centroid covers the entire area of influence for that cell and its immediate neighbours.

 

•  

Boundaries were generated where the drill hole density transitions between classification thresholds, creating 3D shells which reflect increasing classification confidence. These shells were manually calibrated in Leapfrog Geo (2023.3) with the current drilling database to resolve any artefacts and ensure that drilling confidence levels matched expectations. The following table provides a summary of parameters used in creating geological confidence shells (Table 3) and corresponding nominal drill spacings.

 

24


BHP | Operational review for the quarter ended 30 September 2026

 

Table 3. Summary of spacing requirements for geological confidence for the Olympic Dam block cave classification

 

         

 Block cave Resource

 Classification

 

Sample drill hole

search radius (m)

 

Grid cell size

(m)

 

Required

drill holes

 

Nominal spacing 

(m) 

 Measured

  60 m   30   4   <80 m 

 Indicated

  120 m   60   3   80 m to 180 m 

 Inferred

  180 m   90   2   180 m to 300 m 

For comparison, the nominal drilling density applied for SLOS Mineral Resource classification are 20 m to 35 m for Measured, 35 m to 70 m for Indicated and 70 m to 200 m for Inferred.

Additional requirements for classifying of the block cave Mineral Resource includes:

 

•  

Minimum SMU comprising three connected 100 m by 100 m regularised blocks in the XY plane, with a vertical minimum of 200 m in Z.

 

•  

Maximum depth of ~1,500 m from surface (~-1400 mRL).

 

•  

Grade cut-off greater than or equal to 0.35% Cu for any SMU.

 

•  

Classification limit of Inferred for any SMU with ≥50% backfill (current or future).

The classification is considered appropriate by the Competent Person.

6.2 Relative accuracy / confidence

Olympic Dam has a significant history of SLOS mining and has available production data for comparative purposes which does not highlight any material issues. Relative accuracy and confidence have been assessed through validation of the model outlined above.

The Mineral Resource estimate comprises material categorised as Measured, Indicated or Inferred Mineral Resource. These categories reflect the accuracy and confidence as a global estimate.

Further drilling and mining studies will most likely result in changes to both the Mineral Resource and future mine plans at Olympic Dam.

The Competent Person considers the classification approach and methodologies applied are appropriate for this deposit.

7 Independent review

A review of the Mineral Resource estimate was undertaken by AMC Consultants in 2024. A review of the resource classification regarding block cave was completed by AMC Consultants in 2026.

In the Competent Person’s opinion, there are no outstanding issues arising from these reviews that are not being addressed within the Mineral Resource report’s recommendations or included in assumptions outlined in this document.

8 Future work

Further drilling may be undertaken to test the lateral and depth extent of mineralisation and improve confidence in grade continuity. Further studies are required to assess modifying factors related to the potential application of block caving. These may include mine design and sequencing, geotechnical conditions, backfill interaction, seismicity, heat and ventilation, and associated economic parameters.

9 Estimation and Reporting of Ore Reserves

The mine plan for the Olympic Dam Ore Reserves is underpinned by a Life of Mine plan prepared in accordance with BHP requirements. There has been no change to the Ore Reserves from those reported in the BHP FY26 Annual Report (www.bhp.com). The following information relates to the reporting of SLOS Ore Reserves. The newly reported Block Cave Mineral Resource has not been converted to Ore Reserve. Study work is currently in progress to assess the mining method and underlying factors.

 

25


BHP | Operational review for the quarter ended 30 September 2026

 

9.1 Assumptions

9.1.1 Mineral Resources estimate for conversion to Ore Reserves

The relevant resource block model has been used as the basis for mine planning and conversion to Ore Reserves. The reported SLOS Mineral Resources are inclusive of Ore Reserves.

The Ore Reserve converts Measured Mineral Resource to Proved Ore Reserve and Indicated Mineral Resource to Probable Ore Reserve, with the exception of low-grade stockpiles where the Measured Mineral Resource converts to Probable Ore Reserve.

9.1.2 Site visits

The Ore Reserve Competent Person has worked on site for four years and acquired direct operational knowledge of Olympic Dam. There has been continuous involvement with site teams with the most recent site visit undertaken in June 2025 to visit new underground workings and assess Critical controls.

9.1.3 Study status

Olympic Dam has been in continuous production since 1988 and prepares an annual Life of Mine plan that supports the Ore Reserve estimate. The modifying factors underpinning the Ore Reserves have been assessed to an appropriate level of confidence for an operation with a long life of mine. Projects in later stages of the mine plan will continue to be refined through future studies and optimisation. These projects do not materially impact the confidence in the Ore Reserve estimate.

9.1.4 Cut-off parameters

Olympic dam applies a variable cut-off grade strategy that is informed by a study. Ore reserves are estimated at a cut-off grade of 1.0-1.7% Cu for UG Sulphide and ≥ 0.6% Cu for Low grade. UG Sulphide includes ore from stopes and development, while low-grade and waste is the material from development.

Mining block-specific cut-off grades exploit the unique geological properties of each block to produce a relatively consistent ore feed. This seeks to maximise throughput through a series of surface processing stages. This strategy enables high-grade material to be targeted in early years of the mine plan. Lower grade material is then exploited as higher-grade material is depleted.

Price and cost assumptions are used to support a variable cut-off. Operating costs are inclusive of mining, surface processing, general and administration, closure, marketing and royalties.

9.1.5 Mining factors

The mining method selected at Olympic Dam is underground SLOS with cemented aggregate backfill. Paste fill has also been identified as an alternative backfill strategy, with a paste plant currently under execution. The stopes are sequentially extracted and progressively backfilled to control maximum excavation spans and manage stresses in the rock mass.

The conversion of Mineral Resource to Ore Reserve is achieved by creating stope shapes using manual (engineered stopes) and automated techniques (Stope Optimiser tools). These stopes are incorporated into a mine schedule and sequenced considering geotechnical parameters and ventilation constraints, and operating parameters.

Detailed development and stope designs are generated with mine block specific cut-off grades and schedules are prepared considering respective mine block constraints.

The nominal stope mining dimension is 30 m by 30 m in plan, with stope heights varying according to geotechnical parameters and ground conditions. Stope widths range from 15 m to 30 m to accommodate irregular orebody geometries. The development dimensions and profiles vary for different applications but are typically in the ranges of 5 m by 5 m to 7 m by 7 m.

Overbreak (OB) and underbreak (UB) factors that inform dilution and recovery are reviewed annually and updated as necessary. Modifying factors are informed through reconciliation of site performance. They are applied by mine area to reflect localised geotechnical conditions. Typical planned factors are; UB tonnage factor: 5-11%, OB tonnage factor: 9-28%, OB grade factor: 47-77%. The wide range of factors reflects area-specific geotechnical and mining conditions across the operation. The use of these factors enhances the accuracy and confidence of the Ore Reserve estimate.

The mine plan includes a new material handling system with new underground crusher and conveyor to surface, supported by appropriate ventilation raises to deliver production profile.

Inferred Mineral Resources were considered in the Life of Mine schedule but are not included in the Ore Reserve estimate. To assess the impact of Inferred Mineral Resources, revenue attributable to Inferred Resources was removed from the valuation model while all associated costs were retained. The resulting valuation generated a positive NPV, demonstrating that the Ore Reserve remains economically viable without the contribution of Inferred Resources.

 

26


BHP | Operational review for the quarter ended 30 September 2026

 

9.1.6 Metallurgical factors

The Olympic Dam metallurgical process is well established and has been in operation since mining commenced in 1988. The integrated processing plant produces copper cathode, uranium oxide, and gold and silver bullion, while removing deleterious elements at various stages of the process.

A comprehensive geometallurgical program tests ore from both existing and new mine areas, with results calibrated against operating plant performance. Hundreds of samples are collected and tested every year based on the mine areas identified in medium and long-term mine plans. These samples are combined into monthly composite samples and assessed using the same characterisation procedures. Metallurgical recovery factors applied in the mine plan are based on this data and planned operating conditions for the plant.

Average metallurgical recoveries applied in the Ore Reserve estimate are 94% for Cu, 65% for U3O8, 71% for Au, and 63% for Ag. Recovery assumptions are based on a combination of operating performance and geometallurgical test work.

9.1.7 Environmental

Environmental performance is managed through a comprehensive Environmental Protection and Management Program (EPMP), approved by both the Commonwealth and South Australian governments. Required under the Roxby Downs (Indenture Ratification) Act 1982 (SA) and associated project approval conditions. The EPMP provides the framework for managing environmental impacts from operations. It is reviewed and approved annually by the South Australian Minister for Energy and Mining, including a reassessment of operational activities, environmental aspects, and associated impacts. All material governmental approvals, licences and permits required for current Ore Reserve extraction are in place or expected to be renewed in the ordinary course of operations. There are no known environmental issues that materially affect extraction of the declared Ore Reserves.

The closure plan is reviewed regularly and updated to reflect changes as the operation has a long life and will be subject to change over the remaining life of the asset. Appropriate uncertainty has been built into the closure cost estimate.

In the current closure plan, Tailings Storage Facility (TSF) and EP (Evaporation Ponds) are planned to be progressively rehabilitated during operations, and redundant infrastructure will be demolished when practicable. Given the underground nature of Olympic Dam, most other major closure activities (e.g., the closure of operational TSF and EP, infrastructure and general land rehabilitation) are scheduled to commence at the end of life. Active closure is planned to take three years, and a 20-year post-closure monitoring and maintenance period is planned.

9.1.8 Social factors

The Roxby Downs (Indenture Ratification) Act 1982 (SA) provides statutory authority for an agreement (Indenture) between BHP and the State of South Australia. Refer to Section 2 Mineral tenement and land tenure for further details.

The Olympic Dam operation has been subject to multiple Environmental Impact Statement (EIS) assessments under three separate South Australian and Commonwealth processes since commencement of operations in 1988. All phases considered expansion of operations over time and support current operations and Ore Reserves.

Olympic Dam also holds a range of statutory approvals, licences, permits, exemptions, registrations, certifications, memberships and leases that enable Olympic Dam operations and are logged in Olympic Dam’s Integrated Management System.

BHP has a suite of policies and procedures in place that ensure appropriate consideration and management of any potential community or human rights impacts of its operations, capital projects and investment decisions (both positive and negative) in line with public commitments set out in BHP’s Human Rights Policy Statement and Indigenous Peoples Policy Statement.

9.1.9 Infrastructure

The Olympic Dam mine has been in production for more than 35 years. Production commenced in the northern portion of the orebody and subsequently expanded south, which underpins a significant part of the Ore Reserves.

The underground mine plan incorporates incremental extension of the truck haulage network to facilitate production from new mine areas. A new material handling system, including conveyors to surface, ore passes, and haulage corridors, is planned to enable material movement from new mine areas.

Underground and surface ventilation raises, supported by refrigeration for deeper mine areas, are incorporated in the mine plan to facilitate access to new mine areas.

Current operations utilise Cemented Aggregate Fill method to backfill stopes. Paste Fill has been selected as an alternative backfill method to support production in existing and future mining areas. Construction of the paste fill plant and associated infrastructure supporting the Ore Reserves is in execution.

 

27


BHP | Operational review for the quarter ended 30 September 2026

 

Surface processing facilities are in place and capital allocation for planned processing infrastructure upgrades has been incorporated into the Life of Mine plan.

10 Market and commodity price assumptions

10.1 Cost factors

Capital costs for new infrastructure are derived from the Life of Mine plan and informed by relevant historical costs and study work where appropriate. Major capital provisions include significant smelter shutdowns occurring every 6 to 10 years, and planned transition from single stage smelter configuration to twin stage. Capital estimated includes progressive rehabilitation activities and final closure costs consistent with ongoing closure planning. Sustaining capital estimates are based on extensive study work and long-term asset integrity programs targeting reliability of operations.

Operating cost estimates are derived from first principle models for mining, processing and General and Administrative costs informed by historical operating performance, budget forecasts and life of mine planning assumptions.

Transport, marketing and other off-site costs are incorporated in cost estimations. As Olympic Dam produces final metal products on site, all treatment costs and refining costs are based on current performance. Government royalties and applicable taxes have been incorporated into the economic evaluation.

10.2 Revenue factors

Revenue is calculated by applying forecast commodity prices and foreign exchange rates to the planned production in period, with production estimates reflecting the applicable metallurgical recovery assumptions. Forecast commodity prices (copper, uranium, gold and silver) and foreign exchange rates are determined in accordance with BHP protocols and are used as inputs to the valuation model.

Ore Reserves are based on the Life of Mine plan and use latest BHP forecast commodity prices forecasts for revenue projection.

The commodity price protocols and the process that establishes them is commercially sensitive and is not disclosed in this report.

10.3 Market assessment

Olympic Dam is a polymetallic deposit that produces copper cathode, uranium oxide concentrate, and gold and silver bullion. These products are sold to various domestic and international markets.

Future copper demand growth is expected to be underpinned by development in emerging economies as they electrify, industrialise, and urbanise. The global energy transition provides further upside, as copper is widely used in electric vehicles and renewable energy infrastructure.

Currently, the copper market is broadly balanced; however, demand is expected to exceed committed supply in the coming years, requiring new supply to come to market.

Nuclear power generation, and associated uranium demand, are expected to grow in the future, requiring new sources of supply.

Unlike most industrial metals, gold and silver prices are influenced not only by physical supply-demand balances but also by investment flows, monetary conditions, and safe-haven demand.

10.4 Economics

A valuation model has been developed for the purposes of supporting the Ore Reserves. All revenue and economic assumptions are as described within other sections of this table. Calculation of the net present value (NPV) was conducted using a discount rate, estimated inflation and tax rates adhering to BHP protocols.

Sensitivity analysis was conducted on the mine plan using a range of prices, exchange rates and costs, demonstrating a positive NPV across all sensitivities.

Inferred Mineral Resources were allowed to contribute to the mine schedule but are not included in the Ore Reserves estimate. Sensitivity analysis was also conducted on the mine plan by removing revenue attributable to Inferred Resources while retaining all associated costs. The analysis demonstrates that Inferred Resources make a minor contribution and that the NPV remains positive following its removal.

 

28


BHP | Operational review for the quarter ended 30 September 2026

 

11 Ore Reserve statement

There have been no changes to Ore Reserves since those reported in BHP’s FY26 Annual Report. The Ore Reserve estimate is supported by a Life of Mine plan, operating performance, modifying factors and assumptions previously disclosed.

11.1 Classification

The Ore Reserve classification is supported by the SLOS Mineral Resource classification. Measured Mineral Resources are converted to Proved Ore Reserves and Indicated Mineral Resources are converted to Probable Ore Reserves, except for low-grade development material, where Measured Mineral Resources are converted to Probable Ore Reserves. The low-grade material mined at a cut-off grade of 0.6% Cu will be stockpiled to process towards end of life of mine. Other than low-grade stockpiles, no Probable Ore Reserves have been derived from Measured Mineral Resources.

11.2 Discussion of relative accuracy/confidence

The relative accuracy and therefore confidence in the Ore Reserves estimate is deemed appropriate for its intended purpose of global Ore Reserves reporting. The application of modifying factors affecting the accuracy and confidence as stated in Section 9 Estimation and reporting of Ore Reserves are taken into consideration during classification of the model and are therefore addressed by the Competent Person in the attributed Reserve classification.

Confidence in the Ore Reserve estimate is supported by ongoing production reconciliation, operational performance and validation of modifying factors through established mining operations. In the Competent Person’s opinion, there is appropriate confidence in the modifying factors to support the Olympic Dam Ore Reserve estimate.

11.3 Ore Reserves declared

Table 2 presents the statement of Ore Reserves for Olympic Dam and is unchanged from that reported in BHP’s FY26 Annual Report (www.bhp.com).

12 Reconciliation

Confidence in the Ore Reserve is supported through reconciliation against production data. Annual reconciliation results are considered more representative than shorter reporting periods due to timing differences associated with ore movement through stockpiles and processing facilities. Reconciliation performance provides confidence in the modifying factors and assumptions applied in the Ore Reserve estimate.

13 Independent review

AMC Consultants conducted independent reviews of the 2019 and 2020 Ore Reserve processes and estimates, which informed the FY2021 Ore Reserves. All actions were closed in 2021, with no further findings for Olympic Dam. Since completion of external reviews, there have been no material changes to the ore reserve estimates that would warranted external independent review. BHP’s internal annual assurance program further ensures that any significant risks, assumptions and controls relevant to Ore Reserve estimate are adequately managed.

14 References

Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC), 2012. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

BHP Quarterly Activities Report, 18th Jan 2024 “Operational review for the half year ended 31 December 2023”. Appendix 3, Project status update – Olympic Dam “Deeps” (OD Deeps). www.bhp.com

 

29


BHP | Operational review for the quarter ended 30 September 2026

 

Variance analysis relates to the relative performance of BHP and/or its operations during the three months ended September 2026 compared with the three months ended September 2025, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100% basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis. Numbers presented may not add up precisely to the totals provided due to rounding. Medium term refers to a five-year time horizon, unless otherwise noted.

The following abbreviations may have been used throughout this release: silver (Ag); gold (Au); billion dollars (B/bn); billion troy ounces (Boz); billion tonnes (Bt); cost and freight (CFR); cost, insurance and freight (CIF); carbon dioxide equivalent (CO2-e); compound annual growth rate (CAGR); copper (Cu); copper equivalent (CuEq); dry metric tonne (dmt); final investment decision (FID); free on board (FOB); foreign exchange (FX); greenhouse gas (GHG); grams per tonne (g/t); high-potential injury (HPI); joint venture (JV); kilograms per tonne (kg/t); kilometre (km); megalitres/million litres (ML); Memorandum of Understanding (MOU); million troy ounces (Moz); million ounces per annum (Mozpa); million pounds (Mlb); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); million dollars (M); thousand ounces (koz); thousand ounces per annum (kozpa); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); total recordable injury frequency (TRIF); uranium (U); wet metric tonnes (wmt) and year-to-date (YTD).

In this release, the terms ‘BHP’, the ‘Group’, ‘BHP Group’, ‘we’, ‘us’, ‘our’ and ‘ourselves’ are used to refer to BHP Group Limited and, except where the context otherwise requires, our subsidiaries. Refer to Note 28 – Subsidiaries of the Financial Statements in the BHP Annual Report 2026 for a list of our significant subsidiaries. Those terms do not include non-operated assets. Notwithstanding that this release may include production, financial and other information from non-operated assets, non-operated assets are not included in the BHP Group and, as a result, statements regarding our operations, assets and values apply only to our operated assets unless stated otherwise. Our non-operated assets include Antamina, Resolution, Samarco and Vicuña. BHP Group cautions against undue reliance on any forward-looking statement or guidance in this release. These forward-looking statements are based on information available as at the date of this release and are not guarantees or predictions of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control and which may cause actual results to differ materially from those expressed in the statements contained in this release.

Further information on BHP can be found at bhp.com

Authorised for lodgement by:

Stefanie Wilkinson

Group Company Secretary

 

Media Relations     Investor Relations
Email: media.relations@bhp.com     Email: investor.relations@bhp.com
Australia and Asia     Australia and Asia

Gabrielle Notley

+61 411 071 715

   

John-Paul Santamaria

+61 499 006 018

Europe, Middle East and Africa     Europe, Middle East and Africa

Sinead Keller

+44 7816826 169

   

Adam Sanderson

+44 7884 735 515

Americas     Americas

Renata Fernandez

+56 9 8229 5357

   

Li Hua

+1 647 828 9830

BHP Group Limited ABN 49 004 028 077

LEI WZE1WSENV6JSZFK0JC28

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

BHP Group is headquartered in Australia

Follow us on social media

 

LOGO

 

30


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

       

BHP Group Limited

Date: October 20, 2026      

By:

 

/s/ Stefanie Wilkinson

     

Name:

 

Stefanie Wilkinson

     

Title:

 

Group General Counsel and Group Company Secretary