Marathon Petroleum Company LP By: MPC Investment LLC, its General Partner | Hardin Street Marine LLC | |||
By: | /s/ Rick Hessling | By: | /s/ Shawn Lyon | |
Name: | Rick Hessling | Name: | Shawn Lyon | |
Title: | Chief Commercial Officer | Title: | President | |
Date | Calculation |
1/1/2027 | The rate currently in force will be adjusted upward two (2) percentage points |
1/1/2028 | The rate currently in force will be adjusted upward two (2) percentage points |
1/1/2029 | The rate currently in force will be adjusted to reflect then-current market rates. |
1/1/2030 | The rate currently in force will be adjusted upward two (2) percentage points |
l/1/2031 | The rate currently in force will be adjusted upward two (2) percentage points |
1/1/2032 | The rate currently in force will be adjusted to reflect then-current market rates. |
1/1/2033 | The rate currently in force will be adjusted upward two (2) percentage points |
1/1/2034 | The rate currently in force will be adjusted upward two (2) percentage points |
Equipment Category | Day Rate |
Cl Barge Clean Small | $1,213 |
C2 Barge Clean 10K | $1,006 |
C3 Barge Clean 30K | $2,110 |
H3 Barge Heater 30K | $2,408 |
B1 Boat 1000-1999 HP | $6,094 |
B2 Boat 2000-2999 HP | $6,880 |
B3 Boat 3000-3999 HP | $8,637 |
B4 Boat 4000-4999 HP | $10,402 |
B5 Boat 6000-6999 HP | $13,225 |
Fleeting Services Mooring services for barges | Subject to Section 4.3: 2026: 223 spaces* at a rate of $170.85 per day per space |
Tankerman Services U.S. Coast Guard licensed tankerman services for assurance of safe transfer of refined, chemical and liquefied gas cargoes. | Billed in aggregate monthly at hourly rates for each barge transfer, plus overtime rates for time in excess of eight hours, as listed on Exhibit G, plus mileage for travel by a tankerman in a personally owned vehicle at the Internal Revenue Service published standard mileage rate when traveling between work sites, or when called from home to report for tankerman duties. |
Cleaning and Repair Facility Charges Cleaning of Cargo tanks, voids, boat bilges and fuel/slop tanks. This includes labor, materials, and services. Other routine repair and maintenance services at MPC facilities, including, but not limited to: labor and materials for welding, electrical, mechanical, and hose and pipe testing. | Billed in aggregate monthly at the rates shown in Exhibit H - HSM Marine Repair Facility Schedule of Rates for the number of hours required for each service. Labor is billed hourly; materials and supplies shall be billed at cost plus thirty percent; third-party equipment rentals/ contractor billed at cost plus fifteen percent. |
Equipment Category | Quantity |
Cl Barge Clean Small | 24 |
C2 Barge Clean 10K | 15 |
C3 Barge Clean 30K | 231 |
H3 Barge Heater 30K | 48 |
B1 Boat 1000-1999 HP | 2 |
B2 Boat 2000-2999 HP | 7 |
B3 Boat 3000-3999 HP | 8 |
B4 Boat 4000-4999 HP | 11 |
B5 Boat 6000-6999 HP | 1 |


Towboat Group Mechanical= | (365+90+184+245) - (31+0+0+5) - (15+0+0+10) - (10+7+6+0) | = 94.34% |
Availability | (365+90+184+245) -(31+0+0+5) |





Note: For 2027 and after, the rate published herein will be adjusted pursuant to Section 4.3 and Exhibit A. | Base Rate | OT Rate | |
Jan 1, 2026- Dec. 31, 2026 | Jan 1, 2026- Dec. 31, 2026 | ||
Zone 1 | Pittsburg Region (MM OH 1-49) Allegany River Monongahela River | $89.00 | $135.23 |
Zone 2 | Marietta Region (MM OH 49-286) Kanawha River | $91.34 | $135.13 |
Zone 3 | Kanawha, Catlettsburg, North Bend (MM OH 66-495) | $87.00 | $129.63 |
Zone 4 | North Bend- Owensboro (MM OH 495-758) | $84.58 | $116.43 |
Zone 5 | Owensboro- Cairo (MM OH 758-981) (5A) Cumberland River (5B) Tennessee River (5B) | $82.58 $82.58 | $112.93 $112.93 |
Zone 6 | Memphis Region (MM LM 729-732) | $90.50 | $139.20 |
Zone 7 | Wood River Region (MM LM 732- UM 198) Illinois River | $96.75 | $121.50 |
Zone 8 | Garyville Region (8A) Houston Region (8B) | $80.88 $81.48 | $117.76 $118.36 |