a. | Exhibit A attached to the Agreement is hereby deleted in its entirety and replaced with the revised Exhibit A attached hereto as Attachment 1. |
b. | Section II (Table of Incremental Capital Fees) of Exhibit B-2 attached to the Agreement is hereby deleted in its entirety and replaced with the revised Section II (Table of Incremental Capital Fees) attached hereto as Attachment 2. In accordance with Section 4.2(b) of the Agreement, the Parties have agreed to an Incremental Capital Project in respect of the new Receipt Point identified in Section II of Exhibit B-2 (the “West Run – Hopewell Ridge Receipt Point”), which is separate from the |
i. | this Incremental Capital Project shall not trigger an increase in the Compression MDQ or the Contract MDQ or an extension of any Term under the Agreement; |
c. | In Section III (Site Specific Data and Facility Responsibility Matrix) of Exhibit F attached to the Agreement: |
i. | the pages including Section III.A.1 (Receipt Point Interconnect Data) is hereby deleted in their entirety and replaced with the revised pages including Section III.A.1 (Receipt Point Interconnect Data) attached hereto as Attachment 3; and |
EQT PRODUCTION COMPANY | EQM GATHERING OPCO, LLC |
By: /s/ David Schlosser__________ | By: /s/ Jeremiah J. Ashcroft_______ |
Name: David Schlosser____________ | Name: Jeremiah J. Ashcroft__________ |
Title: President__________________ | Title: President___________________ |
EQT ENERGY, LLC | |
By: /s/ Donald M. Jenkins_________ | |
Name: Donald M. Jenkins____________ | |
Title: President____________________ | |
Receipt Point(s) | Receipt Point MDQ MMcf/Day | Zone | Zone MDQ MMcf/Day |
West Run | 80 | Zone 1 | 300 |
Koloski | 90 | Zone 1 | 300 |
Green Hill | 80 | Zone 1 | 300 |
Pierce | 100 | Zone 1 | 300 |
Walker B | 30 | Zone 1 | 300 |
Moore | 40 | Zone 1 | 300 |
Phillips | 30 | Zone 1 | 300 |
Scotts Run | 30 | Zone 1 | 300 |
Patterson Creek | 60 | Zone 1 | 300 |
Carpenter | 120 | Zone 1 | 300 |
Moninger | 200 | Zone 2 | 370 |
Cooper | 140 | Zone 2 | 370 |
Big Sky | 75 | Zone 2 | 370 |
Harris | 45 | Zone 2 | 370 |
Amity | 15 | Zone 2 | 370 |
Harden Farm | 110 | Zone 2 | 370 |
Connors | 65 | Zone 2 | 370 |
Pettit | 65 | Zone 2 | 370 |
Hughes | 55 | Zone 2 | 370 |
Roberts | 9 | Zone 2 | 370 |
Harden | 25 | Zone 2 | 370 |
Shipman | 37.5 | Zone 2 | 370 |
J&J | 37.5 | Zone 2 | 370 |
Lacko | 150 | Zone 3 | 370 |
Hildebrand | 35 | Zone 3 | 370 |
Pyles | 40 | Zone 3 | 370 |
Beazer | 50 | Zone 3 | 370 |
Yabolnski | 70 | Zone 3 | 370 |
Minor | 60 | Zone 3 | 370 |
Nicoloff | 30 | Zone 3 | 370 |
McMillan | 20 | Zone 3 | 370 |
Robinson | 20 | Zone 3 | 370 |
Thompson | 25 | Zone 3 | 370 |
Thistlewaite | 2 | Zone 3 | 370 |
Alpha | 80 | Zone 3 | 370 |
Strope | 100 | Zone 3 | 370 |
West Run - Hopewell Ridge | N/A | N/A | N/A |
Delivery Point(s) | Location |
Ingram | Equitrans H-109 |
Amity | Equitrans H-125 |
Jupiter | Equitrans H-148 |
Callisto | Equitrans H-160 |
Hopewell Ridge | Equitrans H-160 |
Pipers Ridge | Equitrans M-78 |
Europa | Equitrans H-165 |
Io | Equitrans H-148 and M-78 |
Drip Liquids Delivery Point(s) | Location |
Not applicable | |
Contract MDQ: | 792,000 Dth / Day |
Compression MDQ: | 792,000 Dth / Day |
Incremental Capital Project | Contract MDQ | Incremental Capital Fee | In-Service Date | Applicable Expansion Term |
West Run – Hopewell Ridge Receipt Point (5100053) | [***] | Volumetric fee of [***] | [***] | Until [***], and thereafter until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
A. | In addition to the minimum design specification and operating parameters set forth in the Engineering and Technical Design Standards, the following specifications shall be followed: |
1. | Receipt Point Interconnect Data: The table below provides for the list of meters covered under this Agreement which may be updated from time to time in accordance with the terms and conditions of this Agreement. Each meter in the Receipt Point Interconnect table shall conform to the specifications listed in the table applicable to such meter under Section III(A)(2). |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
17019 | Cooper B | 39.95597, -80.26908 | 720 | 1,220 | 78,500 |
11798 | Roberts 1 | 39.94097, -80.326422 | 720 | 320 | 19,600 |
17018 | Roberts 2 | 39.94097, -80.25422 | 720 | 320 | 19,600 |
11796 | McMillen | 39.9836, -80.1209 | 720 | 710 | 45,900 |
M5256116 | McMillen 2 MM - 1 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
M5256117 | McMillen 2 MM - 2 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
M5256118 | McMillen 2 MM - 3 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
17042 | Pyles 1 | 39.969918, -80.110996 | 1,440 | 1,670 | 78,500 |
M5224755 | Pyles 2 | 39.96643, -80.1116 | 1440 | 1,227 | 64,353 |
17035 | Hildebrand | 39.974133, -80.096991 | 720 | 650 | 45,900 |
17022 | Robison 1 | 39.979817, -80.072114 | 720 | 680 | 45,900 |
18156 | Robison 2 | 39.97799, -80.07021 | 720 | 720 | 45,900 |
17043 | Thompson 1 | 39.948602, -80.096748 | 720 | 680 | 45,900 |
17115 | Thompson 2 | 39.948602, -80.096748 | 720 | 680 | 45,900 |
11797 | Thistlewaite | 39.96395, -80.100731 | 720 | 320 | 19,600 |
17044 | Conner 1 | 39.946228, -80.240644 | 720 | 680 | 45,900 |
5100003 | Conner 2 | 39.946228, -80.240644 | 720 | 680 | 45,900 |
17037 | Phillips | 39.933614, -80.293665 | 1,400 | 1,150 | 115,300 |
18155 | Walker B | 39.934471, -80.318565 | 1,400 | 1,600 | 67,500 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
5100014 | Scott’s Run 1 | 39.93239, -80.32793 | 1,400 | 2,700 | 115,300 |
5100015 | Scott’s Run 2 | 39.93239, -80.32793 | 1,400 | 2,700 | 115,300 |
M5225755 | Scott's Run 3 | 39.93237, -80.32812 | 1,400 | 1,227 | 64,353 |
5100065 | Moore MM B Run | 39.92772, -80.33715 | 1,400 | 2,700 | 115,300 |
M5277181 | Moore MM Run 2 | 39.92763, -80.33740 | 1440 | 1,150 | 28,800 |
5100039 | West Run (NIJUS25) | 39.913752, -80.303533 | 1,400 | 2,700 | 115,300 |
5100053 | West Run – Hopewell Ridge | 39.91312, -80.30316 | 1,400 | 2,511 | 87,994 |
5100055 | Patterson 1 | 39.936506 , -80.310759 | 1,400 | 2,700 | 115,300 |
5100063 | Patterson 2 | 39.936506 , -80.310759 | 1,400 | 2,700 | 115,300 |
5100057 | Nicoloff 1 | 39.954037, -80.065039 | 720 | 720 | 45,900 |
M5224083 | Nicoloff 2 | 39.954037, -80.065039 | 720 | 1,227 | 44,838 |
5100018 | Pierce 1 | 39.90734, -80.28209 | 720 | 2,630 | 78,500 |
5100019 | Pierce 2 | 39.90734, -80.28209 | 720 | 2,630 | 78,500 |
5100064 | Pierce 3 | 39.90734, -80.28209 | 720 | 2,630 | 45,900 |
M5213961 | Big Sky 1 | 39.99805556,-80.20277 | 720 | 1,750 | 78,500 |
M5213962 | Big Sky 2 | 39.99805556, -80.20277 | 720 | 1,750 | 78,500 |
M5213963 | Big Sky 3 | 39.99805556, -80.20277 | 720 | 1,030 | 45,900 |
M5220213 | Petit 1 | 39.94523, -80.23994 | 720 | 1,227 | 44,838 |
M5220220 | Petit 2 | 39.94523, -80.23994 | 720 | 1,227 | 44,838 |
M5220221 | Petit 3 | 39.94523, -80.23994 | 720 | 726 | 26,240 |
M5248813 | Petit 4 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
M5248814 | Petit 5 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
M5248816 | Petit 6 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
M5254623 | Petit 7 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
M5224627 | Alpha 1 | 39.960097, -80.130604 | 720 | 1,227 | 44,838 |
M5224714 | Alpha 2 | 39.960097, -80.130604 | 720 | 1,227 | 44,838 |
M5274373 | Alpha 3 | 39.960097, -80.130604 | 720 | 1,950 | 35,500 |
M5234610 | Moninger Run 1 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
M5234612 | Moninger Run 2 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
M5234613 | Moninger Run 3 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
M5235813 | Moninger Run 4 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
M5234486 | Koloski Run 1 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
M5234487 | Koloski Run 2 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
M5234488 | Koloski Run 3 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
17020 | Iames | 40.0308, -80.15266 | 720 | 726 | 37,660 |
M5219031 | Shipman 1 | 39.991551, -80.194235 | 720 | 726 | 37,660 |
M5219033 | Shipman 2 | 39.991551, -80.194235 | 720 | 1,227 | 64,353 |
M5258883 | Shipman Gathering MM - Run 3 | 39.991551, -80.194235 | 720 | 1,950 | 35,500 |
33297 | Ingram 590004 | 39.93929, -80.26466 | 720 | 356 | 16,118 |
33341 | ROG46H1 | 39.94097, -80.26422 | 720 | 356 | 16,118 |
M5210064 | Lacko 1 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
M5210065 | Lacko 2 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
M5210066 | Lacko 3 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
M5234259 | Yablonski 1 | 39.99347, -80.06271 | 1440 | 1,227 | 64,353 |
M5234260 | Yablonski 2 | 39.99347, -80.06271 | 1440 | 1,227 | 64,353 |
M5226733 | Beazer 1 | 39.92417, -80.10866 | 1440 | 1,227 | 64,353 |
M5226735 | Beazer 2 | 39.92417, -80.10866 | 1440 | 1,227 | 64,353 |
M5249530 | Beazer 3 | 39.92417, -80.10866 | 1440 | 1,556 | 57,163 |
M5238116 | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
M5238117 | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
M5248049 | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
M5241305 | Harden Farm 1 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
M5241307 | Harden Farm 2 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
M5241308 | Harden Farm 3 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
M5274165 | Green Hill - Meter 1 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
M5274166 | Green Hill - Meter 2 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
M5274167 | Green Hill - Meter 3 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
M5272524 | Harris | 39.95349, -80.19008 | 720 | 1,800 | 49,000 |
M5291357 | Harris Run B | 39.95349, -80.19008 | 720 | 1,800 | 49,000 |
McMillen 2 MM – 1, M5256116 McMillen 2 MM – 2, M5256117 McMillen 2 MM – 3, M5256118 STATION EQUIPMENT | REQUIRED | DESIGN SPECIFICATIONS | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
EQT Pipeline-Tap & Valve | Yes | Company | Company | Company | Company | Company |
Inlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Station & Outlet Piping | Yes | Company | Customer | Customer | Company | Customer |
Test Station - inlet piping | No | |||||
Test Station - outlet piping | Yes | Company | Company | Company | Company | Company |
Corrosion coupon | Yes | Company | Company | Company | Company | Company |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Company | Customer | Customer | Customer | Customer |
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Company | Customer | Customer | Company | Customer |
Meter & Flow Control Risers, Valves, etc… | Yes | Company | Customer | Customer | Company | Customer |
Electronic Measurement & Telecomm Hardware | Yes | Company | Customer | Customer | Company | Customer |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Continuous Sampler | No | |||||
H2O Dew Point Analyzer | No | |||||
Oxygen Analyzer | No | |||||
H2S Monitor | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Primary Pressure Control | No | |||||
Overpressure Device | Yes | Company | Customer | Customer | Company | Customer |
Station Isolation Valve | Yes | Company | Customer | Customer | Company | Customer |
Flow Control Valve | No | |||||
Heat | No | |||||
Check Valve | Yes | Company | Customer | Customer | Company | Customer |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication Service(s) | Yes | Company | Customer | Customer | Company | Customer |
Electrical Service | Yes | Company | Customer | Customer | Company | Customer |
Building - Gas Chromatograph | No | |||||
Building - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Company | Customer | Customer | Company | Customer |
Air Permit | No | |||||
Moore MM B Run, 5100065 Moore MM Run 2, M5277181 STATION EQUIPMENT | REQUIRED | DESIGN | INSTALL | OWNERSHIP | OPERATE | MAINTAIN | SPECIAL PROVISIONS/ EQUIPMENT SPECS. |
PIPING | |||||||
Pipeline-Tap & Valve | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | 12” Tee |
Inlet & Station Piping | Yes | Producer | Producer | Producer | Producer | Producer | |
Outlet & Station Piping | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 12” |
Test Station - inlet piping | Yes | Producer | Producer | Producer | Producer | Producer | |
Test Station - outlet piping | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
Corrosion coupon | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
GAS CONDITIONING | |||||||
Filter Separator | Yes | Gatherer | Producer | Producer | Producer | Producer | LLSO - 16" Barrel & Shawndra Filter |
Liquid Level Shutoff | No | ||||||
MEASUREMENT | |||||||
Meter & Meter Runs | Yes | Gatherer | Producer | Producer | Gatherer | Producer | (2) 8” Orifice |
Meter & Flow Control Risers, Valves, etc… | Yes | Gatherer | Producer | Producer | Gatherer | Producer | |
Electronic Measurement & Telecom Hardware | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Eagle/1 RTU (ea meter) |
GAS QUALITY | |||||||
Chromatograph | No | ||||||
Continuous Sampler | No | ||||||
H2O Dew Point Analyzer | No | ||||||
Oxygen Analyzer | No | ||||||
H2S Monitor | No | ||||||
PRESSURE / FLOW CONTROL | |||||||
Primary Pressure Control | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” CV/OPP |
Overpressure Device | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” OPP |
Station Isolation Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 8” |
Flow Control Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” CV (same devices as Primary Pressure. Control.) |
Heat | No | ||||||
Check Valve | Yes | Gatherer | Producer | Producer | Producer | Producer | 2 X 8” |
ODORIZATION | |||||||
Odorizer & Controls | No | ||||||
MISCELLANEOUS | |||||||
Communication service | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | Radio or Cell |
Electrical Service | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Solar |
Building - Gas Chromatograph | No | ||||||
Building - Odorizer | No | ||||||
Fence/Vehicle Barrier/Signage | Yes | Gatherer | Producer | Producer | Gatherer | Producer | |
Air Permit | No | ||||||
Alpha 1, M5224627 Alpha 2, M5224714 Alpha 3, M5274373 STATION EQUIPMENT | REQUIRED | DESIGN | INSTALL | OWNERSHIP | OPERATE | MAINTAIN | SPECIAL PROVISIONS/ EQUIPMENT SPECS. |
PIPING | |||||||
Pipeline-Tap & Valve | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | 10” hot tap |
Inlet & Station Piping | Yes | Producer | Producer | Producer | Producer | Producer | 10” minimum |
Outlet & Station Piping | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 10” minimum |
Test Station - inlet piping | Yes | Producer | Producer | Producer | Producer | Producer | |
Test Station - outlet piping | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
Corrosion coupon | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
GAS CONDITIONING | |||||||
Filter Separator | Yes | Gatherer | Producer | Producer | Producer | Producer | EQT Approved Peco Cyclotube |
Liquid Level Shutoff | No | ||||||
MEASUREMENT | |||||||
Meter & Meter Runs | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Two 8” orifice |
Meter & Flow Control Risers, Valves, etc… | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Valves for 8” meter skid |
Electronic Measurement & Telecom Hardware | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Eagle/1 RTU (for each meter) |
GAS QUALITY | |||||||
Chromatograph | No | ||||||
Continuous Sampler | No | ||||||
H2O Dew Point Analyzer | No | ||||||
Oxygen Analyzer | No | ||||||
H2S Monitor | No | ||||||
PRESSURE / FLOW CONTROL | |||||||
Primary Pressure Control | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Primary and Monitor control valves are req'd UNLESS a Rupture Pin Valve is installed |
Overpressure Device | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Rupture Pin Valve or Primary and Monitor Control Valve |
Station Isolation Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Manual valve at header |
Flow Control Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | In lieu of flow control valve, OPP is acceptable |
Heat | No | ||||||
Check Valve | Yes | Gatherer | Producer | Producer | Producer | Producer | For each 8” meter skid |
ODORIZATION | |||||||
Odorizer & Controls | No | ||||||
MISCELLANEOUS | |||||||
Communication service | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | Cell Modem |
Electrical Service | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Solar & Battery |
Building - Gas Chromatograph | No | ||||||
Building - Odorizer | No | ||||||
Fence/Vehicle Barrier/Signage | Yes | Gatherer | Producer | Producer | Gatherer | Producer | |
Air Permit | No | ||||||
Shipman Gathering MM – Run 1, M5219031 Shipman Gathering MM – Run 2, M5219033 Shipman Gathering MM – Run 3, M5258883 STATION EQUIPMENT | REQUIRED | DESIGN | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
Pipeline-Tap & Valve | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer |
Inlet & Station Piping | Yes | Producer | Producer | Producer | Producer | Producer |
Outlet & Station Piping | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Test Station - inlet piping | Yes | Producer | Producer | Producer | Producer | Producer |
Test Station - outlet piping | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer |
Corrosion coupon | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Gatherer | Producer | Producer | Producer | Producer |
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Meter & Flow Control Risers, Valves, etc… | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Electronic Measurement & Telecom Hardware | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Continuous Sampler | No | |||||
H2O Dew Point Analyzer | No | |||||
Oxygen Analyzer | No | |||||
H2S Monitor | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Primary Pressure Control | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Overpressure Device | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Station Isolation Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Flow Control Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Heat | No | |||||
Check Valve | Yes | Gatherer | Producer | Producer | Producer | Producer |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication service | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer |
Electrical Service | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Building - Gas Chromatograph | No | |||||
Building - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Gatherer | Producer | Producer | Gatherer | Producer |
Air Permit | No | |||||
Green Hill- Meter 1, M5274165 Green Hill- Meter 2, M5274166 Green Hill- Meter 3, M5274167 STATION EQUIPMENT | REQUIRED | DESIGN SPECIFICATIONS | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
EQT Pipeline-Tap & Valve | Yes | Company | Company | Company | Company | Company |
Inlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Station & Outlet Piping | Yes | Company | Customer | Customer | Company | Customer |
Test Station - inlet piping | Yes | Customer | Customer | Customer | Customer | Customer |
Test Station - outlet piping | Yes | Company | Company | Company | Company | Company |
Corrosion coupon | Yes | Company | Company | Company | Company | Company |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Company | Customer | Customer | Customer | Customer |
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Company | Customer | Customer | Company | Customer |
Meter & Flow Control Risers, Valves, etc… | Yes | Company | Customer | Customer | Company | Customer |
Electronic Measurement & Telecomm Hardware | Yes | Company | Customer | Customer | Company | Customer |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Continuous Sampler | No | |||||
H2O Dew Point Analyzer | No | |||||
Oxygen Analyzer | No | |||||
H2S Monitor | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Primary Pressure Control | Yes | Company | Customer | Customer | Company | Customer |
Overpressure Device | Yes | Company | Customer | Customer | Company | Customer |
Station Isolation Valve | Yes | Company | Customer | Customer | Company | Customer |
Flow Control Valve | No | |||||
Heat | No | |||||
Check Valve | Yes | Company | Customer | Customer | Company | Customer |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication Service(s) | Yes | Company | Customer | Customer | Company | Customer |
Electrical Service | Yes | Company | Customer | Customer | Company | Customer |
Building - Gas Chromatograph | No | |||||
Building - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Company | Customer | Customer | Company | Customer |
Air Permit | No | |||||
Harris, M5272524 Harris Run B, M5291357 STATION EQUIPMENT | REQUIRED | DESIGN SPECIFICATIONS | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
EQT Pipeline-Tap & Valve | Yes | Company | Company | Company | Company | Company |
Inlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Station & Outlet Piping | Yes | Company | Customer | Customer | Company | Customer |
Test Station - inlet piping | No | |||||
Test Station - outlet piping | Yes | Company | Company | Company | Company | Company |
Corrosion coupon | Yes | Company | Company | Company | Company | Company |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Company | Customer | Customer | Customer | Customer |
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Company | Customer | Customer | Company | Customer |
Meter & Flow Control Risers, Valves, etc… | Yes | Company | Customer | Customer | Company | Customer |
Electronic Measurement & Telecomm Hardware | Yes | Company | Customer | Customer | Company | Customer |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Continuous Sampler | No | |||||
H2O Dew Point Analyzer | No | |||||
Oxygen Analyzer | No | |||||
H2S Monitor | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Primary Pressure Control | No | |||||
Overpressure Device | Yes | Company | Customer | Customer | Company | Customer |
Station Isolation Valve | Yes | Company | Customer | Customer | Company | Customer |
Flow Control Valve | No | |||||
Heat | No | |||||
Check Valve | Yes | Company | Customer | Customer | Company | Customer |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication Service(s) | Yes | Company | Customer | Customer | Company | Customer |
Electrical Service | Yes | Company | Customer | Customer | Company | Customer |
Building - Gas Chromatograph | No | |||||
Building - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Company | Customer | Customer | Company | Customer |
Air Permit | No | |||||