| Attn: |
Ken Schuler, Craig Arakawa, Mindy Hooker, Kevin Stertzel
|
| Re: |
Loma Negra Compañía Industrial Argentina Sociedad Anónima Amendment No. 1 to Form 20-F for the Year Ended December 31, 2021 File No. 1-38262
|
|
1.
|
We reviewed your reserve disclosure and noted the sale price for your salable products, which serve as a basis of your reserve determination, was not disclosed in your filing as required the footnotes to Tables
1 and 2 of paragraph (b) for Item 1303 of Regulation S- K. In addition, the metallurgical recoveries were not disclosed for your material properties as required by Items 1304(d)(1) of Regulation S-K. Please modify your filing and include
these modification factors for each of your properties with your reserve tables.
|
|
2.
|
We note your individual material property disclosure beginning in this section. Please modify your filing and locate each of your material properties within one mile, using an easily recognizable coordinate
system to comply with Item 1304(b)(1)(i) of Regulation S- K.
|
|
3.
|
Please modify your filing and include the book value for your material property as required by Item 1304(b)(2)(iii) of Regulation S-K.
|
|
4.
|
Please modify your filing to locate your property to within one-mile using an easily recognizable coordinate system. In addition, please enlarge your maps and illustrations to make them legible as required by
Item 601(B)(96)(iii)(b)(3)(i) of Regulation S-K.
|
|
5.
|
Please modify your filing to provide a cross-section of the local geology as required by Item 601(B)(96)(iii)(b)(6)(iii) of Regulation S-K.
|
|
6.
|
We reviewed the mineral processing section of your technical report summary. Please modify your filing to include the QP’s opinion on the adequacy of the data and state the metallurgical recovery as required by
Item 601(B)(96)(iii)(b)(10)(v) of Regulation S-K.
|
|
7.
|
We note you did not disclose a reserve price or metallurgical recovery for your reserve estimates. Please state the price and recovery used to determine your reserves and disclose, with particularity, the
reasons this price was selected and any assumptions underlying this selection. See Item 601(B)(96)(iii)(b)(12)(iii) of Regulation S-K.
|
|
8.
|
Please modify your technical report to provide the annual Life of Mine (LOM) production schedule for your limestone and waste production as required by Item 601(B)(96)(iii)(b)(13) of Regulation S-K.
|
|
9.
|
We note you did not disclose a commodity price forecast in the section. Please modify your technical report to disclose your cement price projections and the basis for your commodity price forecast as used in
your economic evaluation as required by Item 601(B)(96)(iii)(b)(16) of Regulation S-K.
|
|
10.
|
We note you did not disclose an accuracy estimate with your capital and operating cost estimates as required by Item 601(B)(96)(iii)(b)(18)(i) of Regulation S-K.
Please modify your filing to include your accuracy estimate and discuss how the annual operating costs in this section relate to the operating costs presented in the economic analysis.
|
|
11.
|
Please modify your technical report to include the annual mined material tonnage in your cash flow analysis as required by Item 601(B)(96)(iii)(b)(19) of Regulation
S-K.
|
|
|
Very truly yours, |
|
|
|
|
|
|
|
|
|
|
|
/s/ Marcos I. Gradin |
|
|
Marcos I. Gradin |
|
|
Chief Financial Officer |
|
|
Loma Negra Compañía Industrial Argentina Sociedad Anónima |
|
Proven mineral reserves
|
Probable mineral reserves
|
Total mineral reserves
|
||||||||||||||||||||||
|
Amount
|
Grades/
Qualities
|
Amount
|
Grades/
Qualities
|
Amount
|
Grades/
Qualities
|
|||||||||||||||||||
|
(Million Tonnes)
|
(% CaO)
|
(Million Tonnes)
|
(% CaO)
|
(Million Tonnes)
|
(% CaO)
|
|||||||||||||||||||
|
Limestone:*
|
||||||||||||||||||||||||
|
Doña Amalía
|
53.6
|
43.96
|
56.2
|
44.6
|
109.8
|
44.2
|
||||||||||||||||||
|
Piedras Blancas
|
0.3
|
50.9
|
0.3
|
50.9
|
0.6
|
50.9
|
||||||||||||||||||
|
El Salitral y Cerro Bayo
|
31.5
|
44.1
|
48.4
|
43.7
|
79.9
|
43.8
|
||||||||||||||||||
|
Barker
|
44.5
|
46.4
|
27
|
46.1
|
71.5
|
46.2
|
||||||||||||||||||
|
La Pampita y Entorno** (Don Gabino –
Los Abriles – SASII)
|
591.4
|
47.4
|
35.3
|
47.1
|
626.7
|
47.4
|
||||||||||||||||||
|
Cerro Soltero I
|
-
|
-
|
53.5
|
-
|
53.5
|
-
|
||||||||||||||||||
|
Cerro Soltero II
|
-
|
-
|
111.6
|
-
|
111.6
|
-
|
||||||||||||||||||
|
El Cerro
|
-
|
-
|
37.6
|
-
|
37.6
|
-
|
||||||||||||||||||
|
Granitic aggregates:*
|
||||||||||||||||||||||||
|
La Preferida
|
61.8
|
-
|
54.2
|
-
|
116
|
-
|
||||||||||||||||||






|
*INDEC: Nation
|
|
**YoY variation of Loma Negra's Net Revenue of cement, masonry and lime/Sales Volume of Cement, masonry
and lime
|
|
***Variation of the average exchange rate (Communication “A” 3500) reported by the Central Bank for U.S.
dollars
|
|
Cash Flow (US$ million)
|
2022e
|
2023e
|
2024e
|
2025e
|
2026e
|
2027e
|
2028e
|
2029e
|
2030e
|
2031e
|
2032e
|
2033e
|
2034e
|
2035e
|
2036e
|
2037e
|
2038e
|
2039e
|
2040e
|
2041e
|
2042e
|
|
Limestone Mined used Tonnes
(million)
|
5.6
|
5.7
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
|
Cement Tonnes (million)
|
4.0
|
4.1
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
|
Revenue
|
406
|
402
|
407
|
403
|
399
|
395
|
391
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
|
Operating Costs (-)
|
223
|
218
|
221
|
220
|
220
|
220
|
221
|
222
|
223
|
224
|
226
|
227
|
228
|
229
|
229
|
229
|
230
|
230
|
230
|
230
|
230
|
|
SG&A (-)
|
17
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
|
EBITDA
|
180
|
178
|
179
|
175
|
171
|
167
|
163
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
|
D&A (-)
|
14
|
10
|
9
|
8
|
7
|
7
|
8
|
9
|
10
|
12
|
13
|
14
|
15
|
16
|
16
|
17
|
17
|
17
|
17
|
17
|
17
|
|
Taxable Income
|
166
|
168
|
170
|
167
|
164
|
159
|
155
|
150
|
149
|
147
|
146
|
145
|
144
|
143
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
|
Income Tax (-)
|
58
|
59
|
60
|
59
|
57
|
56
|
54
|
52
|
52
|
51
|
51
|
51
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
|
Working Capital (-)
|
8
|
10
|
10
|
8
|
8
|
6
|
5
|
4
|
3
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
|
Capital Expenses (-)
|
26
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
|
Free Cash Flow
|
88
|
82
|
82
|
81
|
78
|
78
|
76
|
75
|
76
|
78
|
78
|
79
|
79
|
79
|
79
|
80
|
80
|
80
|
80
|
80
|
80
|
|
Cash Flow (US$ million)
|
2043e
|
2044e
|
2045e
|
2046e
|
2047e
|
2048e
|
2049e
|
2050e
|
2051e
|
2052e
|
2053e
|
2054e
|
2055e
|
2056e
|
2057e
|
2058e
|
2059e
|
2060e
|
2061e
|
2062e
|
2063e
|
|
Limestone Mined usedTonnes
(million)
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
|
Cement Tonnes (million)
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
|
Revenue
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
|
Operating Costs (-)
|
230
|
230
|
230
|
230
|
230
|
230
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
|
SG&A (-)
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
|
EBITDA
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
|
D&A (-)
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
|
Taxable Income
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
|
Income Tax (-)
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
|
Working Capital (-)
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
|
Capital Expenses (-)
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
|
Free Cash Flow
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
|
Cash Flow (US$ million)
|
2064e
|
2065e
|
2066e
|
2067e
|
2068e
|
2069e
|
2070e
|
2071e
|
2072e
|
2073e
|
2074e
|
2075e
|
2076e
|
2077e
|
2078e
|
2079e
|
2080e
|
2081e
|
2082e
|
2083e
|
2084e
|
|
Limestone Mined used Tonnes
(million)
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
5.9
|
|
Cement Tonnes (million)
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
4.2
|
|
Revenue
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
387
|
|
Operating Costs (-)
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
229
|
|
SG&A (-)
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
16
|
|
EBITDA
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
159
|
|
D&A (-)
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
17
|
|
Taxable Income
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
142
|
|
Income Tax (-)
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
50
|
|
Working Capital (-)
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
2
|
|
Capital Expenses (-)
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
27
|
|
Free Cash Flow
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
80
|
|
NPV (US$ million)
|
597
|
|
Discount Rate
|
13.4%
|