Date: January 27, 2025 | Change Order No. 6 | ||||
Reference: Scope Additions, Deletions and Modifications | |||||
Documents: Change Order Notices and Change Order Requests as per letters No: PQ-PRM-KZV-VGL-LET-00061 PQ-PRM-KZV-VGL-LET-00061, PQ-PRM-KZV-VGL-LET-00062, PQ-PRM-KZV-VGL-LET-00131-22, PQ-PRM-KZV-VGL-LET-00187-23, PQ-PRM-KZV-VGL-LET-00235, PQ-PRM-KZV-VGL-LET-00263-23, PQ-PRM-KZV-VGL-LET-00264-23, PQ-PRM-KZV-VGL-LET-00262-23, PQ-PRM-KZV-VGL-LET-00259-23, PQ-PRM-KZV-VGL-LET-00261-23, PQ-PRM-KZV-VGL-LET-00337-23, PQ-PRM-KZV-VGL-LET-00359-24, PQ-PRM-KZV-VGL-LET-00397-24, PQ-PRM-KZV-VGL-LET-00360-24, PQ-PRM-KZV-VGL-LET-00373-24, PQ-PRM-KZV-VGL-LET-0383-24, PQ-PRM-KZV-VGL-LET-00378-24, PQ-PRM-KZV-VGL-LET-00433-24, PQ-PRM-KZV-VGL-LET-00439-24, PQ-PRM-KZV-VGL-LET-00432-24, PQ-PRM-KZV-VGL-LET-00392-24, PQ-PRM-KZV-VGL-LET-00420 -24, and PQ-PRM-KZV-VGL-LET-00435-24. | |||||
| VG PCO No. | Notice Ref. | KZJV Change Proposal No. | KZJV Rev No. | KZJV PDN No. | Description | Target Price Change Amount | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Pre-Production Engineering and Testing (Recon COR#2) | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Test Pile Program Scope Transfer to KZJV | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Scope Transfer: Phase II pumps to Phase 1 for normal storm water operations | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Sewage Treatment Package | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Remove GIS and Transformer Scope | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Treated Gas Tie-In | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Liquid Knockout Equipment - Phase 1 | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Temporary Loop Check Facility | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Telecoms for Metering Station | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | GIS Building 2 | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Instruction to KZJV - Distributed Acoustic Sensing (DAS) System | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Removal of Weather Shelters from Scope of Work | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Remainder of Additional Telecoms Scope | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Concrete Paving – Truck Loading, Equipment Laydown, Chemical Canopy | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Site Security Contract Change from Allied to SDI | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Instruction to Contractor – Future Mitigation Tie-in points | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Initial Fill Supply of Chemicals and Catalysts - Phase 1 LPS 1-4 | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Two (2) additional Honeywell standard 64-channel FGS RIO cabinets | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | License for Baker-Hughes Experion Server - Phase 1 | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Aggregate | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Stand Alone Ramp for the Warehouse yard | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | LM Express - TREQ/Purchasing of Fire Detection Devices (Feedback from KZ needed) | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | New Fresh Water line | [***] | ||||||||||||||
[***] | [***] | [***] | [***] | [***] | Liquid Knockout Equipment – LPS4 | [***] | ||||||||||||||
| Total | [***] | |||||||||||||||||||
Initial Target Price: | [***] | ||||
Current Target Price: | [***] | ||||
Value of Change Order: | [***] | ||||
Adjusted Target Price as a result of this Change Order: | [***] | ||||
Venture Global Plaquemines LNG, LLC By: /s/ Keith Larson Name: Keith Larson Title: General Counsel and Secretary | KZJV LLC By: /s/ Stuart Nicholson Name: Stuart Nicholson Title: Project Director | ||||
By: /s/ Mark Hunter Name: Mark Hunter Title: Deputy Project Director | |||||